Home / Browse projects / Raigarh, Maharashtra / SAI SUNCITY COMMERCIAL

Registered No litigation declared Commercial project

SAI SUNCITY COMMERCIAL

By Chariot Properties LLP

RG-MH-06603 · RERA P52000053181 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 300.00 crore secured on the land, in favour of Aditya Birla Capital Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 9 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 60%
24 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

SAI SUNCITY COMMERCIAL is a Commercial project by Chariot Properties LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000053181 on 17 Oct 2023. Possession is promised by 30 Dec 2026. 32 of the 56 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAI SUNCITY COMMERCIAL
  • TypeCommercial
  • Location
    • 24 Meter Road
    • Ghot
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • RERA no.P52000053181
  • ReraGenie IDRG-MH-06603

Builder

  • NameChariot Properties LLP
  • Entity typePartnership
  • PartnersManish Madhu Bathija, Amit Madhu Bathija, Madhu Bhagwandas Bathija
  • Other registrations3 more →
  • Declared earlier projects9 →

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2023
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed80 files

Current status

57%32 of 56 units booked
64.5%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Commercial Building No 1NA1102727
Commercial Building no 2NA1102929

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 60%.

Commercial Building No 112%
ActivityProgress
Excavation100%
Basement (if any)30%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial Building no 215%
ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Open Space54
BuildingOpen SpaceTotal
Commercial Building No 12727
Commercial Building no 22727

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,040 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 300.00 crore
CERSAI search filedYes
Declared on1 Jan 2026
LandownerVillageDistrict
Ananta Namdeo NighukarGhotRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI2004.81
Proposed, not sanctioned2,005 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSector 19, APMC Masala market Vashi Navi Mumbai 400705
Estimated costRs 3.91 cr
Cost incurredRs 2.52 cr
Work done64.54%
BuildingWingEstimatedIncurred
Commercial Building No 1NARs 1.70 crRs 1.10 cr
Commercial Building no 2NARs 1.62 crRs 1.10 cr
-NARs 59.20 lakhRs 32.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHiten Sethi & Associates
EngineerStructural Concept Designs Pvt Ltd
EngineerSuresh
EngineerBharat Dave
Chartered AccountantRangani & co.
Chartered AccountantS.U.Radhakrishnani & co
PartnerRole in project
Chariot Properties LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: SSC COMMERCIAL.pdf7 May 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 SSC Commercial.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 SSC Commercial.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 SSC Commercial.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 SSC Commercial.pdf16 Jan 2026
Form 1File: Form 1.pdf18 Oct 2025
Form 2File: Form 2.pdf18 Oct 2025
Form 3File: Form 3.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf18 Oct 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf18 Oct 2025
Form 1File: Form 1.pdf15 Jul 2025
Form 2File: Form 2.pdf15 Jul 2025
Form 3File: Form 3.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf15 Jul 2025
Self-declaration of Quarterly ProgressFile: Undertaking.pdf15 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf27 Jun 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf19 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Commercial.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Commercial.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Commercial.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Aug 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE.pdf11 Jun 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf11 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 22042024 SSC-Commercial March 2024.pdf10 May 2024
Details of encumbrances concerned to FinanceFile: Commercial.pdf4 Nov 2023
Details of encumbrances concerned to LegalFile: Commercial.pdf4 Nov 2023
Other - TechnicalFile: pmctp.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DECLARATION SAI SUN CITY Commercial.pdf18 Sep 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AFS.pdf14 Sep 2023
Declaration in FORM BFile: Form B Promoter.pdf31 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf31 Aug 2023
CERSAI detailsFile: Undertaking Cersai.pdf31 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf31 Aug 2023
Layout approvalFile: Sheet 1.pdf30 Aug 2023
Building plan approvalFile: Sheet 5.pdf30 Aug 2023
Building plan approvalFile: Sheet 8.pdf30 Aug 2023
Building plan approvalFile: Sheet 22.pdf30 Aug 2023
Building plan approvalFile: Sheet 24.pdf30 Aug 2023
PAN CardFile: 1 PAN Card.pdf30 Aug 2023
Copy of the legal title reportFile: Title Report.pdf30 Aug 2023
Details of encumbrances concerned to FinanceFile: No Encumberance certificate Finance.pdf30 Aug 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Legal.pdf30 Aug 2023
Details of encumbrances concerned to LegalFile: No Encumberance certificate Finance.pdf30 Aug 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Legal.pdf30 Aug 2023
Copy of Layout Approval (in case of layout)File: Sheet 1.pdf30 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 5.pdf30 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 8.pdf30 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 22.pdf30 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 24.pdf30 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 Aug 2023
Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf30 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Madhu Sir.pdf30 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Manish Sir.pdf30 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Amit Sir.pdf30 Aug 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf30 Aug 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf30 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf30 Aug 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT AL.pdf30 Aug 2023

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sai RiverdaleSector 7 Taloja244CompletedOct 2017Jul 2017
Sai MannatSector 34A325CompletedJul 2017Jul 2017
Sai HarmonySector 21 Ulwe115CompletedJul 2017Jul 2017
Sai WonderSector 35F Kharghar95CompletedJul 2017May 2017
Sai SolitaireSector 35H Kharghar83CompletedJan 2017Jun 2016
Sai CrystalSector 35D166CompletedOct 2016Sep 2016
Sai SpringSector 35G Kharghar148CompletedAug 2016Jul 2016
Sai MiracleSector 35E110CompletedAug 2016Jul 2016
Sai SapphireSector 20 Ulwe162CompletedJul 2015Jul 2015

How this compares with Raigarh

57%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI SUNCITY COMMERCIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghot5,900+ in Raigarh

Builder: Chariot Properties LLP

Chariot Properties LLP has 4 registrations on MahaRERA, including SAI SUNCITY PHASE 1 and SAI SUNCITY PHASE II. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI SUNCITY COMMERCIAL is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SUNCITY COMMERCIAL?

The registered promoter entity is Chariot Properties LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SUNCITY COMMERCIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SUNCITY COMMERCIAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SUNCITY COMMERCIAL?

The professionals named in the filing: Architect: Hiten Sethi & Associates; Engineer: Structural Concept Designs Pvt Ltd; Engineer: Suresh; Engineer: Bharat Dave; Chartered Accountant: Rangani & co.; Chartered Accountant: S.U.Radhakrishnani & co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SUNCITY COMMERCIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SUNCITY COMMERCIAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SUNCITY COMMERCIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.