Home / Browse projects / Satara, Maharashtra / ALPHA WORLD

Registered No litigation declared Others project

ALPHA WORLD

By PARAG PRAMOD DHADIWAL

RG-MH-43161 · RERA P52700052966 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
184 of 248Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

ALPHA WORLD is a Others project by PARAG PRAMOD DHADIWAL in Satara, Maharashtra, registered with MahaRERA as P52700052966 on 6 Oct 2023. Possession is promised by 31 Dec 2027. 64 of the 248 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameALPHA WORLD
  • TypeOthers
  • Location
    • PHALTAN
    • Phaltan (M Cl)
    • Satara
    • 415523
  • Pincode415523
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700052966
  • ReraGenie IDRG-MH-43161

Builder

  • NamePARAG PRAMOD DHADIWAL
  • Entity typeIndividual
  • GSTIN27BERPD0738N2Z1

Key dates

this monthRegisteredOct 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Current status

26%64 of 248 units booked
44.4%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA14142328240
Building 2 CommercialNA33088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

Building 173%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
Building 2 Commercial60%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed274

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots274
Closed/Covered10
Open Space264
BuildingClosed/CoveredOpen SpaceTotal
Building 13240243
Building 2 Commercial72431

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,654 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025

Approvals and building plan

Permissible FSI11161.07
Proposed, not sanctioned11,161 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNIT NO 01-S NO 815 TANDALE HEIGHTS LAW COLLEGE ROAD SHIVAJI NAGAR
Estimated costRs 20.95 cr
Cost incurredRs 9.30 cr
Work done44.41%
BuildingWingEstimatedIncurred
Building 1NARs 18.50 crRs 7.82 cr
-NARs 2.45 crRs 1.48 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDATTATRAY M PARSHURAM
EngineerMAHESH KADAM
EngineerSaurabh Anil Gursale
Chartered AccountantCA Devendra Sisodiya
Chartered AccountantD A Sisodiya and Associates
Chartered AccountantMGBM & Associates
PartnerRole in project
PARAG PRAMOD DHADIWAL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1.pdf15 Jul 2026
Withdrawal Update Form 2File: Form2.pdf15 Jul 2026
Withdrawal Update Form 3File: Form3.pdf15 Jul 2026
Withdrawal Update Form 1File: Form1.pdf22 Apr 2026
Withdrawal Update Form 1File: Form1.pdf22 Apr 2026
Withdrawal Update Form 2File: Form2.pdf22 Apr 2026
Withdrawal Update Form 2File: Form2.pdf22 Apr 2026
Withdrawal Update Form 3File: Form3.pdf22 Apr 2026
Withdrawal Update Form 3File: Form3.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf20 Jan 2026
Withdrawal Update Form 1File: PHALTAN ARCHITECTS CERTIFICATE.pdf21 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate 30_09_2025.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 30_09_2025.pdf21 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5.pdf30 Sep 2025
Withdrawal Update Form 1File: Form1 30_06_2025.pdf28 Jul 2025
Withdrawal Update Form 2File: Form 2 30_06_2025.pdf28 Jul 2025
Withdrawal Update Form 3File: Form 3 30_06_2025.pdf28 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31032025.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31032025.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold 30092024.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold 30062024.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold 31032024.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092024.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032024.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092024 form 2.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30092024.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30062024.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032024.pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Form 5.pdf14 Oct 2024
Declaration about Commencement CertificateFile: Format D.pdf15 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Format D.pdf22 Aug 2023
Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf19 Jul 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf19 Jul 2023
Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf19 Jul 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf19 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Jul 2023
Other - TechnicalFile: Declaration Regarding Fitness Centre.pdf19 Jul 2023
Copy of the legal title reportFile: updated search report.pdf24 Apr 2023
Details of encumbrances concerned to FinanceFile: No Encumbrances concerned to Legal.pdf21 Apr 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate.pdf21 Apr 2023
Details of encumbrances concerned to LegalFile: No Encumbrances concerned to Legal.pdf21 Apr 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate.pdf21 Apr 2023
Deviation Report with respect to Allotment letterFile: No Deviation With Respect to Allotment Letter.pdf21 Apr 2023
Other - LegalFile: No Encumbrance Certificate.pdf21 Apr 2023
Other - LegalFile: No Deviation Respect to Model Copy of Agreement.pdf21 Apr 2023
Layout approvalFile: 1_compressed.pdf19 Apr 2023
Building plan approvalFile: 2_compressed.pdf19 Apr 2023
Building plan approvalFile: 3_compressed_compressed.pdf19 Apr 2023
Building plan approvalFile: 4.pdf19 Apr 2023
Building plan approvalFile: 5_compressed.pdf19 Apr 2023
Building plan approvalFile: 6_compressed.pdf19 Apr 2023
Building plan approvalFile: 7_compressed.pdf19 Apr 2023
PAN CardFile: PAN.pdf19 Apr 2023
Copy of Layout Approval (in case of layout)File: 1_compressed.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 3_compressed_compressed.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 5_compressed.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 6_compressed.pdf19 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 7_compressed.pdf19 Apr 2023
Declaration in FORM BFile: FORM B Promoter.pdf19 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200266137071_For_Asset_Based_Search_14_04_2023_16_01_15_011.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf19 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_compressed.pdf19 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest In other Real Estate Organization.pdf19 Apr 2023
Proforma of Agreement for saleFile: Model Copy of Agreement.pdf19 Apr 2023
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf19 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details.pdf19 Apr 2023

How this compares with Satara

26%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep ALPHA WORLD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PHALTAN1,100+ in Satara

2 kmALPHA WORLDCompleted 3Lapsed / revoked 8Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: PARAG PRAMOD DHADIWAL

PARAG PRAMOD DHADIWAL has 1 registration on MahaRERA, including ALPHA WORLD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if ALPHA WORLD is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ALPHA WORLD?

The registered promoter entity is PARAG PRAMOD DHADIWAL, an individual as per the filing. Its GSTIN 27BERPD0738N2Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ALPHA WORLD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ALPHA WORLD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ALPHA WORLD?

The professionals named in the filing: Architect: DATTATRAY M PARSHURAM; Engineer: MAHESH KADAM; Engineer: Saurabh Anil Gursale; Chartered Accountant: CA Devendra Sisodiya; Chartered Accountant: D A Sisodiya and Associates; Chartered Accountant: MGBM & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALPHA WORLD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALPHA WORLD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALPHA WORLD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.