Home / Browse projects / Sindhudurg, Maharashtra / AXIS BLUES

Registered No litigation declared Commercial project

AXIS BLUES

By EEJAK HOLDINGS PRIVATE LIMITED

RG-MH-04322 · RERA P52900021725 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 41 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 41 months from the original
12 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
23 of 128Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

AXIS BLUES is a Commercial project by EEJAK HOLDINGS PRIVATE LIMITED in Sindhudurg, Maharashtra, registered with MahaRERA as P52900021725 on 22 Jul 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 41 months from the original filing. 105 of the 128 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameAXIS BLUES
  • TypeCommercial
  • Location
    • 416512
    • Yog Resort
    • Maneri
    • Dodamarg
    • Sindhudurg
  • Pincode416512
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900021725
  • ReraGenie IDRG-MH-04322

Builder

  • NameEEJAK HOLDINGS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsAshish Kushwaha, Padmaja Kushwaha, Devesh Kumar
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2019First promiseJul 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Jul 2019
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Jul 2024)
  • Buildings3 building records
  • Documents filed84 files

Current status

82%105 of 128 units booked

Figures as on 5 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING BNA5433740
BUILDING ENA4444044
BUILDING HNA4444044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

BUILDING B64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
BUILDING E57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.47%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
BUILDING H56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed13

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots13
Closed/Covered1
Open Space12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityGrampanchayat
Permissible FSI5366.0
Proposed, not sanctioned5,366 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKaushambi, Ghaziabad

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace design Group
EngineerSpace design Group
Chartered AccountantSatya Prakash Kushwaha
Chartered AccountantAshok Jayesh and Associates
PartnerRole in project
EEJAK HOLDINGS PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900019832Jul 2024 → Jul 2025

Reason as filed by the promoterCOVID started immediately after our project launched and Heavy rain fall in the region hence require an extension u/s 6

EXT52900027777Jul 2024 → Dec 2027

Reason as filed by the promoterThe delay in the project is primarily due to the COVID-I9 pandemic, which affected development activities for two continuous years after its commencement in 2019. Additionally, the rising prices of steel and overall costs further impacted progress. Since Sindhudurg is a coastal region, it experiences continuous rainfall for nearly six months each year, further slowing down construction activities. These factors collectively contributed to the project's prolonged timeline, making it challenging to maintain the expected pace. Despite these setbacks, efforts are being made to overcome these obsta

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC12501860VINCENT LEWISEEJAK HOLDINGS PRIVATE LIMITED06/06/2025
CC12600892Nidhi MishraEEJAK HOLDINGS PRIVATE LIMITED18/02/2026
CC12602650SITA PRABHU DESSAIEEJAK HOLDINGS PRIVATE LIMITED07/05/2026
CC12602757Thudukurthi Prasanth KumarEEJAK HOLDINGS PRIVATE LIMITED11/05/2026
CC12602943Azaz Nizamuddin KhanEEJAK HOLDINGS PRIVATE LIMITED19/05/2026
CC12603049Colleta Ruby VazEEJAK HOLDINGS PRIVATE LIMITED23/05/2026
CC12603108Gibin Gipson GeorgeEEJAK HOLDINGS PRIVATE LIMITED25/05/2026
CC12603210Viddhesh Hanumant BelgaonkarEEJAK HOLDINGS PRIVATE LIMITED28/05/2026
CC12603359Mahesh RampurEEJAK HOLDINGS PRIVATE LIMITED01/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 BEH 21725 FY 24-25 Q3.pdf5 Jun 2026
Form 2File: Form 2 BEH 21725 FY 24-25 Q3.pdf5 Jun 2026
Form 3File: form 3 BEH 21725 FY 24-25 Q3.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: BEH 21725 FY 24-25 Q3 Disclosure of Sold-booked-unsold inventories.pdf5 Jun 2026
Form 1File: Form 1 BEH 21725 FY 24-25 Q4.pdf5 Jun 2026
Form 2File: Form 2 BEH 21725 FY 24-25 Q4.pdf5 Jun 2026
Form 3File: form 3 BEH 21725 FY 24-25 Q4.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: BEH 21725 FY 24-25 Q4 Disclosure of Sold-booked-unsold inventories.pdf5 Jun 2026
Form 1File: Form 1 BEH 21725 FY 25-26 Q1.pdf5 Jun 2026
Form 2File: Form 2 BEH 21725 FY 25-26 Q1.pdf5 Jun 2026
Form 3File: Form 3 BEH 21725 FY 25-26 Q1.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: BEH 21725 FY 25-26 Q1 Disclosure of Sold-booked-unsold inventories.pdf5 Jun 2026
Form 1File: Form 1 BEH 21725 FY 25-26 Q2.pdf5 Jun 2026
Form 2File: Form 2 BEH 21725 FY 25-26 Q2.pdf5 Jun 2026
Form 3File: Form 3 BEH 21725 FY 25-26 Q2.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: BEH 21725 FY 25-26 Q2 Disclosure of Sold-booked-unsold inventories.pdf5 Jun 2026
Form 1File: Form 1 BEH 21725 FY 25-26 Q3.pdf5 Jun 2026
Form 2File: Form 2 BEH 21725 FY 25-26 Q3.pdf5 Jun 2026
Form 3File: Form 3 BEH 21725 FY 25-26 Q3.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: BEH 21725 FY 25-26 Q3 Disclosure of Sold-booked-unsold inventories.pdf5 Jun 2026
Form 1File: Form 1 BEH 21725 FY 25-26 Q4.pdf5 Jun 2026
Form 2File: Form 2 BEH 21725 FY 25-26 Q4.pdf5 Jun 2026
Form 3File: Form 3 BEH 21725 FY 25-26 Q4.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: BEH 21725 FY 25-26 Q4 Disclosure of Sold-booked-unsold inventories.pdf5 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 BEH FY 24-25 Q1.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 BEH FY 24-25 Q2.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 BEH FY 24-25 Q3.pdf4 Apr 2025
Certificates of CA (Form 3)File: Form-3 P52900021725 FY 24-25 Q3.pdf31 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 P52900021725 FY 24-25 Q1.pdf31 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 P52900021725 FY 24-25 Q2.pdf31 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 P52900021725 FY 24-25 Q3.pdf31 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold or booked inventory BEH up to .pdf31 Mar 2025
Certificates of CA (Form 3)File: Form 3 Eejak FY 24-25 BEH Q1.pdf13 Jan 2025
Certificates of CA (Form 3)File: Form 3 Eejak FY 24-25 BEH Q2.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 BEH.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE BEH.pdf20 May 2024
Certificates of CA (Form 3)File: P52900021725 1 QTR.pdf14 May 2024
Certificates of CA (Form 3)File: P52900021725 2ND QTR.pdf14 May 2024
Certificates of CA (Form 3)File: P52900021725 4TH QTR.pdf14 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance related to Legal - BEH.pdf7 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance related to Legal - BEH.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR 1- B,E,H.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-2.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-3.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-4.pdf7 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory .pdf7 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure of interest in other real estate organizations.pdf7 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Separate Bank Account Declaration BEH.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 2023 BEH.pdf19 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: EC 2022 beh.pdf19 Feb 2024
Certificates of CA (Form 3)File: Rera Certificate-BEH.pdf19 Feb 2024
Certificates of CA (Form 3)File: Eejak Form3 BEH-min.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Eejak Form-5 BEH.pdf18 Oct 2023
Certificates of CA (Form 3)File: eejak beh form 3.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form-5 BEH.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificae BEH.pdf18 Jul 2022
Certificates of CA (Form 3)File: Rera BEH.pdf18 Jul 2022
Certificates of CA (Form 3)File: BEH.pdf4 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE BEH.pdf24 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Tower B,E,H.pdf3 Aug 2021
Disclosure of sold/ booked inventoryFile: TOWER B E H_compressed.pdf3 Aug 2021
Certificates of CA (Form 3)File: RERA CERTIFICATE_BEH.pdf27 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 eejak beh.pdf27 Jul 2021
Declaration about Commencement CertificateFile: EEJAK_BEH.pdf10 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATEBEH.pdf6 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECT CERTIFICATE - B,E, H.pdf4 Dec 2020
Certificates of CA (Form 3)File: TOWER-BEH.pdf4 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 B E H.pdf23 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: B E H.pdf19 Aug 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 B E H.pdf4 Aug 2020
Certificates of CA (Form 3)File: FORM 3 B E H.pdf4 Aug 2020
Proforma of Allotment letterFile: ATS - Blank Format Phase 2.pdf24 Sep 2019
Certificates of CA (Form 3)File: 025 - EEJAK HOLDINGS RERA.pdf21 Jul 2019
Building plan approvalFile: BUILDING APPROVAL PLAN.pdf2 Jul 2019
Layout approvalFile: LAYOUT PLAN.pdf2 Jul 2019
PAN CardFile: PAN_EEJAK.pdf2 Jul 2019
Copy of the legal title reportFile: Eejak holding Title report.pdf2 Jul 2019
Details of encumbrancesFile: NO ENCUMBRANCES CERTIFICATE.pdf2 Jul 2019
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf2 Jul 2019
Building Plan Approval (IOD)File: BUILDING APPROVAL PLAN.pdf2 Jul 2019

How this compares with Sindhudurg

82%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 41 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep AXIS BLUES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yog Resort530+ in Sindhudurg

Builder: EEJAK HOLDINGS PRIVATE LIMITED

EEJAK HOLDINGS PRIVATE LIMITED has 3 registrations on MahaRERA, including AXIS BLUES and AXIS BLUES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if AXIS BLUES is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AXIS BLUES?

The registered promoter entity is EEJAK HOLDINGS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AXIS BLUES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AXIS BLUES?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AXIS BLUES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AXIS BLUES?

The professionals named in the filing: Architect: Space design Group; Engineer: Space design Group; Chartered Accountant: Satya Prakash Kushwaha; Chartered Accountant: Ashok Jayesh and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AXIS BLUES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AXIS BLUES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AXIS BLUES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.