New projects and RERA data in Satara district, Maharashtra

1192 projects are registered in Satara district: 26,089 units across them, 67 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

1192Projects covered
67Registered, last 12 months
26,089Units declared
19,555Units not yet booked
194Completion dates revised
4With declared litigation

Of the 1192 covered registrations, 194 have revised their promised completion date and 4 declare litigation. The median project here is 15% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Satara projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 1,192 projects with a promised date, 385 are recorded delivered, 388 are still on the register and 419 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

050100150200today2017: 3 projects, delivered2017: 1 projects, registration lapsed or cancelled’172018: 53 projects, delivered2018: 6 projects, registration lapsed or cancelled’182019: 43 projects, delivered2019: 28 projects, registration lapsed or cancelled’192020: 17 projects, delivered2020: 9 projects, registration lapsed or cancelled’202021: 28 projects, delivered2021: 43 projects, registration lapsed or cancelled’212022: 59 projects, delivered2022: 53 projects, registration lapsed or cancelled’222023: 59 projects, delivered2023: 90 projects, registration lapsed or cancelled’232024: 38 projects, delivered2024: 82 projects, registration lapsed or cancelled’242025: 47 projects, delivered2025: 70 projects, registration lapsed or cancelled’252026: 21 projects, delivered2026: 66 projects, on the register2026: 34 projects, registration lapsed or cancelled’262027: 12 projects, delivered2027: 104 projects, on the register2027: 1 projects, registration lapsed or cancelled’272028: 2 projects, delivered2028: 81 projects, on the register2028: 1 projects, registration lapsed or cancelled’282029: 3 projects, delivered2029: 54 projects, on the register2029: 1 projects, registration lapsed or cancelled’292030: 54 projects, on the register’302031: 17 projects, on the register’312032: 9 projects, on the register’322033: 1 projects, on the register’332034: 2 projects, on the register’34

463 projects promise possession in 2026 or later. Facts as per filings on RERA website.

02,5005,0007,50010ktoday’172018: 784 flats, delivered (only 10 of 59 projects filed a flat count)2018: 78 flats, registration lapsed or cancelled (only 10 of 59 projects filed a flat count)’182019: 536 flats, delivered (only 11 of 71 projects filed a flat count)2019: 401 flats, registration lapsed or cancelled (only 11 of 71 projects filed a flat count)’192020: 42 flats, delivered (only 2 of 26 projects filed a flat count)’202021: 318 flats, delivered (only 9 of 71 projects filed a flat count)2021: 240 flats, registration lapsed or cancelled (only 9 of 71 projects filed a flat count)’212022: 249 flats, delivered (only 8 of 112 projects filed a flat count)2022: 257 flats, registration lapsed or cancelled (only 8 of 112 projects filed a flat count)’222023: 184 flats, delivered (only 17 of 149 projects filed a flat count)2023: 1,266 flats, registration lapsed or cancelled (only 17 of 149 projects filed a flat count)’232024: 388 flats, delivered (only 20 of 120 projects filed a flat count)2024: 905 flats, registration lapsed or cancelled (only 20 of 120 projects filed a flat count)’242025: 483 flats, delivered (only 27 of 117 projects filed a flat count)2025: 635 flats, registration lapsed or cancelled (only 27 of 117 projects filed a flat count)’252026: 139 flats, delivered (only 54 of 121 projects filed a flat count)2026: 1,556 flats, on the register (only 54 of 121 projects filed a flat count)2026: 595 flats, registration lapsed or cancelled (only 54 of 121 projects filed a flat count)’262027: 110 flats, delivered2027: 5,436 flats, on the register2027: 2 flats, registration lapsed or cancelled’272028: 29 flats, delivered2028: 4,353 flats, on the register’282029: 109 flats, delivered2029: 2,852 flats, on the register’292030: 2,494 flats, on the register’302031: 1,062 flats, on the register’312032: 377 flats, on the register’322033: 119 flats, on the register’332034: 90 flats, on the register’34

19,323 flats are promised in 2026 or later, across the 66% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Satara possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 193 of 1,192 projects (16%) have moved at least once; the median move is 24 months and the longest is 112 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

050100150200Originally due 2017: 4 projects kept the original date, 67% of the yearOriginally due 2017: 2 projects moved by under 2 years, 33% of the year’17Originally due 2018: 57 projects kept the original date, 75% of the yearOriginally due 2018: 5 projects moved by under 2 years, 7% of the yearOriginally due 2018: 14 projects moved by 2 years or more, 18% of the year’18Originally due 2019: 66 projects kept the original date, 70% of the yearOriginally due 2019: 8 projects moved by under 2 years, 9% of the yearOriginally due 2019: 20 projects moved by 2 years or more, 21% of the year’19Originally due 2020: 19 projects kept the original date, 66% of the yearOriginally due 2020: 4 projects moved by under 2 years, 14% of the yearOriginally due 2020: 6 projects moved by 2 years or more, 21% of the year’20Originally due 2021: 62 projects kept the original date, 70% of the yearOriginally due 2021: 10 projects moved by under 2 years, 11% of the yearOriginally due 2021: 17 projects moved by 2 years or more, 19% of the year’21Originally due 2022: 93 projects kept the original date, 74% of the yearOriginally due 2022: 14 projects moved by under 2 years, 11% of the yearOriginally due 2022: 19 projects moved by 2 years or more, 15% of the year’22Originally due 2023: 124 projects kept the original date, 86% of the yearOriginally due 2023: 13 projects moved by under 2 years, 9% of the yearOriginally due 2023: 8 projects moved by 2 years or more, 6% of the year’23Originally due 2024: 96 projects kept the original date, 83% of the yearOriginally due 2024: 10 projects moved by under 2 years, 9% of the yearOriginally due 2024: 9 projects moved by 2 years or more, 8% of the year’24Originally due 2025: 90 projects kept the original date, 77% of the yearOriginally due 2025: 16 projects moved by under 2 years, 14% of the yearOriginally due 2025: 11 projects moved by 2 years or more, 9% of the year’25Originally due 2026: 92 projects kept the original date, 96% of the yearOriginally due 2026: 1 projects moved by under 2 years, 1% of the yearOriginally due 2026: 3 projects moved by 2 years or more, 3% of the year’26Originally due 2027: 99 projects kept the original date, 99% of the yearOriginally due 2027: 1 projects moved by 2 years or more, 1% of the year’27Originally due 2028: 67 projects kept the original date, 100% of the year’28Originally due 2029: 52 projects kept the original date, 98% of the yearOriginally due 2029: 1 projects moved by under 2 years, 2% of the year’29Originally due 2030: 49 projects kept the original date, 98% of the yearOriginally due 2030: 1 projects moved by under 2 years, 2% of the year’30Originally due 2031: 17 projects kept the original date, 100% of the year’31Originally due 2032: 9 projects kept the original date, 100% of the year’32Originally due 2033: 1 projects kept the original date, 100% of the year’33Originally due 2034: 2 projects kept the original date, 100% of the year’34

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

01,2502,5003,7505,000’17Originally due 2018: 862 flats kept the original date, 75% of the year (only 11 of 76 projects filed a flat count)Originally due 2018: 50 flats moved by 2 years or more, 18% of the year (only 11 of 76 projects filed a flat count)’18Originally due 2019: 937 flats kept the original date, 70% of the year (only 19 of 94 projects filed a flat count)Originally due 2019: 42 flats moved by under 2 years, 9% of the year (only 19 of 94 projects filed a flat count)Originally due 2019: 546 flats moved by 2 years or more, 21% of the year (only 19 of 94 projects filed a flat count)’19Originally due 2020: 205 flats moved by under 2 years, 14% of the year (only 4 of 29 projects filed a flat count)Originally due 2020: 105 flats moved by 2 years or more, 21% of the year (only 4 of 29 projects filed a flat count)’20Originally due 2021: 353 flats kept the original date, 70% of the year (only 16 of 89 projects filed a flat count)Originally due 2021: 104 flats moved by under 2 years, 11% of the year (only 16 of 89 projects filed a flat count)Originally due 2021: 739 flats moved by 2 years or more, 19% of the year (only 16 of 89 projects filed a flat count)’21Originally due 2022: 402 flats kept the original date, 74% of the year (only 19 of 126 projects filed a flat count)Originally due 2022: 164 flats moved by under 2 years, 11% of the year (only 19 of 126 projects filed a flat count)Originally due 2022: 336 flats moved by 2 years or more, 15% of the year (only 19 of 126 projects filed a flat count)’22Originally due 2023: 1,086 flats kept the original date, 86% of the year (only 20 of 145 projects filed a flat count)Originally due 2023: 38 flats moved by under 2 years, 9% of the year (only 20 of 145 projects filed a flat count)Originally due 2023: 310 flats moved by 2 years or more, 6% of the year (only 20 of 145 projects filed a flat count)’23Originally due 2024: 980 flats kept the original date, 83% of the year (only 25 of 115 projects filed a flat count)Originally due 2024: 125 flats moved by under 2 years, 9% of the year (only 25 of 115 projects filed a flat count)Originally due 2024: 265 flats moved by 2 years or more, 8% of the year (only 25 of 115 projects filed a flat count)’24Originally due 2025: 840 flats kept the original date, 77% of the year (only 41 of 117 projects filed a flat count)Originally due 2025: 644 flats moved by under 2 years, 14% of the year (only 41 of 117 projects filed a flat count)Originally due 2025: 1,517 flats moved by 2 years or more, 9% of the year (only 41 of 117 projects filed a flat count)’25Originally due 2026: 1,442 flats kept the original date, 96% of the year (only 41 of 96 projects filed a flat count)Originally due 2026: 37 flats moved by under 2 years, 1% of the year (only 41 of 96 projects filed a flat count)Originally due 2026: 112 flats moved by 2 years or more, 3% of the year (only 41 of 96 projects filed a flat count)’26Originally due 2027: 4,555 flats kept the original date, 99% of the yearOriginally due 2027: 23 flats moved by 2 years or more, 1% of the year’27Originally due 2028: 3,455 flats kept the original date, 100% of the year’28Originally due 2029: 1,730 flats kept the original date, 98% of the yearOriginally due 2029: 70 flats moved by under 2 years, 2% of the year’29Originally due 2030: 2,341 flats kept the original date, 98% of the yearOriginally due 2030: 26 flats moved by under 2 years, 2% of the year’30Originally due 2031: 1,062 flats kept the original date, 100% of the year’31Originally due 2032: 377 flats kept the original date, 100% of the year’32Originally due 2033: 119 flats kept the original date, 100% of the year’33Originally due 2034: 90 flats kept the original date, 100% of the year’34

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Satara

Who sanctions building in Satara

341 of the 1,192 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
SATARA MUNICIPAL COUNCIL70
COLLECTOR OFFICE SATARA22
Malkapur Muncipal Council19
Town Planning Satara18
127 other bodies212

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 1,192 registrations on this page answers this: on 574 the promoter is the only owner named; on 561 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 57 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Satara: projects by taluka

1,192 of the 1,192 registrations on this page name their taluka.

TalukaProjectsShare
Satara53945%
Karad20517%
Phaltan14812%
Khandala12410%
Wai1039%
6 other talukas736%

Projects in Satara

Showing 1 to 60 of 1,192 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
PRADHAN MANTRI AWAS YOJANA SATARA PHASE IKARANJE TARF SATARA, 415001SATARA MUNICIPAL COUNCIL SATARA10927%29 Sep 2021Registered
LANDMARK TOWERSNEAR HUTATMA SMARAK, 415001KANGRALKAR INFRASTRUCTURE5432%12 Sep 2023Registered
Dois HillBhade, 415526Vinay Ashok Chugera4860%25 Jan 2024Registered
SEVEN HILLSDhavadi, 412803VENKATESWARAA DEVELOPERS PVT LTD48611%31 Aug 2017Registered
64 AVENUENEW VIKASNAGAR, 415003VISAVA BUILDCON LLP33662%26 May 2022Registered
silver valleyVidyanagar, 415124Devashree Garden LLP3080%1 Oct 2026Registered
Plotted development scheme at S.No.129.Wathar Nimbalkar,Tal Phlatan Dist Satara415523Pune Housing & Area Development Board297100%22 Aug 2017Completed
BHADRESHWAR CITYWai (Rural), 412803JYOTI CONSTRUCTIONS27748%22 Aug 2017Registration lapsed
NATURES ESTATENear Veer Dam Main Gate, 415526SOHAM SKYSCRAPERS LLP27110%9 Oct 2019Registration lapsed
ALPHA WORLDPHALTAN, 415523PARAG PRAMOD DHADIWAL24826%6 Oct 2023Registered
Bhuvi CommerciaSADARBAZAR, 415001LAXMI NARAYAN INDUSTRIES24569%15 Oct 2022Registered
SAKSHI VISHWA PHASE IIKHANAPUR, 412803M/S SAKSHI NINE BLOSSOM DEVELOPERS24127%20 Aug 2020Registered
Fortune valleyPargaon, 415512Limra constructions24010%14 Sep 2017Registered
TAJCITRUS PARKShirwal, 412809FILTRUM INFRASTRUCTURE PRIVATE LIMITED2390%1 Oct 2026Registered
SAKSHI NISARGMAUJE SONGIRWADI, 412803SAKSHI CONSTRUCTION ANIL LAXMAN SAWANT23819%28 Nov 2022Registered
ESCAPADE SPORT CITYAtit, 415519ESCAPADE PROPERTIES LLP22513%31 Aug 2017Registered
GOLDFIELDSAsawali, 412802UNIVERSAL DEVELOPERS20561%17 Aug 2017Completed
ADITYA TRUPTI RESIDENCYNEAR WATER TANK, 415509ARVIND BAPU PISE19728%23 Oct 2023Registered
GRAND AVENUEOpp HDFC BANK, 412801ALANKAR REALITIES1940%10 Nov 2023Registered
SnehbhoomiKhandala, 412802Pushkar Realty19163%9 Aug 2017Completed
HILL CREST PARKAjnuj, 412802LIMRA DEVELOPERS16735%4 Aug 2017Registered
NAIK PLAZASANGAM NAGAR, 415003CLASSIC CONSTRUCTIONS16430%15 Feb 2023Registered
KST CENTRAL PARKMALKAPUR, 415539KST CONSTRUCTIONS1629%19 May 2025Registered
Smaark oneMalkapur, 415539Devashree Garden LLP16033%12 Mar 2025Registered
JAGANNATH PATIL TOWERSHANIWAR PETH, 415110SAIDATTA DEVELOPERS AND INFRA PRIVATE LIMITED15718%1 Jun 2023Registered
SwarnabhoomiVele, 415517Kachhi Properties Pvt.Ltd1512%1 Sep 2017Completed
Clover Windermere Phase -IKavathe, 412801Amalfi Enterprise14535%23 Jul 2017Completed
INDUS LANDMARKNEAR ANANT MANGAL KARALAY, 415523INDUS PROMOTERS14484%22 Nov 2021Registered
Terra NovaAjnuj, 412802BHIMASHANKAR DEVELOPERS14279%17 Aug 2017Registration lapsed
Woodwinds Phase I-, 412802Alliance Vanashree Ventures14224%9 Aug 2017Registration lapsed
MENLO FRONTYARDDhangarwadi, 415521BLUE LADDER ESTATES PRIVATE LIMITED1390%7 Jul 2026Registered
PETALSSHIRVAL, 412801DINESH VASUDEV BHARGUDE13913%15 Dec 2025Registered
Soil VillaDhavadi, 412803Soil Properties & Infra India Ltd.1370%7 Sep 2017Registration lapsed
SAKSHISHILP-, 412803SAKSHI SAMUH DEVELOPERS13667%4 Aug 2017Registration lapsed
Nivaan RivieraGat No 1353 1354 1366, 412801Riverfront Developers1350%9 May 2023Completed
AMBIKA VIHARShirwal, 412801MALEKAR TAMBE ASSOCIATES LLP13448%10 May 2024Registered
SWARA CITYFarandwadi, 415523JAGDISH RAMVILAS KARVA12994%22 Aug 2017Completed
Vaarsahighland1Amberwadi, 412802BHIMASHANKAR DEVELOPERS12882%9 Aug 2017Completed
SHIVSAMRUDDHI TOWERSMALKAPUR, 415539SHIVSRUSHTI BUILDCON12446%17 Jan 2023Registered
Sukhodayam VillasSatara, 415002M/s Ultra Urban Greene Realty LLP12216%10 Mar 2026Registered
YASHWANT ELITE-, 415002RAHULDEV PROMOTERS SATARA12030%6 Feb 2024Registered
SAMARVEER SKYLINEIN FRONT OF GODOLI LACK, 415001SHRI MANGALMURTI BUILDERS1190%17 Aug 2026Registered
MathuraKaranje Naka, 415001Balkrishna Pandurang Jadhav1170%19 Mar 2019Registration lapsed
MAITRI TOWERSahyadrinagar, 412803Maitri Constructions1140%17 Feb 2025Registered
VRUNDAVAN CITY PHASE 5Near Akshata Mangal Karyalay, 415539KALYANI INFRA1140%11 Aug 2026Registered
Woodwinds Phase IIDhawadwadi, 412802Alliance Vanashree Ventures1149%11 Aug 2017Registration lapsed
DIGVIJAY ANANDRAO GAIKWADSidhanathwadi (Rural), 412803DIGVIJAY ANANDRAO GAIKWAD1130%15 Sep 2026Registered
WODDLAND ENCLAVESHIRAL, 415206PRAGATI DEVELOPERS1130%24 Nov 2020Registered
Quadra TownShindewadi, 412801Bhujbal Brothers Properties11212%26 Sep 2020Registered
SHIVAM VRUNDAVANGAT NO 349/2/1, 412801SHIVAM REALITIES11150%6 Mar 2023Registration lapsed
EMPIRE TOWERSNEAR NAMJOSHI PETROL PUMP, 415523RAM AND J K ASSOCIATES11030%8 Sep 2021Completed
NISARGSRISHTIJavale, 412801LANDSCAPES DEVELOPERS11049%14 Aug 2017Completed
KIRTI BACKWATERMirje, 412801KIRTI DEVELOPERS10453%6 Aug 2017Completed
NivaantShendurjane, 412803Sugee Realtors One LLP10328%27 Jul 2017Completed
The Explorers Club and Country HouseKenjal, 415536INTERNATIONAL WELLNESS RESIDENCES PRIVATE LIMITED1030%9 Oct 2025Registered
TRIANGLE HEIGHTSPHALTAN, 415523MIG CONSTRUCTION LLP1015%15 Jan 2024Registered
99 AVENUEVikas Nagar, 415003RELIABLE VENTURE1000%5 Mar 2026Registered
KEDARESHWAR NANDANVANPALASHI ROAD, 412801MALEKAR KABULE ASSOCIATES LLP10037%25 Jan 2024Registered
Lake Front - Phase VDhawadwadi, 412802Galaxy Realty1003%16 Aug 2017Registration lapsed
GOLDMINE IISHENDURJANE, 412803Venus Properties990%2 May 2018Completed
Planning a launch in Satara? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Satara

Rajan Namdeo Pore (6), VENKATESH PROMOTERS AND BUILDERS (6), VARAD BUILDERS AND PROMOTERS (5), Aditya Developers through Proprietor Kumar Balasaheb Chavan (5), ASHWINI BUILDER'S & DEVELOPERS Pvt. Ltd. (5), Adarsh Vastu Nirmiti Pvt. Ltd. (5). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Satara projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 15% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Satara project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Satara district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Satara registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Satara project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.