ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606

Registered No litigation declared Residential / Group Housing project

ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606

By Chandrashekhar Suryakant Morvekar

RG-MH-40930 · RERA P52900049692 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
23 of 66Construction stages doneacross 6 buildings; furthest along: External plumbing and external plaster, 90%
100 of 155Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606 is a Residential / Group Housing project by Chandrashekhar Suryakant Morvekar in Sindhudurg, Maharashtra, registered with MahaRERA as P52900049692 on 22 Feb 2023. Possession is promised by 31 Mar 2029. 55 of the 155 units on this registration are recorded sold or booked, and 23 of 66 construction stages are filed complete.

At a glance

Project

  • NameATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606
  • TypeResidential / Group Housing
  • Location
    • Achara Malvan Road
    • Kolamb
    • Malwan
    • Sindhudurg
    • 416606
  • Pincode416606
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900049692
  • ReraGenie IDRG-MH-40930

Builder

  • NameChandrashekhar Suryakant Morvekar
  • Entity typeIndividual
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2023PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2023
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings6 building records
  • Documents filed84 files

Current status

35%55 of 155 units booked
46.7%Work done, per cost certificate

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA5520020
Building No 2 - Wing A and Wing BNA5540040
Building No 3 - Wing A and WIng BNA5535035
Building No 4NA5520020
Building No 5 Wing A and Wing BNA5540040
Building No A1NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

Building No 130%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 2 - Wing A and Wing B79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 3 - Wing A and WIng B76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 5 Wing A and Wing B80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes35%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes35%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Open Space36
BuildingOpen SpaceTotal
Building No 144
Building No 2 - Wing A and Wing B88
Building No 3 - Wing A and WIng B88
Building No 444
Building No 5 Wing A and Wing B1010
Building No A122

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,564 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Dec 2025
LandownerVillageDistrict
Chandrashekhar Suryakant MorvekarMalwan (M Cl)Sindhudurg
VILAS MANOHAR KAMTEKARAchareSindhudurg
SUHASINI VILAS KAMTEKARAchareSindhudurg

Approvals and building plan

Sanctioning authorityGrampanchayat Kolamb and Nayab Tahsildar Sub Divisional Officer Kudal
Permissible FSI13625.71
Proposed, not sanctioned8,460 sq m
Buildings approved7
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMalvan
Estimated costRs 15.67 cr
Cost incurredRs 7.32 cr
Work done46.69%
BuildingWingEstimatedIncurred
Building No 1NARs 3.61 cr-
Building No 2 - Wing A and Wing BNARs 3.61 crRs 1.83 cr
Building No 3 - Wing A and WIng BNARs 3.61 crRs 1.83 cr
Building No 5 Wing A and Wing BNARs 3.61 crRs 1.83 cr
-NARs 1.22 crRs 1.83 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Suryakant Morvekar
EngineerManoj Joshi
EngineerPrathamesh Jaywant Tawade
Chartered AccountantSatish Dakare
Chartered AccountantHaidar Mujawar and Associates
PartnerRole in project
Chandrashekhar Suryakant Morvekar-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A Q4 FY 2024-25.pdf2 May 2026
Withdrawal Update Form 1File: Form 1 Q2 25-26 Athang Sai.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3 25-26 Athang Sai.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2 Q2 25-26 Athang Sai.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2 Q3 25-26 Athang Sai.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3 Q2 25-26 Athang Sai.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3 Q3 25-26 Athang Sai.pdf15 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 Athang Sai FY 24-25.pdf15 Apr 2026
Form 1File: Form 1 Q4 FY 2024-25.pdf8 Apr 2026
Form 2File: Form 2 Q4 FY 2024-25.pdf8 Apr 2026
Form 3File: Form 3 Q4 FY 2024-25.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q4 FY 2024-25.pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1 Q1 FY 2025-26.pdf8 Apr 2026
Withdrawal Update Form 2File: Form 2 Q1 FY 2025-26.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3 Q1 FY 2025-26.pdf8 Apr 2026
Form 1File: Form 1 Q3 FY 2024-25 Athang sai.pdf8 Dec 2025
Form 2File: Form 2 Q3 FY 2024-25 Athang sai.pdf8 Dec 2025
Form 3File: Form 3 Q3 FY 2024-25 Athang sai_compressed.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Athang Sai Q3 24-25 (1).pdf8 Dec 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5 Athang Sai FY 2023-24.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 FY 2024-25 Athang sai.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 FY 2024-25 Athang sai.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 2024-25 Athang sai_compressed.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rera Certificate Athang Sai Q2 24-25_compressed.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 FY 2024-25 Athang sai.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 FY 2024-25 Athang sai.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Athang Sai Q1 24-25_compressed.pdf5 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Athang Sai Q2 24-25_compressed.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Artitect Certificate Q4 2023-24.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q4 2023-24.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Certificate Q4 2023-24.pdf26 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory Q4 FY 2023-24.pdf26 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Q2 2023-24.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Athang Sai FY 21-22 HMA.pdf3 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March.pdf15 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory June.pdf15 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory September.pdf15 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 2022-2023.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March.pdf9 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June.pdf9 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 September.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 September.pdf9 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A.pdf9 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March.pdf9 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March_compressed.pdf9 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June.pdf9 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 September.pdf9 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 2022-2023.pdf9 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Athang Sai Q4 2022-23.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Athang Sai Q1 2023-24.pdf23 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Athang Sai Project Tahsildar N A permission.pdf1 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate Athang Sai Homes.pdf1 Feb 2023
Layout approvalFile: TP Layout Approval.pdf31 Jan 2023
Copy of Layout Approval (in case of layout)File: TP Layout Approval.pdf31 Jan 2023
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal.pdf28 Jan 2023
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal.pdf28 Jan 2023
Copy of the legal title reportFile: Legal Title Reprt Athang Sai Homes.pdf23 Jan 2023
Proforma of Agreement for saleFile: ATHANG SAI HOMES AGREEMENT FOR SALE OF FLAT (1).pdf23 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Agreement for Sale deviation report.pdf23 Jan 2023
Details of encumbrances concerned to FinanceFile: Declaration of No Legal Encumbrance Letter for Morvekar Realtor.pdf21 Jan 2023
Details of encumbrances concerned to LegalFile: Declaration of No Legal Encumbrance Letter for Morvekar Realtor.pdf21 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Organizations.pdf21 Jan 2023
Proforma of Allotment letterFile: Proforma of Allotment Letter Athang Sai Homes.pdf21 Jan 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf21 Jan 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf20 Jan 2023
Declaration in FORM BFile: Form B.pdf20 Jan 2023
PAN CardFile: Chandrashekhar Morvekar Pan Card.pdf19 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate project.pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Arch Certificate Bldg No 1.pdf4 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Arch Certificate Bldg No 2.pdf4 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Arch Certificate Bldg No 3.pdf4 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Arch Certificate Bldg No 4.pdf4 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Arch Certificate Bldg No 5.pdf4 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Arch Certificate Bldg No A1.pdf4 Jan 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Athang HomesAthang Homes near vharanda bus stop villege raneshemadvadi ozar malvan taluka malvan district sindhudurg state maharashtra 416606104CompletedDec 2025Dec 2023

How this compares with Sindhudurg

35%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep ATHANG SAI HOMES on S No 32/8/2 and 34/1B of on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolamb530+ in Sindhudurg

2 kmATHANG SAI HOMES on S NoCompleted 2Lapsed / revoked 1Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: Chandrashekhar Suryakant Morvekar

CHANDRASHEKHAR SURYAKANT MORVEKAR has 5 registrations on MahaRERA, including SINDHUSHRUSHTI TOURISM VILLAGE PHASE II and ATHANG HOMES Project By Morvekar Realtors. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606 is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606?

The registered promoter entity is Chandrashekhar Suryakant Morvekar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606?

The professionals named in the filing: Architect: Sachin Suryakant Morvekar; Engineer: Manoj Joshi; Engineer: Prathamesh Jaywant Tawade; Chartered Accountant: Satish Dakare; Chartered Accountant: Haidar Mujawar and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATHANG SAI HOMES on S No 32/8/2 and 34/1B of to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.