Registered No litigation declared Plotted project

SEVEN HILLS

By VENKATESWARAA DEVELOPERS PVT LTD

RG-MH-12065 · RERA P52700011037 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedno revision filed
433 of 486Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

SEVEN HILLS is a Plotted project by VENKATESWARAA DEVELOPERS PVT LTD in Satara, Maharashtra, registered with MahaRERA as P52700011037 on 31 Aug 2017. Possession is promised by 18 Oct 2028. 53 of the 486 units on this registration are recorded sold or booked. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSEVEN HILLS
  • TypePlotted
  • Location
    • 01
    • Dhavadi
    • Wai
    • Satara
    • 412803
  • Pincode412803
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700011037
  • ReraGenie IDRG-MH-12065

Builder

  • NameVENKATESWARAA DEVELOPERS PVT LTD
  • Entity typeCompany
  • Managing DirectorsDAULATRAO UMAJI MAHADIK, JALINDAR NARAYAN LOLE

Key dates

this monthRegisteredAug 2017PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion18 Oct 2028
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed42 files

Current status

11%53 of 486 units booked

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes15%
Water SupplyYes15%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes15%
Landscaping & Tree PlantingYes15%
Street LightingYes15%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes30%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area161,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTOWWER PLANNING

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANPATI ALI BRAHMINSHAHI WAI

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHARAT JINAGOUNDA PATIL
ArchitectSANKET CHAVAN
EngineerDAULATRAO MAHADIK
EngineerSHIRDHAR SHANKAR JAGTAP
Chartered AccountantSANDIP DESHMANE
Chartered Accountantsagar formfive wagh
Chartered AccountantSAGAR WAGH
Chartered AccountantSSKS & Associates Chartered Accountants
PartnerRole in project
VENKATESWARAA DEVELOPERS PVT LTD-

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC005000000011944DHANANJAY JAGDEVRAO PAWARVENKATESWARAA DEVELOPERS PVT LIMITED20/08/2018
CC005000000023312Madhav Dattatray PanchporVenkateswaraa Developers Pvt. Ltd.23/08/2019
CC005000000290097Rajesh Shrikant SahasrabudheMr Daulatrao Umaji Mahadik14/01/2024
CC005000000340783Rajesh Shrikant SahasrabudheYogesh Bhandare14/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 18 Oct 2028

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 Arch 11042026.pdf21 Apr 2026
Form 2File: Form 2 engineer certificate.pdf21 Apr 2026
Form 3File: CA FORM 3 March 2026 compressed.pdf21 Apr 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory 2026_compressed.pdf21 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A Engineer Certificate 2026.pdf21 Apr 2026
Form 1File: FORM 1 Arch 20012026.pdf21 Jan 2026
Form 2File: Engineer Form 2 Dec 2025.pdf21 Jan 2026
Form 3File: Form 3 CA DEC 2025_compressed (1).pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory dec 2025_compressed.pdf21 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf21 Jan 2026
Form 1File: Form 1 Arch Certificate Sep 2025.pdf20 Oct 2025
Form 2File: Form 2 Engineer Certificate Sep 2025.pdf20 Oct 2025
Form 3File: Form 3 CA sept quarter Qpr_compressed.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory sep 2025_compressed.pdf20 Oct 2025
Form 1File: Form 1 Arch Certificate.pdf19 Aug 2025
Form 2File: Form 2 Engineer certificate .pdf19 Aug 2025
Form 3File: Form 3 CA_11zon.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Vdpl sold unsold Inventory _11zon.pdf19 Aug 2025
Form 2A (FY 2024-2025)File: Form 2 A 2024.pdf19 Aug 2025
Form 2A (FY 2023-2024)File: Form 2 A 2023.pdf19 Aug 2025
Form 2A (FY 2022-2023)File: Form 2 A 2022.pdf19 Aug 2025
Form 5 (FY 2021-2022)File: FORM 5 2021-22.pdf13 Aug 2025
Form 5 (FY 2022-2023)File: FORM 5 2022-23.pdf13 Aug 2025
Form 5 (FY 2023-2024)File: FORM 5 2023-24.pdf13 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.pdf11 Apr 2018
Layout approvalFile: layout pdf.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: layout pdf.pdf31 Jul 2017
OtherFile: Extension letter.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: cert.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: ca cert.pdf30 Jul 2017
Declaration in FORM BFile: Affidavit.pdf29 Jul 2017
Proforma of Allotment letterFile: ags Declartion.pdf29 Jul 2017
OtherFile: Certificate of Incorporation-181012.pdf29 Jul 2017
Building plan approval or NA orderFile: NA ORDER.pdf28 Jul 2017
PAN CardFile: pan card.pdf28 Jul 2017
Copy of the legal title reportFile: resized.pdf28 Jul 2017
Details of encumbrancesFile: loan letter.pdf28 Jul 2017
Details of encumbrancesFile: Index 2.pdf28 Jul 2017
Building Plan Approval (IOD)File: NA ORDER.pdf28 Jul 2017
Proforma of Allotment letterFile: Agreement of SALE -Draft.pdf28 Jul 2017
Proforma of Allotment letterFile: Sale Deed Draft.pdf28 Jul 2017

How this compares with Satara

11%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep SEVEN HILLS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhavadi1,100+ in Satara

Builder: VENKATESWARAA DEVELOPERS PVT LTD

VENKATESWARAA DEVELOPERS PVT LTD has 1 registration on MahaRERA, including SEVEN HILLS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if SEVEN HILLS is delayed beyond 18 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SEVEN HILLS?

The registered promoter entity is VENKATESWARAA DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SEVEN HILLS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SEVEN HILLS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SEVEN HILLS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SEVEN HILLS?

The professionals named in the filing: Architect: BHARAT JINAGOUNDA PATIL; Architect: SANKET CHAVAN; Engineer: DAULATRAO MAHADIK; Engineer: SHIRDHAR SHANKAR JAGTAP; Chartered Accountant: SANDIP DESHMANE; Chartered Accountant: sagar formfive wagh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SEVEN HILLS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SEVEN HILLS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SEVEN HILLS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.