Registered No litigation declared Residential / Group Housing project

YASHODAMAI

By KRISHNA GAJANAN KESARKAR

RG-MH-19150 · RERA P52900078201 · Last updated on MahaRERA portal: 7 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
7 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 85%
67 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

YASHODAMAI is a Residential / Group Housing project by KRISHNA GAJANAN KESARKAR in Sindhudurg, Maharashtra, registered with MahaRERA as P52900078201 on 29 Nov 2024. Possession is promised by 31 Mar 2027. 5 of the 72 units on this registration are recorded sold or booked, and 7 of 33 construction stages are filed complete.

At a glance

Project

  • NameYASHODAMAI
  • TypeResidential / Group Housing
  • Location
    • KUNKESHWAR MITHBAO ROAD
    • MITHBAO
    • Mithbaon
    • Devgad
    • Sindhudurg
    • 416615
  • Pincode416615
  • RERA no.P52900078201
  • ReraGenie IDRG-MH-19150

Builder

  • NameKRISHNA GAJANAN KESARKAR
  • Entity typeIndividual
  • GSTIN27ABTPK5317L1Z3
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredNov 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed48 files

Current status

7%5 of 72 units booked
29.2%Work done, per cost certificate

Figures as on 7 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING-CNA4418624
BUILDING-BNA4418624
BUILDING-ANA4418624

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 7 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 85%.

BUILDING-C71%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
BUILDING-B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING-A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed57

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots57
Open Space57
BuildingOpen SpaceTotal
BUILDING-C1919
BUILDING-B1919
BUILDING-A1919

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,906 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Aug 2025

Approvals and building plan

Sanctioning authorityGrampanchayat Mithbav
Permissible FSI2872.87
Proposed, not sanctioned2,873 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSachindanand Niwas ,Nr S M HIGH SCHOOL,KANKAVALI, SINDHUDURG, MAHARASHTRA 416602
Estimated costRs 4.29 cr
Cost incurredRs 1.25 cr
Work done29.24%
BuildingWingEstimatedIncurred
BUILDING-ANARs 1.55 cr-
BUILDING-BNARs 1.48 cr-
BUILDING-CNARs 1.25 crRs 1.25 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVINAYAK DHURI DHURI
EngineerMR PRANAY KELUSKAR
Chartered AccountantSAMEER KULKARNI
PartnerRole in project
KRISHNA GAJANAN KESARKAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Yashodamai Architect Certificate April-June25 (1).pdf7 Apr 2026
Withdrawal Update Form 1File: Yashodamai Architect certificate July-Sep25 (1).pdf7 Apr 2026
Withdrawal Update Form 1File: Yashodamai Architect Oct-Dec25 (1).pdf7 Apr 2026
Withdrawal Update Form 2File: Yashodamai Engineer certificate April-June25 (1).pdf7 Apr 2026
Withdrawal Update Form 2File: Yashodamai Engineer certificate July-Sep25 (1).pdf7 Apr 2026
Withdrawal Update Form 2File: Yashodamai Engineer certificate Oct-Dec25 (1).pdf7 Apr 2026
Withdrawal Update Form 3File: Yashodamai CA Certificate April-June25.pdf7 Apr 2026
Withdrawal Update Form 3File: Yashodamai CA Certificate July-Sep25.pdf7 Apr 2026
Withdrawal Update Form 3File: Yashodamai CA Certificate Oct-Dec25.pdf7 Apr 2026
Form 1File: YDM Rera Architect Certificate Q3 DEC2024.pdf5 Aug 2025
Form 2File: Enginner certificate ydm Q3 PDF (1).pdf5 Aug 2025
Form 3File: YDM Rera CA Certificate Q3 Dec 24.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: YDM Sold and Booked Inventory Q3.pdf5 Aug 2025
Form 1File: YDM Rera Architect Certificate Q4 Jan to Mar 2025.pdf5 Aug 2025
Form 2File: Engineer certificate of ydm Q4 (1).pdf5 Aug 2025
Form 3File: YDM Rera CA Certificate Q4 Jan 25 To Mar 25.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: YDM Sold and Booked Inventory Q4.pdf5 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM-3.pdf15 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CERTIFICATE.pdf28 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Town Planner Letter Yashodamai.pdf28 Oct 2024
Other - FinanceFile: Allotment Letter.pdf28 Oct 2024
PAN CardFile: PAN CARD KESERKAR.pdf15 Oct 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE (1).pdf11 Oct 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL.pdf11 Oct 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE (1).pdf11 Oct 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT'S CERTIFICATE.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineer Certificate - DONE.pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: mail.pdf7 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format-B Opening of RERA Designated Bank Account.pdf7 Oct 2024
Other - TechnicalFile: ANNEXURE-A ORDER 50.pdf5 Aug 2024
Layout approvalFile: 02.pdf10 Apr 2024
Copy of the legal title reportFile: legal title report.pdf10 Apr 2024
Copy of Layout Approval (in case of layout)File: 02.pdf10 Apr 2024
Proforma of Allotment letterFile: Allotment Letter (1) (1).pdf10 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 2 Commencement Certificates _ NA Order for plotted development (1).pdf10 Apr 2024
Other - LegalFile: OWNERSHIP DOCUMENT.pdf10 Apr 2024
Deviation Report with respect to Allotment letterFile: Deviation Report With Respect to the Allotment Letter.pdf18 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF MODEL COPY OF AGREEMENT.pdf18 Mar 2024
Proforma of Agreement for saleFile: NEW AGREEMENT TO SELL RERA_FORMAT.pdf18 Mar 2024
Building plan approvalFile: FINAL PLAN.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: FINAL PLAN.pdf23 Feb 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf23 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf22 Feb 2024
Declaration in FORM BFile: FORM-B.pdf23 Jan 2024
CERSAI detailsFile: CERSAI UNDERTAKING.pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf21 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
krishna nagriJANAVALI KANKAVALICompletedJan 2011Jan 2011

How this compares with Sindhudurg

7%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is on the register

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep YASHODAMAI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MITHBAO530+ in Sindhudurg

Builder: KRISHNA GAJANAN KESARKAR

KRISHNA GAJANAN KESARKAR has 3 registrations on MahaRERA, including NAND NAGRI and Dwarkanagri phase -1. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if YASHODAMAI is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHODAMAI?

The registered promoter entity is KRISHNA GAJANAN KESARKAR, an individual as per the filing. Its GSTIN 27ABTPK5317L1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHODAMAI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YASHODAMAI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YASHODAMAI?

The professionals named in the filing: Architect: VINAYAK DHURI DHURI; Engineer: MR PRANAY KELUSKAR; Chartered Accountant: SAMEER KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YASHODAMAI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHODAMAI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHODAMAI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.