Home / Browse projects / Satara, Maharashtra / Nivaan Riviera
Nivaan Riviera
RG-MH-79810 · RERA P52700050836 · Last updated on MahaRERA portal: 18 Sep 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Nivaan Riviera is a Plotted project by Riverfront Developers in Satara, Maharashtra, registered with MahaRERA as P52700050836 on 9 May 2023. The registration is recorded completed; possession was promised by 30 Sep 2024. 0 of the 135 units on this registration are recorded sold or booked.
At a glance
Project
- NameNivaan Riviera
- TypePlotted
- Location
- Shirwal
- Gat No 1353 1354 1366
- Khandala
- Satara
- 412801
- Pincode412801
- RERA no.P52700050836
- ReraGenie IDRG-MH-79810
Builder
- NameRiverfront Developers
- Entity typePartnership
- PartnersSanjay Chandrakant Shah, Ankush Vijaykumar Mehta, Pramod Bhagchand Ranka, Akshay Arun Shah
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 May 2023
- Promised completion30 Sep 2024
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed88 files
Current status
Figures as on 18 Sep 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 18 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prashant Kadam |
| Engineer | Prashant Kadam |
| Chartered Accountant | CA Priyesh Jain |
| Chartered Accountant | Priyesh Prakash Jain |
| Chartered Accountant | Nilesh Raut |
| Partner | Role in project |
|---|---|
| Riverfront Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Sep 2025
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Completion CertificateFile: Completion Certificate 08082023.pdf | 18 Sep 2025 |
| Form 2A (FY 2023-2024) | 5 Jun 2025 |
| Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf | 5 Jun 2025 |
| Form 5 (FY 2023-2024)File: Form-5 RERA Audit FY 2023-24.pdf | 5 Jun 2025 |
| Form 5 (FY 2024-2025)File: Form-5 RERA Audit FY 2024-25.pdf | 5 Jun 2025 |
| Completion CertificateFile: Form-4 Architect Certificate 13102024.pdf | 5 Jun 2025 |
| Completion CertificateFile: Nivaan Riviera Tahsil Letter 30092024.pdf | 5 Jun 2025 |
| Form 1File: Form-1 Architect Certificate 31122023.pdf | 30 May 2025 |
| Form 2File: Form-2 Engineer Certificate 31122023.pdf | 30 May 2025 |
| Form 3File: Form-3 CA Certificate 31122023.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122023.pdf | 30 May 2025 |
| Form 1File: Form-1 Architect Certificate 31032024.pdf | 30 May 2025 |
| Form 2File: Form-2 Engineer Certificate 31032024.pdf | 30 May 2025 |
| Form 3File: Form-3 CA Certificate 31032024.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032024.pdf | 30 May 2025 |
| Form 1File: Form-1 Architect Certificate 30062024.pdf | 30 May 2025 |
| Form 2File: Form-2 Engineer Certificate 30062024.pdf | 30 May 2025 |
| Form 3File: Form-3 CA Certificate 30062024.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062024.pdf | 30 May 2025 |
| Form 1File: Form-1 Architect Certificate 30092024.pdf | 30 May 2025 |
| Form 2File: Form-2 Engineer Certificate 30092024.pdf | 30 May 2025 |
| Form 3File: Form-3 CA Certificate 30092024.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092024.pdf | 30 May 2025 |
| Form 1File: Form-1 Architect Certificate 30092023.pdf | 30 May 2025 |
| Form 2File: Form-2 Engineer Certificate 30092023.pdf | 30 May 2025 |
| Form 3File: Form-2 Engineer Certificate 30092023.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory 18082023.pdf | 30 May 2025 |
| Form 1File: Form-1 Architect Certificate 30062023.pdf | 30 May 2025 |
| Form 2File: Form-2 Engineer Certificate 30062023.pdf | 30 May 2025 |
| Form 3File: Form-3 CA Certificate 30062023.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory 30062023.pdf | 30 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31122023.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31032024.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30062024.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092024.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092023.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30062023.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30092023.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31122023.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31032024.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30062024.pdf | 2 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30092024.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30062023.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30092024.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30062024.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31032024.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31122023.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30092023.pdf | 2 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 31122023.pdf | 2 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 31032024.pdf | 2 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 30062024.pdf | 2 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 30092024.pdf | 2 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A Quality Assurance Certificate FY 2023-24.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30062023.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 30062023.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 18082023.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory 30112023.pdf | 29 Nov 2023 |
| Building plan approval or NA orderFile: NA Order 08082023_compressed.pdf | 11 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NA Order 08082023_compressed.pdf | 11 Aug 2023 |
| Copy of the legal title reportFile: Legal Title Report 04052023_compressed.pdf | 4 May 2023 |
| Layout approvalFile: Layout Approval 1-1v1.pdf | 24 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Approval 1-1v1.pdf | 24 Apr 2023 |
| Declaration about Commencement CertificateFile: Format-D Declaration about Commencement Certificate.pdf | 24 Apr 2023 |
| Proforma of Agreement for saleFile: Proforma of Agreement for sale Draft.pdf | 18 Apr 2023 |
| Proforma of Allotment letterFile: Proforma of Allotment letter Draft.pdf | 18 Apr 2023 |
| Building plan approval or NA orderFile: Commencement Certificate.pdf | 5 Apr 2023 |
| PAN CardFile: PAN Riverfront Developers.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Finance 31032023.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Legal 31032023.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Finance 31032023.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Finance 31032023.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Legal 31032023.pdf | 5 Apr 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Finance 31032023.pdf | 5 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Commencement Certificate.pdf | 5 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 5 Apr 2023 |
| Declaration in FORM BFile: Form-B Affidavit 04042023.pdf | 5 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31032023.pdf | 5 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineers Certificate 31032023.pdf | 5 Apr 2023 |
| CERSAI detailsFile: CERSAI undertaking 31032023.pdf | 5 Apr 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_05042023.pdf | 5 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 88 filed documents as one ZIP, foldered, with a manifest
Keep Nivaan Riviera on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Gat No 1353 1354 13661,100+ in Satara
GRAND AVENUE
ALANKAR REALITIES
Clover Windermere Phase -I
Amalfi Enterprise
PETALS
DINESH VASUDEV BHARGUDE
AMBIKA VIHAR
MALEKAR TAMBE ASSOCIATES LLP
Quadra Town
Bhujbal Brothers Properties
SHIVAM VRUNDAVAN
SHIVAM REALITIES
See every Satara project, with the district possession charts
Builder: Riverfront Developers
Riverfront Developers has 1 registration on MahaRERA, including Nivaan Riviera. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if Nivaan Riviera is delayed beyond 30 Sep 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Nivaan Riviera?
The registered promoter entity is Riverfront Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Nivaan Riviera?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Nivaan Riviera?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Nivaan Riviera?
The professionals named in the filing: Architect: Prashant Kadam; Engineer: Prashant Kadam; Chartered Accountant: CA Priyesh Jain; Chartered Accountant: Priyesh Prakash Jain; Chartered Accountant: Nilesh Raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Nivaan Riviera?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback