Home / Browse projects / Thane, Maharashtra / SAI WORLD LEGEND

Completed No litigation declared Others project

SAI WORLD LEGEND

By Paradise Lifestyles Private Limited

RG-MH-28148 · RERA P51700025002 · Last updated on MahaRERA portal: 21 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2026Possession promisedregistration recorded completed
7 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

SAI WORLD LEGEND is a Others project by Paradise Lifestyles Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700025002 on 18 Mar 2020. The registration is recorded completed; possession was promised by 1 May 2026.

At a glance

Project

  • NameSAI WORLD LEGEND
  • TypeOthers
  • Location
    • Kalyan Murbad Road
    • Ulhasnagar 1
    • Ulhasnagar (M Corp.)
    • Ulhasnagar
    • Thane
    • 421001
  • Pincode421001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700025002
  • ReraGenie IDRG-MH-28148

Builder

  • NameParadise Lifestyles Private Limited
  • Entity typeCompany
  • DirectorsMadhu Bhagwandas Bathija, Manish Madhu Bathija, Amit Madhu Bathija, Madhu Bhagwandas Bathija, Manish Madhu Bathija, Amit Madhu Bathija
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects22 →

Key dates

this monthRegisteredMar 2020PromisedMay 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Mar 2020
  • Promised completion1 May 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Commercial BuildingNA30000
AristaNA400000
BelistaNA400000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 80%.

Commercial Building31%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Arista70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor50%
Slabs of Super Structure37%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%
Belista37%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor50%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed423

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots423
Closed/Covered270
Open Space153
BuildingClosed/CoveredOpen SpaceTotal
Commercial Building7053123
Arista10050150
Belista10050150

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area31,536 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI137722.0
Proposed, not sanctioned61,901 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFREE PRESS JOURNAL MARG, NARIMAN POINT, MUMBAI 400 021

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Paradise Lifestyles Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 May 2024

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FROM 5 SWL Phase I -FY 23-24.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FROM 5 SWL Phase I -FY 23-24.pdf21 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf28 May 2024
Other - TechnicalFile: Declaration.pdf28 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SWL OC Phase 1 17052024.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 10042022.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 10042023.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 10042024.pdf10 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SWL-1 2021-22.pdf16 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SWL I 2022-23.pdf16 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Sai World Legend (FY 21-22).pdf1 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PLPL Apr 20-Mar 21.pdf1 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PLPL Apr 21-Mar 22.pdf1 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sai World Legend - FORM 5 - FY 20-21.pdf30 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf26 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf26 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf26 Feb 2022
OtherFile: IOM Index II.pdf17 Dec 2021
Copy of the legal title reportFile: RERA TITLE REPORT Final PLPL.pdf2 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Apr 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Apr 2021
Building plan approvalFile: 1.pdf9 Apr 2021
Building plan approvalFile: 2.pdf9 Apr 2021
Building plan approvalFile: 3.pdf9 Apr 2021
Building plan approvalFile: 4.pdf9 Apr 2021
Building plan approvalFile: 5.pdf9 Apr 2021
Building plan approvalFile: 6.pdf9 Apr 2021
Building plan approvalFile: 7.pdf9 Apr 2021
Building plan approvalFile: 8.pdf9 Apr 2021
Building plan approvalFile: 9.pdf9 Apr 2021
Building plan approvalFile: 10.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf9 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf9 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf9 Apr 2021
Proforma of Allotment letterFile: Allotment Letter.pdf9 Apr 2021
Proforma of Allotment letterFile: AFS.pdf9 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC.pdf9 Apr 2021
Building plan approvalFile: 1.pdf15 Mar 2021
Building plan approvalFile: 2.pdf15 Mar 2021
Building plan approvalFile: 3.pdf15 Mar 2021
Building plan approvalFile: 4.pdf15 Mar 2021
Building plan approvalFile: 5.pdf15 Mar 2021
Building plan approvalFile: 6.pdf15 Mar 2021
Building plan approvalFile: 7.pdf15 Mar 2021
Building plan approvalFile: 8.pdf15 Mar 2021
Building plan approvalFile: 9.pdf15 Mar 2021
Building plan approvalFile: 10.pdf15 Mar 2021
PAN CardFile: PARADISE LIFESTYLES PRIVATE LIMITED PAN CARD 03-07-2013.pdf15 Mar 2021
Details of encumbrancesFile: Encumbrances.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf15 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf15 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf15 Mar 2021
Proforma of Allotment letterFile: SWL AFS.pdf15 Mar 2021
Copy of the legal title reportFile: TITLE REPORT.pdf6 Mar 2020
Layout approvalFile: Layout Approval.pdf2 Mar 2020
Building plan approvalFile: 2.pdf2 Mar 2020
Building plan approvalFile: 3.pdf2 Mar 2020
Building plan approvalFile: 3A.pdf2 Mar 2020

Promoter's earlier projects21

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 delivered late2 not delivered by the promised date13 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SAI WORLD EMPIRE PHASE 5 Tower -7 DE LOUISP52000056177ROHINJAN, Raigarh83May 2024OngoingDec 2031Not due yet
SAI WORLD DREAMS COMMERCIAL BUILDING NO. 2P51700080118Dombivali East, Thane84Apr 2025OngoingDec 2030Not due yet
SAI PLATINUMP52000055718Sector 36, Raigarh168Apr 2024OngoingDec 2030Not due yet
SAI WORLD LEGEND PHASE IIP51700046767Ulhasnagar 1, Thane476Sep 2022OngoingDec 2029Not due yet
SAI WORLD EMPIRE PHASE IVP52000051836Kharghar Sector 36, Raigarh293Jul 2023OngoingDec 2029Not due yet
SAI WORLD DREAMS PHASE 2P51700052710Dombivali East, Thane269Sep 2023OngoingDec 2029Not due yet
SAI WORLD CITY PHASE 3P52000053727Kolkhe, Raigarh401Nov 2023OngoingDec 2029Not due yet
SAI SUNCITY PHASE 3P52000046738Ghot, Raigarh676Sep 2022OngoingDec 2028Not due yet
SAI WORLD DREAMS PHASE 1P51700035191Dombivali East, Thane822May 2022OngoingDec 2028Not due yet
SAI SUNCITY PHASE IIP52000045371Ghot, Raigarh1,352May 2022OngoingDec 2028Not due yet
Sai World Empire Phase IIIP52000029168Rohinjan, Raigarh55May 2021OngoingDec 2027Not due yet
SAI SUNCITY PHASE 1P52000033880Ghot, Raigarh118Mar 2022OngoingDec 2026Not due yet
SAI SUNCITY COMMERCIALP52000053181Ghot, Raigarh56Oct 2023OngoingDec 2026Not due yet
SAI WORLD CITY PHASE IIP52000022708Panvel, Raigarh177Oct 2019OngoingDec 2025Not delivered
SAI WORLD RETREATP52100020452Behind lucky celebrity wax museum, Pune-Apr 2019OngoingDec 2025Registered original: Dec 2024Not delivered
Sai AaradhyaP52000021572kharghar Navi Mumbai, Raigarh-Jul 2019CompletedJun 2025Registered original: Dec 2024Mar 2025
SAI ICONP52000023156Sector 35 D Kharghar, Raigarh-Dec 2019CompletedMay 2025Registered original: Dec 2024May 2025
SAI SYMPHONYP52000017044Sector 35 F Kharghar Navi Mumbai, Raigarh-Jul 2018CompletedMar 2025Registered original: Dec 2023Mar 2025
Sai World EmpireP51700002446Rohinjan, Raigarh-Aug 2017CompletedOct 2024Registered original: Oct 2023Dec 2023
SAI WORLD EMPIRE PHASE IIP52000026796Kharghar sector 37, Raigarh-Oct 2020CompletedOct 2024Registered original: Oct 2023Jul 2024
SAI WORLD CITYP52000006318Kolkhe, Raigarh-Aug 2017CompletedDec 2022Late, Jun 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI WORLD LEGEND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ulhasnagar 17,600+ in Thane

2 kmSAI WORLD LEGENDCompleted 38Lapsed / revoked 29Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: Paradise Lifestyles Private Limited

Paradise Lifestyles Private Limited has 2 registrations on MahaRERA, including SAI WORLD LEGEND and SAI WORLD LEGEND PHASE II. Its filings disclose 22 earlier MahaRERA projects: declares 6 of 7 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAI WORLD LEGEND is delayed beyond 1 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI WORLD LEGEND?

The registered promoter entity is Paradise Lifestyles Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI WORLD LEGEND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI WORLD LEGEND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SAI WORLD LEGEND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI WORLD LEGEND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI WORLD LEGEND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.