Home / Browse projects / Satara, Maharashtra / ADITYA TRUPTI RESIDENCY

Registered No litigation declared Residential / Group Housing project

ADITYA TRUPTI RESIDENCY

By ARVIND BAPU PISE

RG-MH-52832 · RERA P52700053226 · Last updated on MahaRERA portal: 3 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
15 of 44Construction stages doneacross 4 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
141 of 197Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

ADITYA TRUPTI RESIDENCY is a Residential / Group Housing project by ARVIND BAPU PISE in Satara, Maharashtra, registered with MahaRERA as P52700053226 on 23 Oct 2023. Possession is promised by 31 Dec 2028. 56 of the 197 units on this registration are recorded sold or booked, and 15 of 44 construction stages are filed complete.

At a glance

Project

  • NameADITYA TRUPTI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • BARAMATI ROAD
    • NEAR WATER TANK
    • MHASAWD
    • Man
    • Satara
    • 415509
  • Pincode415509
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700053226
  • ReraGenie IDRG-MH-52832

Builder

  • NameARVIND BAPU PISE
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed75 files

Current status

28%56 of 197 units booked
89.3%Work done, per cost certificate

Figures as on 3 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA5518927
BUILDING BNA5550050
BUILDING CNA5550050
BUILDING DNA5570070

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 3 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

BUILDING A71%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
BUILDING B18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
BUILDING D71%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 3 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed169

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots169
Open Space169
BuildingOpen SpaceTotal
BUILDING A2626
BUILDING B1010
BUILDING C109109
BUILDING D2424

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,140 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Aug 2025

Approvals and building plan

Sanctioning authorityEE/BP/PMAYA/AMAHADA
Permissible FSI7583.79
Proposed, not sanctioned7,584 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2621 AND 2622, DHALE MAMA SHOPPING COMPLESX, SY NO 1237/5 AND 1237/6 MHASWAD
Estimated costRs 14.65 cr
Cost incurredRs 13.08 cr
Work done89.28%
BuildingWingEstimatedIncurred
BUILDING BNARs 4.08 crRs 3.68 cr
BUILDING CNARs 4.08 crRs 3.68 cr
BUILDING DNARs 3.96 crRs 3.58 cr
BUILDING ANARs 1.53 crRs 1.39 cr
-NARs 1.00 crRs 74.45 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHESH G PARTE PARTE
EngineerAMOL GORAKH SABALE
EngineerBR ASSOCIATES
Chartered AccountantSANDIP ANANDRAO SUTAR
Chartered AccountantNPSR & Associates
Chartered AccountantGanesh manddlecha
PartnerRole in project
ARVIND BAPU PISE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q 3.pdf3 Apr 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf3 Apr 2026
Withdrawal Update Form 3File: form 3 Q3.pdf3 Apr 2026
Withdrawal Update Form 1File: Form 1 Q 2.pdf25 Mar 2026
Withdrawal Update Form 1File: Form 1 Q 2.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q2.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q2.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 Q 2.pdf25 Mar 2026
Withdrawal Update Form 3File: Signed Form 3 Q2_compressed.pdf25 Mar 2026
Withdrawal Update Form 1File: Architect Certificate 30 june.pdf28 Aug 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Q1.pdf28 Aug 2025
Withdrawal Update Form 3File: Form 3 (1)_11zon.pdf28 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pise Form A Rera.pdf23 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ MARCH 24.pdf3 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_ MARCH 2024.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ JUNE 24.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 24.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ DEC 24.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 24.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ MARCH 24.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ JUNE 24.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ SEP 24.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ DEC 24_compressed.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ JUNE 24.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ DEC 24.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ SEP 24.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 24.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 24_compressed.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ JUNE 24_compressed.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ SEP 24_compressed.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ DEC 24_compressed.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ADITYA TRUPTI RESIDENCY_DEC 23.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ADITYA TRUPTI RESIDENCY_DEC 23.pdf29 Feb 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-ADITYA TRUPTI RESIDENCY_DEC 23_compressed.pdf29 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-ADITYA TRUPTI RESIDENCY_DEC 23_compressed.pdf29 Feb 2024
Other - LegalFile: sale deed_compressed.pdf9 Oct 2023
Declaration about Commencement CertificateFile: GetUserDocumentFileContent.pdf4 Oct 2023
Copy of the legal title reportFile: TITLE _compressed.pdf27 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: LETTER.pdf18 Sep 2023
Declaration in FORM BFile: FORM B AFFIDAVIT CUM DECLARATION_compressed.pdf18 Sep 2023
Layout approvalFile: layout highleted.pdf14 Sep 2023
Layout approvalFile: 2.pdf14 Sep 2023
Building plan approvalFile: 3.pdf14 Sep 2023
Building plan approvalFile: 4.pdf14 Sep 2023
Building plan approvalFile: 6.pdf14 Sep 2023
Building plan approvalFile: 8.pdf14 Sep 2023
Building plan approvalFile: 9.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: layout highleted.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: 2.pdf14 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf14 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf14 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf14 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf14 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf14 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Revalidation of Plinth CC.pdf14 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC for Bldg 'C'.pdf14 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Plan Letter.pdf14 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: म्हाडा commencement certificate.pdf14 Sep 2023
Details of encumbrances concerned to FinanceFile: 5 Legal Encumbrance on Promoter Letterhead.pdf8 Aug 2023
Details of encumbrances concerned to LegalFile: 5 Legal Encumbrance on Promoter Letterhead.pdf8 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Merged.pdf21 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 17 Disclosure of Interest in Other Real Estate Organizations.pdf16 Jul 2023
Proforma of Agreement for saleFile: Agreement to sale.pdf16 Jul 2023
Deviation Report with respect to Allotment letterFile: Deviation with respect to allotment letter.pdf16 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf16 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report_200272352318_For_Asset_Based_Search_23_06_2023_14_17_45_578.pdf23 Jun 2023
PAN CardFile: 1 PAN CARD.pdf2 Jun 2023
Details of encumbrances concerned to FinanceFile: 5 Legal Encumbrance.pdf2 Jun 2023
Details of encumbrances concerned to LegalFile: 5 Legal Encumbrance.pdf2 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 FORM 1 ARCT CERTIFICATE.pdf2 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 FORM 1 ARCT CERTIFICATE-2.pdf2 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 FORM 2 - ENGINEER'S CERTIFICATE FORMAT NEW A B C D.pdf2 Jun 2023
Proforma of Allotment letterFile: PROFORMA OF ALLOTMENT LETTER.pdf2 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 18 Declaration about Separate Bank Account for real estate projects.pdf2 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MHASWADMHASWAD AREA1CompletedOct 2019Oct 2019

How this compares with Satara

28%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep ADITYA TRUPTI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR WATER TANK1,100+ in Satara

Builder: ARVIND BAPU PISE

ARVIND BAPU PISE has 2 registrations on MahaRERA, including Aditya - Trupti Residency and ADITYA TRUPTI RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if ADITYA TRUPTI RESIDENCY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADITYA TRUPTI RESIDENCY?

The registered promoter entity is ARVIND BAPU PISE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADITYA TRUPTI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADITYA TRUPTI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ADITYA TRUPTI RESIDENCY?

The professionals named in the filing: Architect: MAHESH G PARTE PARTE; Engineer: AMOL GORAKH SABALE; Engineer: BR ASSOCIATES; Chartered Accountant: SANDIP ANANDRAO SUTAR; Chartered Accountant: NPSR & Associates; Chartered Accountant: Ganesh manddlecha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADITYA TRUPTI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADITYA TRUPTI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADITYA TRUPTI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.