Home / Browse projects / Satara, Maharashtra / INDUS LANDMARK
INDUS LANDMARK
RG-MH-22516 · RERA P52700031910 · Last updated on MahaRERA portal: 22 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 4.00 crore secured on the land, in favour of BANK OF MAHARASHTRA
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
INDUS LANDMARK is a Others project by INDUS PROMOTERS in Satara, Maharashtra, registered with MahaRERA as P52700031910 on 22 Nov 2021. Possession is promised by 31 Dec 2027. 121 of the 144 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameINDUS LANDMARK
- TypeOthers
- Location
- SHINGNAPUR ROAD
- NEAR ANANT MANGAL KARALAY
- Kolki (CT)
- Phaltan
- Satara
- 415523
- Pincode415523
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700031910
- ReraGenie IDRG-MH-22516
Builder
- NameINDUS PROMOTERS
- Entity typePartnership
- PartnersYASHWARDHAN RAJIV NAIK NIMBALKAR, VINOD BALRAMSINGH MARWAHA, SATYAJEET SANJEEV NAIK NIMBALKAR, SHIVTEJ UMESH NAIK NIMBALKAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Nov 2021
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed117 files
Current status
Figures as on 22 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| INDUS LANDMARK- A | NA | 8 | 8 | 58 | 14 | 72 |
| INDUS LANDMARK- B | NA | 7 | 0 | 58 | 14 | 72 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 22 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
INDUS LANDMARK- A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
INDUS LANDMARK- B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed19
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| INDUS LANDMARK- A | 11 | 3 | 14 |
| INDUS LANDMARK- B | 0 | 5 | 5 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| INDUS LANDMARK- A | NA | Rs 5.52 cr | Rs 6.68 cr |
| INDUS LANDMARK- B | NA | Rs 5.52 cr | Rs 5.87 cr |
| - | NA | Rs 20.00 lakh | Rs 20.00 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJENDRA SHIVLING GANGAM SHIVLING GANGAM |
| Engineer | RAJIV NAIK NIMBALKAR SURESHRAO NAIK NIMBALKAR |
| Chartered Accountant | KIRAN GANPATI BHAGWAT GANPATI BHAGWAT |
| Chartered Accountant | KIRAN GANPATI BHAGWAT |
| Chartered Accountant | Girish Chandrashekhar Godbole |
| Partner | Role in project |
|---|---|
| INDUS PROMOTERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Apr 2024
Documents filed117
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: withdrawlal application form1 dec25.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: withdrawlal application form1 dec25.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: withdrawal application form2 dec25.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: withdrawal application form2 dec25.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form 3 dec25.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form 3 dec25.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 sept 2025.pdf | 27 Oct 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 sept 2025.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 Oct 2025.pdf | 27 Oct 2025 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 sept 2025.pdf | 24 Oct 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 sept 2025.pdf | 24 Oct 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 Oct 2025.pdf | 24 Oct 2025 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 jun 2025.pdf | 2 Aug 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 Jun 2025.pdf | 2 Aug 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 Jun 2025_compressed (1).pdf | 2 Aug 2025 |
| Form 2A (FY 2024-2025)File: FORM-2A.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-1.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 CA CERTIFICATE.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-1.pdf | 24 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD INVANTORY-1.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA Form 2A Year 2023-2024-1.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA form 2A Year 2024-2025-2.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CERTIFICATE 1.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD -UNSOD A WING.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD -UNSOD B WING.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA CERTIFICATE.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 26 Oct 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCEITY REGISTRATION CERTIFICATE.pdf | 26 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD A WING.pdf | 26 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD B WING.pdf | 26 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 26 Oct 2024 |
| Details of encumbrancesFile: Reconvience Deed 1.pdf | 27 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A WING.pdf | 27 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate B WING.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate A WING.pdf | 27 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold A WING.pdf | 27 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold B WING.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 2.pdf | 27 Jul 2024 |
| Other - LegalFile: Reconvience Deed 1.pdf | 27 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 CERTIFICATE 2023-2024.pdf | 27 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE -A WING.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A wing.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate B wing.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE B WING.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD -UNSOLD A WING.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD -UNSOLD B WING.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM-3 new.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE A WING.pdf | 10 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE B WING.pdf | 10 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certifate.pdf | 10 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD -A WING.pdf | 10 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD -B WING.pdf | 10 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERIFICATE 1.pdf | 10 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A wing.pdf | 29 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate B wing.pdf | 29 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 29 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD INVENTORY 2.pdf | 29 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CERTIFICATE.pdf | 29 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NA ORDER NEW.pdf | 23 Sep 2023 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf | 9 Sep 2023 |
| Copy of the legal title reportFile: TITLE CERTIFICATE NEW.pdf | 9 Sep 2023 |
| Copy of the legal title reportFile: FORMAT-A FLOW OF TITLE SAID LAND.pdf | 9 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 18 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 17 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEEAR CERTIFICATE.pdf | 17 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM-3.pdf | 17 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CERTIFICATE.pdf | 17 Aug 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 3 Jul 2023 |
| Copy of the legal title reportFile: Title Certificate.pdf | 18 May 2023 |
| Details of encumbrancesFile: SELF DECLARATION FOR ENCOMEBRANCESS.pdf | 18 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf | 5 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginear Certificate.pdf | 5 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Enginear Certificate Quality Assurance.pdf | 5 May 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD WING A.pdf | 5 May 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD B WING.pdf | 5 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 5 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 117 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep INDUS LANDMARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR ANANT MANGAL KARALAY1,100+ in Satara
Plotted development scheme at S.No.129.Wathar
Pune Housing & Area Development Board
ALPHA WORLD
PARAG PRAMOD DHADIWAL
SWARA CITY
JAGDISH RAMVILAS KARVA
EMPIRE TOWERS
RAM AND J K ASSOCIATES
TRIANGLE HEIGHTS
MIG CONSTRUCTION LLP
SWARA TOWER
SWARA BUILDCON
See every Satara project, with the district possession charts
Builder: INDUS PROMOTERS
INDUS PROMOTERS has 1 registration on MahaRERA, including INDUS LANDMARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if INDUS LANDMARK is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of INDUS LANDMARK?
The registered promoter entity is INDUS PROMOTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in INDUS LANDMARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for INDUS LANDMARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at INDUS LANDMARK?
The professionals named in the filing: Architect: RAJENDRA SHIVLING GANGAM SHIVLING GANGAM; Engineer: RAJIV NAIK NIMBALKAR SURESHRAO NAIK NIMBALKAR; Chartered Accountant: KIRAN GANPATI BHAGWAT GANPATI BHAGWAT; Chartered Accountant: KIRAN GANPATI BHAGWAT; Chartered Accountant: Girish Chandrashekhar Godbole. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in INDUS LANDMARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback