Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
109 of 167Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

HILL CREST PARK is a Plotted project by LIMRA DEVELOPERS in Satara, Maharashtra, registered with MahaRERA as P52700003083 on 4 Aug 2017. Possession is promised by 14 Dec 2026. The completion date has moved by 36 months from the original filing. 58 of the 167 units on this registration are recorded sold or booked.

At a glance

Project

  • NameHILL CREST PARK
  • TypePlotted
  • Location
    • Ajnuj
    • Khandala
    • Satara
    • 412802
  • Pincode412802
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700003083
  • ReraGenie IDRG-MH-10240

Builder

  • NameLIMRA DEVELOPERS
  • Entity typePartnership
  • PartnersKetan Jayantilal Veera, Vikas Suvalal Desadla, Alim Abdul Rahim Shaikh, Alpesh Jashubhai Patel, Govind Bhagchandani Hassanand, Ramesh Kimatram Chhabria, Sharad Narayanrao Mogale, Ajit Zumbarlal Karnawat

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Aug 2017
  • Promised completion14 Dec 2026
  • Revised completionRevised to 14 Dec 2026 (originally 15 Dec 2023)
  • BuildingsNot stated in filing
  • Documents filed78 files

Current status

35%58 of 167 units booked

Figures as on 18 Jan 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities19

As on 18 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
CIUB HOUSEYes0%
GatesYes10%
Compound WallYes30%
Tree PlantationYes30%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area86,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI48229.0
Proposed, not sanctioned48,228 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDipak park kalyaninagar Ramwadi

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
LIMRA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700025289Dec 2023 → Dec 2026

Reason as filed by the promoterextension application done to complete the work as mention in the agreement to sale

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 14 Dec 2026

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B.pdf18 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Nov 24.pdf19 Dec 2024
Certificates of CA (Form 3)File: Form 3 sep_signed_compressed.pdf19 Dec 2024
Certificates of CA (Form 3)File: Form 3 june_signed_compressed.pdf19 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order Pargaon_Commencement Certificate.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_2019_20.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_2020_21.pdf19 Dec 2024
Declaration about Commencement CertificateFile: Format D_SIGN.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_2021_22.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_2022_23.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_2023_24.pdf19 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31032021 Sing.pdf25 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30092024 sing.pdf25 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30062024 sing.pdf25 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31032023 sign.pdf25 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31032022 sing.pdf25 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31032024 sing.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: form 3 HILL CREST PARK 31-03-2018.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 3 HILL CREST PARK 31-03-2019 .pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 3 HILL CREST PARK 31-03-2020.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 3 HILL CREST PARK 31-03-2021.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 3 HILL CREST PARK 31-03-2022.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 3 HILL CREST PARK 31-03-2023.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 3 HILL CREST PARK 31-03-2024.pdf21 Nov 2024
Certificates of CA (Form 3)File: FORM 3 HILL CREST PARK 31-03-2023_Both sign_compressed.pdf20 Nov 2024
Certificates of CA (Form 3)File: Form 3 30092024_both sign_compressed.pdf20 Nov 2024
Certificates of CA (Form 3)File: form 3 30 06 2024 Both sign_compressed.pdf20 Nov 2024
Certificates of CA (Form 3)File: FORM 3 HILL CREST PARK 31032024_both sign_compressed.pdf20 Nov 2024
Certificates of CA (Form 3)File: FORM 3 HILL CREST PARK 31-03-2022_both sign_compressed.pdf20 Nov 2024
Certificates of CA (Form 3)File: FORM 3 HILL CREST PARK 31-03-2022_both sign_compressed.pdf20 Nov 2024
Certificates of CA (Form 3)File: FORM 3 HILL CREST PARK 31032021_both sign_compressed.pdf20 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 HILL CREST PARK 31-03-2021_compressed.pdf20 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 HILL CREST PARK 31-03-2022_compressed.pdf20 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 HILL CREST PARK 31-03-2023_compressed.pdf20 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 HILL CREST PARK 31-03-2024_compressed.pdf20 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 30062024_compressed.pdf20 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 30092024_compressed.pdf20 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ALL form 2a_compressed.pdf20 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ALL form 2a_compressed-2020-2021.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure sold Unsold 30062024.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: disclosure Sold Unsold 30092024.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 31032024_sign.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 31032023_sign.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 31032022_sign.pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory 31032021_sign.pdf20 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ALL form 2a_compressed-2021-2022.pdf20 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ALL form 2a_compressed-2022-2023.pdf20 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ALL form 2a_compressed 2023-2024.pdf20 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf29 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf29 Jun 2024
Copy of the legal title reportFile: tiltel report.pdf2 Aug 2017
Copy of the legal title reportFile: title Report 2.pdf2 Aug 2017
Copy of the legal title reportFile: title report 3.pdf2 Aug 2017
Copy of the legal title reportFile: title report 4.pdf2 Aug 2017
Copy of the legal title reportFile: title report 5.pdf2 Aug 2017
Copy of the legal title reportFile: title report 6.pdf2 Aug 2017
Copy of the legal title reportFile: title report 7.pdf2 Aug 2017
Copy of the legal title reportFile: title report 8.pdf2 Aug 2017
Copy of the legal title reportFile: title report 9.pdf2 Aug 2017
Copy of the legal title reportFile: title report 10.pdf2 Aug 2017
Copy of the legal title reportFile: title report 11.pdf2 Aug 2017
Copy of the legal title reportFile: title report 12.pdf2 Aug 2017
Copy of the legal title reportFile: title report 13.pdf2 Aug 2017
Copy of the legal title reportFile: title report 14.pdf2 Aug 2017
Copy of the legal title reportFile: title report 15.pdf2 Aug 2017
Declaration in FORM BFile: FORM B DECLARATION .pdf2 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Limra rera certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA_Certificate final.pdf31 Jul 2017
Proforma of Allotment letterFile: Sale Deed Hill Crest.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Limra rera certificate-2.pdf28 Jul 2017
Proforma of Allotment letterFile: Limra Allotment Letter.pdf28 Jul 2017
Details of encumbrancesFile: encumbrances.pdf27 Jul 2017
Building plan approval or NA orderFile: lay out.pdf20 Jul 2017
Layout approvalFile: Lay out Limra .pdf20 Jul 2017
PAN CardFile: Pan Card-.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: Lay out Limra .pdf20 Jul 2017
Building Plan Approval (IOD)File: lay out.pdf20 Jul 2017

How this compares with Satara

35%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 36 months
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep HILL CREST PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ajnuj1,100+ in Satara

2 kmHILL CREST PARKCompleted 1Lapsed / revoked 3Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: LIMRA DEVELOPERS

LIMRA DEVELOPERS has 1 registration on MahaRERA, including HILL CREST PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if HILL CREST PARK is delayed beyond 14 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HILL CREST PARK?

The registered promoter entity is LIMRA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HILL CREST PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HILL CREST PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in HILL CREST PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HILL CREST PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HILL CREST PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.