Home / Browse projects / Sindhudurg, Maharashtra / Nirmitee Avighna

Registered No litigation declared Residential / Group Housing project

Nirmitee Avighna

By NIRMITEE BUILDERS & DEVELOPERS

RG-MH-71706 · RERA P52900049381 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 90%
117 of 153Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Nirmitee Avighna is a Residential / Group Housing project by NIRMITEE BUILDERS & DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900049381 on 7 Feb 2023. Possession is promised by 31 Dec 2028. 36 of the 153 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameNirmitee Avighna
  • TypeResidential / Group Housing
  • Location
    • Kudal Bazarpeth
    • Near Topiwala Vachanalay
    • Kudal (CT)
    • Kudal
    • Sindhudurg
    • 416520
  • Pincode416520
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900049381
  • ReraGenie IDRG-MH-71706

Builder

  • NameNIRMITEE BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersAMOL ARVIND SHIRSAT, NEETA VIJAY PRABHU
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects5 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

24%36 of 153 units booked
87.5%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nirmitee AvighnaNA11101512153

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Nirmitee Avighna: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed135

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots135
Closed/Covered115
Open Space20

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,309 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
Declared on9 Jul 2025
LandownerVillageDistrict
Dattatray Vasant BandekarKudal (CT)Sindhudurg
Harshad Arvind BandekarMumbai CityMumbai City
Viraj Subhash BandekarKudal (CT)Sindhudurg
Mahesh Vasant BandekarKudal (CT)Sindhudurg

Approvals and building plan

Sanctioning authorityNagarPanchayat Kudal
Permissible FSI9274.43
Proposed, not sanctioned9,274 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBobhate Building, Pan Bazar, Taluka Kudal, Dist Sindhudurg 416520
Estimated costRs 16.00 cr
Cost incurredRs 14.00 cr
Work done87.5%
BuildingWingEstimatedIncurred
Nirmitee AvighnaNARs 15.80 crRs 14.00 cr
-NARs 20.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSameer Bhalchandra Joshi
EngineerAmol Arvind Shirsat
Chartered AccountantKhanolkar & Khanolkar LLP
Chartered AccountantYatin D Joshi
PartnerRole in project
NIRMITEE BUILDERS & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A NA 25-26.pdf9 May 2026
Withdrawal Update Form 1File: NA- Form 1-FY 25-26-Q4.pdf6 May 2026
Withdrawal Update Form 2File: NA-Form 2-FY 25-26-Q4.pdf6 May 2026
Withdrawal Update Form 3File: NA-Form 3-FY 25-26-Q4.pdf6 May 2026
Withdrawal Update Form 1File: NA-Form1-FY 25-26-Q3.pdf27 Jan 2026
Withdrawal Update Form 2File: NA-Form 2-FY25-26-Q3.pdf27 Jan 2026
Withdrawal Update Form 3File: NA-Form3-FY25-26-Q3.pdf27 Jan 2026
Form 2A (FY 2024-2025)File: NBD NA FY 24-25 Form 2A.pdf12 Nov 2025
Withdrawal Update Form 1File: NBD NA FY 25-26 Q2 Form 1.pdf11 Nov 2025
Withdrawal Update Form 2File: NBD NA-FY 25-26 Q2 Form 2.pdf11 Nov 2025
Withdrawal Update Form 3File: NBD-NA-FORM 3-FY 25-26-Q2.pdf11 Nov 2025
Withdrawal Update Form 1File: A1-Nirmitee Avighna Form 1.pdf27 Jul 2025
Withdrawal Update Form 1File: A1-Nirmitee Avighna Form 1.pdf27 Jul 2025
Withdrawal Update Form 2File: A2-Nirmitee Avighna Form 2.pdf27 Jul 2025
Withdrawal Update Form 2File: A2-Nirmitee Avighna Form 2.pdf27 Jul 2025
Withdrawal Update Form 3File: A3.pdf27 Jul 2025
Withdrawal Update Form 3File: A3.pdf27 Jul 2025
Form 5 (FY 2024-2025)File: NBD-Form 5 -Avighna -FY 24-25.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 8.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SD 24-25 Q4.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: QPR 24-25 Q4.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NBD Avighna Form 3.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration FY 24-25 Q3.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: QPR FY 24-25 Q 3.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: NBD-AVIGHNA-FORM 5.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QPR 24-25 Q 2.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Quarterly Progress Report.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: QPR FY 24-25 Q 1.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration FY 24-25 Q1.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 5.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: NBD-QPR.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NBD-Self Declaration.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NBD-SD-FY23-24-Q3.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate 4.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: QPR FY 22-23 Q3.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self-declaration-22-23-Q4.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration _ 23-24-Q1.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self-Declaration-23-24-Q2.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: QPR FY 22-23 Q4.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Self Declaration FY 22-23 Q4.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: QPR FY 23-24 Q1.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Self Declaration FY 23-24 Q1.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: QPR FY 23-24 Q2.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Self Declaration FY 23-24 Q2.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: NBD AVIGHNA-FORM 5-22-23.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate (3).pdf6 Jun 2023
Copy of the legal title reportFile: Title report .pdf1 Feb 2023
Layout approvalFile: Layout Plan.pdf26 Jan 2023
Building plan approvalFile: Ground-First Floor Plan.pdf26 Jan 2023
Building plan approvalFile: Second-Third-Fourth-Fifth-Sixth Floor Plan.pdf26 Jan 2023
Building plan approvalFile: Seventh-Eighth Floor Plan.pdf26 Jan 2023
Building plan approvalFile: Ninth-Tenth Floor Plan.pdf26 Jan 2023
Building plan approvalFile: Section Plan.pdf26 Jan 2023
Building plan approvalFile: Flat-Area Statement.pdf26 Jan 2023
Building plan approvalFile: NA Order.pdf26 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrance- Finance.pdf26 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrance- Legal.pdf26 Jan 2023
Details of encumbrances concerned to LegalFile: Encumbrance- Finance.pdf26 Jan 2023
Details of encumbrances concerned to LegalFile: Encumbrance- Legal.pdf26 Jan 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf26 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Ground-First Floor Plan.pdf26 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Second-Third-Fourth-Fifth-Sixth Floor Plan.pdf26 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Seventh-Eighth Floor Plan.pdf26 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Ninth-Tenth Floor Plan.pdf26 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Section Plan.pdf26 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Flat-Area Statement.pdf26 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf26 Jan 2023
CERSAI detailsFile: Undertaking-Cersai.pdf26 Jan 2023
Proforma of Agreement for saleFile: NBD-Agreement to sale-NA.pdf26 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation-agreement to sale.pdf26 Jan 2023
Declaration about Commencement CertificateFile: Declaration Commencement Certificate.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf17 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Saperate bank account.pdf17 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf17 Jan 2023
PAN CardFile: Pan card.pdf16 Jan 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
NIRMITEE VEDANTAbhinavnagar No 2 Kudal Dist Sindhudurg29CompletedApr 2017Apr 2017
NIRMITEE ESHANNear Kudal Railway Station Kudal Dist Sindhudurg62CompletedApr 2017Apr 2017
NIRMITEE SHUBHAMNear Kudal Railway Station Kudal Dist Sindhudurg79CompletedAug 2015Aug 2015
NIRMITEE OMKARNear Pinguli Titha Taluka Kudal Dist Sindhudurg47CompletedJun 2015Jun 2015

How this compares with Sindhudurg

24%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep Nirmitee Avighna on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Topiwala Vachanalay530+ in Sindhudurg

2 kmNirmitee AvighnaCompleted 17Lapsed / revoked 13Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: NIRMITEE BUILDERS & DEVELOPERS

NIRMITEE BUILDERS & DEVELOPERS has 5 registrations on MahaRERA, including NIRMITEE LAXMINARAYAN and NIRMITEE NANDAN. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if Nirmitee Avighna is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nirmitee Avighna?

The registered promoter entity is NIRMITEE BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nirmitee Avighna?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nirmitee Avighna?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nirmitee Avighna?

The professionals named in the filing: Architect: Sameer Bhalchandra Joshi; Engineer: Amol Arvind Shirsat; Chartered Accountant: Khanolkar & Khanolkar LLP; Chartered Accountant: Yatin D Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nirmitee Avighna?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nirmitee Avighna. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nirmitee Avighna to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.