Home / Browse projects / Satara, Maharashtra / YASHWANT ELITE

Registered No litigation declared Residential / Group Housing project

YASHWANT ELITE

By RAHULDEV PROMOTERS SATARA

RG-MH-61333 · RERA P52700054689 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
84 of 120Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

YASHWANT ELITE is a Residential / Group Housing project by RAHULDEV PROMOTERS SATARA in Satara, Maharashtra, registered with MahaRERA as P52700054689 on 6 Feb 2024. Possession is promised by 31 Dec 2028. 36 of the 120 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameYASHWANT ELITE
  • TypeResidential / Group Housing
  • Location
    • -
    • Karanje Tarf Satara (CT)
    • Satara
    • 415002
  • Pincode415002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700054689
  • ReraGenie IDRG-MH-61333

Builder

  • NameRAHULDEV PROMOTERS SATARA
  • Entity typePartnership
  • GSTIN27AAZFR3745A1ZW
  • PartnersSHRIKANT BHAGAWAN MOHITE, PRATIK MADHUKAR MOHITE
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed103 files

Current status

30%36 of 120 units booked
78.4%Work done, per cost certificate

Figures as on 4 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
YASHWANT ELITE A WINGNA6636036
YASHWANT ELITE B WINGNA7742042
YASHWANT ELITE C WINGNA7742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

YASHWANT ELITE A WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
YASHWANT ELITE B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
YASHWANT ELITE C WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed205

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots205
Closed/Covered205
BuildingClosed/CoveredTotal
YASHWANT ELITE A WING5353
YASHWANT ELITE B WING7676
YASHWANT ELITE C WING7676

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,725 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 May 2026
LandownerVillageDistrict
MOTILAL JETHMAL JAINSataraSatara
HARISHKUMAR VILASKUMAR JAINSataraSatara
SANJAY RAMESH JAIN HUFSataraSatara
MUKESH RAMESH JAIN HUFSataraSatara
NARENDRAKUMAR LALCHANDJI GANDHISataraSatara
VIDYA NARENDRAKUMAR GANDHISataraSatara
HITESH NARENDRA GANDHISataraSatara
DIMPLE NARENDRA GANDHISataraSatara

Approvals and building plan

Sanctioning authoritySatara Municipal Council
Permissible FSI11957.29
Proposed, not sanctioned11,396 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch506 SADARBAZAR DESHMUKH COLONY SATARA
Estimated costRs 21.18 cr
Cost incurredRs 16.61 cr
Work done78.42%
BuildingWingEstimatedIncurred
YASHWANT ELITE A WINGNARs 7.06 crRs 5.54 cr
YASHWANT ELITE B WINGNARs 7.06 crRs 5.54 cr
YASHWANT ELITE C WINGNARs 7.06 crRs 5.54 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT BAGADE
EngineerJANARDAN KADAM
EngineerNikheel Shankar rao mali
Chartered AccountantGANESH KHATAVKAR ASSOCIATES
Chartered AccountantSachin K mishra & company
PartnerRole in project
RAHULDEV PROMOTERS SATARA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Mar 24.pdf4 Jun 2026
Form 2File: Form 2 mar 24.pdf4 Jun 2026
Form 3File: CA Certificate_Mar 24.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Mar 24.pdf4 Jun 2026
Form 1File: Form 1 Mar-25.pdf4 Jun 2026
Form 2File: Form 2 Mar 25.pdf4 Jun 2026
Form 3File: CA Certificate_Mar 25.pdf4 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Mar 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1 Jun 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1 Jun 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1 Jun 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Sep 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Sep 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Sep 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Sep 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Dec 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Dec 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Dec 25.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 June 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 June 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 June 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Sep 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Sep 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Sep 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Sep 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 3File: CA Certificate_Jun 25.pdf4 Jun 2026
Withdrawal Update Form 3File: CA Certificate_Jun 25.pdf4 Jun 2026
Withdrawal Update Form 3File: CA Certificate_Jun 25.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Sep 25.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Sep 25.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Sep 25.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Sep 25.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Dec 25.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Dec 25.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Dec 25.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf4 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DocScanner 31-Jan-2024 10-12 AM.pdf31 Jan 2024
Other - LegalFile: DocScanner 17-Jan-2024 07-50 PM_compressed.pdf17 Jan 2024
Declaration about Commencement CertificateFile: declaration cc.pdf27 Dec 2023
Layout approvalFile: PLAN 7.pdf26 Dec 2023
Layout approvalFile: PLAN 8.pdf26 Dec 2023
Building plan approvalFile: PLAN 1.pdf26 Dec 2023
Building plan approvalFile: PLAN 2.pdf26 Dec 2023
Building plan approvalFile: PLAN 3.pdf26 Dec 2023
Building plan approvalFile: PLAN 4.pdf26 Dec 2023
Building plan approvalFile: PLAN 5.pdf26 Dec 2023
Building plan approvalFile: PLAN 6.pdf26 Dec 2023
Building plan approvalFile: PLAN 7.pdf26 Dec 2023
Building plan approvalFile: PLAN 8.pdf26 Dec 2023
PAN CardFile: pan.pdf26 Dec 2023
Copy of the legal title reportFile: search report.pdf26 Dec 2023
Details of encumbrances concerned to FinanceFile: finance incumbrances.pdf26 Dec 2023
Details of encumbrances concerned to FinanceFile: legal incumbrances.pdf26 Dec 2023
Details of encumbrances concerned to LegalFile: finance incumbrances.pdf26 Dec 2023
Details of encumbrances concerned to LegalFile: legal incumbrances.pdf26 Dec 2023
Copy of Layout Approval (in case of layout)File: PLAN 7.pdf26 Dec 2023
Copy of Layout Approval (in case of layout)File: PLAN 8.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 3.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 4.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 5.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 6.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 7.pdf26 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 8.pdf26 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf26 Dec 2023

How this compares with Satara

30%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep YASHWANT ELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -1,100+ in Satara

2 kmYASHWANT ELITECompleted 24Lapsed / revoked 34Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: RAHULDEV PROMOTERS SATARA

RAHULDEV PROMOTERS SATARA has 3 registrations on MahaRERA, including SHREE GANESH PARK and YASHWANT SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if YASHWANT ELITE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHWANT ELITE?

The registered promoter entity is RAHULDEV PROMOTERS SATARA, a partnership as per the filing. Its GSTIN 27AAZFR3745A1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHWANT ELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YASHWANT ELITE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YASHWANT ELITE?

The professionals named in the filing: Architect: SUMIT BAGADE; Engineer: JANARDAN KADAM; Engineer: Nikheel Shankar rao mali; Chartered Accountant: GANESH KHATAVKAR ASSOCIATES; Chartered Accountant: Sachin K mishra & company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YASHWANT ELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHWANT ELITE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHWANT ELITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.