Home / Browse projects / Satara, Maharashtra / TRIANGLE HEIGHTS
TRIANGLE HEIGHTS
RG-MH-45611 · RERA P52700054350 · Last updated on MahaRERA portal: 3 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TRIANGLE HEIGHTS is a Others project by MIG CONSTRUCTION LLP in Satara, Maharashtra, registered with MahaRERA as P52700054350 on 15 Jan 2024. Possession is promised by 6 Dec 2028. 5 of the 101 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.
At a glance
Project
- NameTRIANGLE HEIGHTS
- TypeOthers
- Location
- DECCAN CHOWK
- PHALTAN
- Phaltan (M Cl)
- Satara
- 415523
- Pincode415523
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700054350
- ReraGenie IDRG-MH-45611
Builder
- NameMIG CONSTRUCTION LLP
- Entity typePartnership
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jan 2024
- Promised completion6 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed62 files
Current status
Figures as on 3 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TRIANGLE HEIGHTS | NA | 12 | 12 | 40 | 60 | 100 |
| TRIANGLE HEIGHTS HOSPITAL | NA | 5 | 5 | 0 | 1 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 3 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
TRIANGLE HEIGHTS0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TRIANGLE HEIGHTS HOSPITAL0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| AMBADAS SHANKARRAO GHADAGE | Phaltan (M Cl) | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUMIT BAGADE |
| Engineer | ASHISH RAMAKANT GADAKARI |
| Chartered Accountant | NIKHIL BHOITE AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| MIG CONSTRUCTION LLP | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 164/2021/2021 | CIVIL JUDGE JR DV JMFC PHALTAN | Closed |
| 283/2023/2023 | CIVIL JUDGE JR DV JMFC PHALTAN | Ongoing |
| 164/2021/2021 | CIVIL JUDGE JR DV JMFC PHALTAN | Closed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 6 Dec 2028
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: sumit b a 1.pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: gad e 1.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: C A Certificate-1 (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 1File: sumit b a 1.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: gad e 1.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: C A Certificate-1 (1).pdf | 27 Jan 2026 |
| Withdrawal Update Form 1File: sumit b a 1.pdf | 19 Nov 2025 |
| Withdrawal Update Form 2File: gad e 1.pdf | 19 Nov 2025 |
| Withdrawal Update Form 3File: C A Certificate-1 (1).pdf | 19 Nov 2025 |
| Form 3File: FORM 3 NEW FORMAT - Q4 23-24.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD- BOOKED INVENTORY.pdf | 14 Oct 2025 |
| Form 1File: RERA CERTIFICATE_R1_PHALTAN.pdf | 14 Oct 2025 |
| Form 2File: FORM 2 NEW FORMAT Q4 23-24.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD- BOOKED INVENTORY.pdf | 14 Oct 2025 |
| Form 3File: FORM 3 NEW FORMAT - Q1 -24-25.pdf | 14 Oct 2025 |
| Form 2File: FORM 2 NEW FORMAT Q1 24-25.pdf | 14 Oct 2025 |
| Form 1File: RERA CERTIFICATE_R2_PHALTAN.pdf | 14 Oct 2025 |
| Form 1File: RERA CERTIFICATE_R3_PHALTAN (1).pdf | 14 Oct 2025 |
| Form 2File: FORM 2 NEW FORMAT Q2 24-25.pdf | 14 Oct 2025 |
| Form 3File: FROM 3 NEW FORMAT Q2-24-25.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD- BOOKED INVENTORY.pdf | 14 Oct 2025 |
| Form 2File: FORM 2 NEW FORMAT Q3 24-25.pdf | 14 Oct 2025 |
| Form 3File: FORM 3 NEW FORMAT - Q3 - 24-25.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD- BOOKED INVENTORY.pdf | 14 Oct 2025 |
| Form 1File: RERA CERTIFICATE_R4_PHALTAN.pdf | 14 Oct 2025 |
| Form 1File: RERA CERTIFICATE_R4_PHALTAN.pdf | 14 Oct 2025 |
| Form 2File: FORM 2 NEW FORMAT Q4 24-25.pdf | 14 Oct 2025 |
| Form 3File: FROM 3 NEW FORMAT Q4 24-25.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD- BOOKED INVENTORY.pdf | 14 Oct 2025 |
| Form 1File: RERA CERTIFICATE_R3_PHALTAN.pdf | 14 Oct 2025 |
| Form 2File: FORM 2 NEW FORMAT Q1 25-26.pdf | 14 Oct 2025 |
| Form 3File: FORM 3 NEW FORMAT - Q1 25-26.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD- BOOKED INVENTORY.pdf | 14 Oct 2025 |
| Details of encumbrances concerned to FinanceFile: self declaration 1.pdf | 8 Jan 2024 |
| Details of encumbrances concerned to LegalFile: self declaration 1.pdf | 8 Jan 2024 |
| Other - LegalFile: pdfresizer com pdf-resize.pdf | 8 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: REAL ORG.pdf | 5 Jan 2024 |
| Proforma of Agreement for saleFile: Model_AFS_in_Marathi.pdf | 5 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS.pdf | 5 Jan 2024 |
| Other - LegalFile: 1 Other - Legal.pdf | 5 Jan 2024 |
| Other - LegalFile: 2 Other - Legal.pdf | 5 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate-1 (1).pdf | 29 Dec 2023 |
| Declaration about Commencement CertificateFile: commencment certificate.pdf | 28 Dec 2023 |
| CERSAI detailsFile: Cersai Certificate.pdf | 28 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation copy model.pdf | 28 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: legal certificate mig construction_page-0001 (1).pdf | 22 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: New Doc NO ENCUMBARANCE.pdf | 22 Dec 2023 |
| Details of encumbrances concerned to LegalFile: legal certificate mig construction_page-0001 (1).pdf | 22 Dec 2023 |
| Details of encumbrances concerned to LegalFile: New Doc NO ENCUMBARANCE.pdf | 22 Dec 2023 |
| Proforma of Allotment letterFile: allotment letter UPDATE MIG.pdf | 22 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT.pdf | 22 Dec 2023 |
| Copy of the legal title reportFile: Search Report_compressed.pdf | 21 Dec 2023 |
| Layout approvalFile: FINAL ONLINE DWG LAYOUT CO SIGN.pdf | 20 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: FINAL ONLINE DWG LAYOUT CO SIGN.pdf | 20 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA CERTIFICATE_R1_PHALTAN.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DSC.pdf | 20 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Booking Related.pdf | 20 Dec 2023 |
| Building plan approvalFile: NA ORDER.pdf | 6 Dec 2023 |
| PAN CardFile: PAN CARD MIG CONSTUCTION (2).pdf | 6 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf | 6 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Bandhkam Order.pdf | 6 Dec 2023 |
| Declaration in FORM BFile: Ghoshnapatra.pdf | 6 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TRIANGLE HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PHALTAN1,100+ in Satara
Filed coordinates, straight-line distance. 46 registered projects within 2 km.
Plotted development scheme at S.No.129.Wathar
Pune Housing & Area Development Board
ALPHA WORLD
PARAG PRAMOD DHADIWAL
INDUS LANDMARK
INDUS PROMOTERS
SWARA CITY
JAGDISH RAMVILAS KARVA
EMPIRE TOWERS
RAM AND J K ASSOCIATES
SWARA TOWER
SWARA BUILDCON
See every Satara project, with the district possession charts
Builder: MIG CONSTRUCTION LLP
MIG CONSTRUCTION LLP has 1 registration on MahaRERA, including TRIANGLE HEIGHTS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if TRIANGLE HEIGHTS is delayed beyond 6 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TRIANGLE HEIGHTS?
The registered promoter entity is MIG CONSTRUCTION LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TRIANGLE HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TRIANGLE HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TRIANGLE HEIGHTS?
The professionals named in the filing: Architect: SUMIT BAGADE; Engineer: ASHISH RAMAKANT GADAKARI; Chartered Accountant: NIKHIL BHOITE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRIANGLE HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback