Home / Browse projects / Sindhudurg, Maharashtra / AXIS BLUES
AXIS BLUES
By EEJAK HOLDINGS PRIVATE LIMITED
RG-MH-27894 · RERA P52900024380 · Last updated on MahaRERA portal: 16 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 6 months past the filed date
- 36 complaints at MahaRERA
- Completion date moved by 18 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AXIS BLUES is a Commercial project by EEJAK HOLDINGS PRIVATE LIMITED in Sindhudurg, Maharashtra, registered with MahaRERA as P52900024380 on 10 Feb 2020. Possession was promised by 30 Apr 2026 and is now 6 months past that date. The completion date has moved by 18 months from the original filing. 134 of the 172 units on this registration are recorded sold or booked, and 15 of 44 construction stages are filed complete. 36 complaints are on record with the regulator.
At a glance
Project
- NameAXIS BLUES
- TypeCommercial
- Location
- YOG CITY MAIN ROAD
- YOG CITY
- Maneri
- Dodamarg
- Sindhudurg
- 416512
- Pincode416512
- RERA no.P52900024380
- ReraGenie IDRG-MH-27894
Builder
- NameEEJAK HOLDINGS PRIVATE LIMITED
- Entity typeCompany
- DirectorsAshish Kushwaha, Padmaja Kushwaha, Devesh Kumar
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Feb 2020
- Promised completion30 Apr 2026
- Revised completionRevised to 30 Apr 2026 (originally 30 Oct 2024)
- Buildings4 building records
- Documents filed110 files
Current status
Figures as on 16 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING C | NA | 5 | 0 | 33 | 7 | 40 |
| BUILDING NO F | NA | 4 | 0 | 44 | 0 | 44 |
| BUILDING NO I | NA | 4 | 0 | 44 | 0 | 44 |
| BUILDING NO J | NA | 4 | 0 | 44 | 0 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.
BUILDING C63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
BUILDING NO F54%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
BUILDING NO I51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45% |
| Sanitary Fittings within the flats / premises | 32% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
BUILDING NO J40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed13
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO F | NA | Rs 6.49 cr | Rs 5.36 cr |
| BUILDING NO I | NA | Rs 6.49 cr | Rs 5.36 cr |
| BUILDING C | NA | Rs 6.49 cr | Rs 5.36 cr |
| BUILDING NO J | NA | Rs 6.49 cr | Rs 5.36 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SPACE DESIGN GROUP PROPRIETOR CHANDER MOHAN |
| Engineer | SPACE DESIGN GROUP |
| Engineer | SACHIN BALAKRISHNA TENDULKAR |
| Chartered Accountant | SATYA PRAKASH KUSHWAHA |
| Partner | Role in project |
|---|---|
| EEJAK HOLDINGS PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCOVID started immediately after our project launched and Heavy rain fall in the region hence require an extension u/s 6
Reason as filed by the promoterThe delay in the project is primarily due to the COVID-I9 pandemic, which affected development activities for two continuous years after its commencement in 2019. Additionally, the rising prices of steel and overall costs further impacted progress. Since Sindhudurg is a coastal region, it experiences continuous rainfall for nearly six months each year, further slowing down construction activities. These factors collectively contributed to the project's prolonged timeline, making it challenging to maintain the expected pace. Despite these setbacks, efforts are being made to overcome these obsta
Complaints filed with MahaRERA36
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000397489 | Abdul Kadher Musalr Yoosaf Kochuvaliaveetil | Axis E Corp | 14/09/2023 |
| CC12504038 | Anil Singh | EEJAK HOLDINGS PRIVATE LIMITED | 16/11/2025 |
| CC12502477 | SANJEEV KUMAR SINGH DIXIT | EEJAK HOLDINGS PRIVATE LIMITED | 19/07/2025 |
| CC12502820 | DIWAKER SADASHIV SONAR | EEJAK HOLDINGS PRIVATE LIMITED | 12/08/2025 |
| CC12503008 | Sunil Cerejo | EEJAK HOLDINGS PRIVATE LIMITED | 26/08/2025 |
| CC12503446 | Pankaj Deepchand | EEJAK HOLDINGS PRIVATE LIMITED | 26/09/2025 |
| CC12602655 | Linga Reddy Tokala | EEJAK HOLDINGS PRIVATE LIMITED | 07/05/2026 |
| CC12602743 | Baskaran Durai | EEJAK HOLDINGS PRIVATE LIMITED | 11/05/2026 |
| CC12602672 | Sarvottam Martoba Manerker | EEJAK HOLDINGS PRIVATE LIMITED | 08/05/2026 |
| CC12602688 | Kinjal Kunal Zinzuvadiya | EEJAK HOLDINGS PRIVATE LIMITED | 08/05/2026 |
| CC12602684 | Mayur Dayalji Dhanak | EEJAK HOLDINGS PRIVATE LIMITED | 08/05/2026 |
| CC12602685 | Sumit Kapur | EEJAK HOLDINGS PRIVATE LIMITED | 08/05/2026 |
| CC12602692 | Padmalochana Maddela | EEJAK HOLDINGS PRIVATE LIMITED | 09/05/2026 |
| CC12602693 | Padmalochana Maddela | EEJAK HOLDINGS PRIVATE LIMITED | 09/05/2026 |
| CC12602755 | Deepa Parcha | EEJAK HOLDINGS PRIVATE LIMITED | 11/05/2026 |
| CC12602798 | Shilpa Bhargavi Venugopal | EEJAK HOLDINGS PRIVATE LIMITED | 13/05/2026 |
| CC12602938 | Koteshwar Noorul Ameen | EEJAK HOLDINGS PRIVATE LIMITED | 19/05/2026 |
| CC12603233 | Dattatray Deokar | EEJAK HOLDINGS PRIVATE LIMITED | 29/05/2026 |
| CC12603116 | Wajid Ahmed Lukde | EEJAK HOLDINGS PRIVATE LIMITED | 25/05/2026 |
| CC12603048 | Natasha Ann Pereira | EEJAK HOLDINGS PRIVATE LIMITED | 23/05/2026 |
| CC12603110 | Khan Shahezad Jamal | EEJAK HOLDINGS PRIVATE LIMITED | 25/05/2026 |
| CC12603146 | Distrin Sebastian | EEJAK HOLDINGS PRIVATE LIMITED | 27/05/2026 |
| CC12603212 | Donfred George Valladares | EEJAK HOLDINGS PRIVATE LIMITED | 28/05/2026 |
| CC12603232 | Salim Konnola | EEJAK HOLDINGS PRIVATE LIMITED | 29/05/2026 |
| CC12603250 | Ashish Kumar Sharma | EEJAK HOLDINGS PRIVATE LIMITED | 30/05/2026 |
| CC12603358 | Shubha Kora Suresh Babu | EEJAK HOLDINGS PRIVATE LIMITED | 01/06/2026 |
| CC12603357 | Sachin Dabhole | EEJAK HOLDINGS PRIVATE LIMITED | 01/06/2026 |
| CC12603477 | Gurupradeep Reddy Marthala | EEJAK HOLDINGS PRIVATE LIMITED | 05/06/2026 |
| CC12603496 | Pabitra Dey | EEJAK HOLDINGS PRIVATE LIMITED | 06/06/2026 |
| CC12603608 | Anil Singh | EEJAK HOLDINGS PRIVATE LIMITED | 11/06/2026 |
| CC12603693 | Nisheeth Srivastava | EEJAK HOLDINGS PRIVATE LIMITED | 15/06/2026 |
| CC12603703 | Mahesh Manikrao Kirdat | EEJAK HOLDINGS PRIVATE LIMITED | 15/06/2026 |
| CC12603744 | Firoz Kasim Badar | EEJAK HOLDINGS PRIVATE LIMITED | 17/06/2026 |
| CC12603745 | Firoz Kasim Badar | EEJAK HOLDINGS PRIVATE LIMITED | 17/06/2026 |
| CC12603920 | Sreedhar Sreecharan Palukuru | EEJAK HOLDINGS PRIVATE LIMITED | 24/06/2026 |
| CC12603919 | Suchitra Challa | EEJAK HOLDINGS PRIVATE LIMITED | 24/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jan 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jan 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed110
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 CFIJ 24380 Q4 FY 25-26.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: Form 2 CFIJ 24380 Q4 FY 25-26.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: Form 3 FY 25-26 Q2 24380.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: From 1 CFIJ 24380 FY 25-26 Q3.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: From 2 CFIJ 24380 FY 25-26 Q3.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 FY 25-26 Q2 24380.pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 CFIJ Q2 FY 25-26.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: FY 25-26 Q2 FORM 2 CFIJ.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 FY 25-26 Q2 24380.pdf | 25 Feb 2026 |
| Form 1File: Form 1 CFIJ FY 24-25 Q1.pdf | 24 Feb 2026 |
| Form 2File: Form-2 P52900024380 FY 24-25 Q1.pdf | 24 Feb 2026 |
| Form 3File: Form 3 Eejak FY 24-25 CFIJ Q1.pdf | 24 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: CFIJ Disclosure of Sold or booked inventory-Axis Blues All Towers Q1 FY 24-25.pdf | 24 Feb 2026 |
| Form 1File: Form 1 CFIJ FY 24-25 Q2.pdf | 24 Feb 2026 |
| Form 2File: Form-2 P52900024380 FY 24-25 Q2.pdf | 24 Feb 2026 |
| Form 3File: Form 3 Eejak FY 24-25 CFIJ Q2.pdf | 24 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: CFIJ Disclosure of Sold or booked inventory-Axis Blues All Towers Q2 FY 24-25.pdf | 24 Feb 2026 |
| Form 1File: Form 1 CFIJ FY 24-25 Q3.pdf | 24 Feb 2026 |
| Form 2File: Form-2 P52900024380 FY 24-25 Q3.pdf | 24 Feb 2026 |
| Form 3File: Form 3 Eejak FY 24-25 CFIJ Q3.pdf | 24 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: CFIJ Disclosure of Sold or booked inventory-Axis Blues All Towers Q3 FY 24-25.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 CFIJ Q4 FY 24-25.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 CFIJ Q4 FY 24-25.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 CFIJ Q4 FY 24-25.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 CFIJ Q1 FY 25-26.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: FY 24-25 Q4 FORM 2 CFIJ.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: FY 24-25 Q4 FORM 2 CFIJ.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: FY 24-25 Q4 FORM 2 CFIJ.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: FY 25-26 Q1 FORM 2 CFIJ.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Qtr 4 FY 24-25 24380 CFIJ.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Qtr 4 FY 24-25 24380 CFIJ.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Qtr 4 FY 24-25 24380 CFIJ.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 FY 25-26 Q1 24380.pdf | 24 Feb 2026 |
| Form 2File: From 2 FY 24-25 Q4 24380.pdf | 21 Feb 2026 |
| Form 1File: FORM 1 CFIJ Q4 FY 24-25.pdf | 21 Feb 2026 |
| Form 3File: Form 3 Qtr 4 FY 24-25 24380 CFIJ.pdf | 21 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: CFIJ Disclosure of Sold or booked inventory-Axis Blues All Towers Q4 FY 24-25.pdf | 21 Feb 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 CFIJ FY 24-25 Q1.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 CFIJ FY 24-25 Q2.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 CFIJ FY 24-25 Q3.pdf | 4 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 P52900024380 FY 24-25 Q3.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 P52900024380 FY 24-25 Q1.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 P52900024380 FY 24-25 Q2.pdf | 31 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 P52900024380 FY 24-25 Q3.pdf | 31 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold or booked inventory CFIJ up to.pdf | 31 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Eejak FY 24-25 CFIJ Q1.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Eejak FY 24-25 CFIJ Q2.pdf | 13 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 24380.pdf | 20 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: CFIJ Sold Unsold Inventory.pdf | 19 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Tower CFIJ Discloser of Sold unsold inventory.pdf | 19 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24380.pdf | 12 Jun 2024 |
| Declaration in FORM BFile: Affidavit P52900024380.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 24380 1st qtr.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 24380 2nd qtr.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 24380 3rd qtr.pdf | 7 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 24380 4th qtr.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 24380 q1.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 24380 q2.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 24380 q3.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 24380 q4.pdf | 7 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 24380.pdf | 7 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CFIJ.pdf | 23 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC CFIJ 1.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P52900024380 1 QTR.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P52900024380 2ND QTR.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P52900024380 4 QTR.pdf | 14 May 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance related to Legal - CFIJ.pdf | 7 May 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance related to Legal - CFIJ.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: C,I,F,J -QTR-1.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Qtr 2.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Qtr 3.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Qtr 4-min.pdf | 7 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory -min.pdf | 7 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure of interest in other real estate organizations.pdf | 7 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Separate Bank Account Declaration CFIJ.pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 2023 CFIJ.pdf | 19 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: EC 2022 CFIJ.pdf | 19 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate-CFIJ.pdf | 19 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Eejak Form 3 cfij-min.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Eejak From5 CFIJ.pdf | 18 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 110 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AXIS BLUES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near YOG CITY530+ in Sindhudurg
AXIS BLUES
EEJAK HOLDINGS PRIVATE LIMITED
AXIS BLUES
EEJAK HOLDINGS PRIVATE LIMITED
AXIS LAKE CITY
GIRIRAJJI INFRASTRUCTURE PRIVATE LIMITED
YOG ANAND
Abome Real Estate Private Limited
YOG CITY PH 1
Jayprakash Ramawadh Maurya
SATERI TOWERS
PRASAD RAGHUNATH PANGAM
See every Sindhudurg project, with the district possession charts
Builder: EEJAK HOLDINGS PRIVATE LIMITED
EEJAK HOLDINGS PRIVATE LIMITED has 3 registrations on MahaRERA, including AXIS BLUES and AXIS BLUES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What does it mean that AXIS BLUES shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AXIS BLUES is delayed beyond 30 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AXIS BLUES?
The registered promoter entity is EEJAK HOLDINGS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AXIS BLUES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AXIS BLUES?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AXIS BLUES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AXIS BLUES?
The professionals named in the filing: Architect: SPACE DESIGN GROUP PROPRIETOR CHANDER MOHAN; Engineer: SPACE DESIGN GROUP; Engineer: SACHIN BALAKRISHNA TENDULKAR; Chartered Accountant: SATYA PRAKASH KUSHWAHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AXIS BLUES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback