ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SAI WORLD CITY

Completed No litigation declared Residential / Group Housing project

SAI WORLD CITY

By Paradise Lifespaces LLP

RG-MH-11050 · RERA P52000006318 · Last updated on MahaRERA portal: 21 Nov 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 11 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 4 buildings; every applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

SAI WORLD CITY is a Residential / Group Housing project by Paradise Lifespaces LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000006318 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSAI WORLD CITY
  • TypeResidential / Group Housing
  • Location
    • NH 4B
    • Kolkhe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000006318
  • ReraGenie IDRG-MH-11050

Builder

  • NameParadise Lifespaces LLP
  • Entity typePartnership
  • PartnersManish Madhu Bathija, Ebrahim Esmail Dhariwal, Paradise Infracon Private Limited
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects12 →

Key dates

this monthRegisteredAug 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings4 building records
  • Documents filed146 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Marina - wing A of Building no 1NA310000
Opera- wing B of Building no 1NA310000
Acropolis- wing C of Building 1NA310000
Manhattan - Building no 2NA350000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 21 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 4 buildings.

Marina - wing A of Building no 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Opera- wing B of Building no 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Acropolis- wing C of Building 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Manhattan - Building no 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1345

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,345
Closed/Covered1,345
BuildingClosed/CoveredTotal
Marina - wing A of Building no 1883883
Manhattan - Building no 2462462

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area31,473 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Paradise Lifespaces LLPMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityCIDCO NAINA
Permissible FSI109301.8
Proposed, not sanctioned70,280 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAxis Bank APMC Branch sector 19 Vashi Navi Mumbai 400705

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Paradise Lifespaces LLP-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000408121FIRDAOUS FAISAL MUNDEPARADISE LIFESPACES LLP13/11/2023
CC12400113JAGANNATH LALParadise Lifespaces LLP15/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Jan 2023

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Phase 1.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Phase 1.pdf21 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Status.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 10042023 SWC-1 March 2023.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 10042024 SWC-1 March 2024.pdf10 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SWC-Phase 1 2022-23.pdf15 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf24 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 10042023.pdf23 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SWC -FORM 5 20-21.pdf28 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SWC - FORM 5 21-22.pdf28 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf13 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 07042020.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 07042021.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 06042022.pdf6 Feb 2023
Building plan approvalFile: Club House 1.pdf31 Jan 2023
Building plan approvalFile: Club House 2.pdf31 Jan 2023
Building plan approvalFile: Club House 3.pdf31 Jan 2023
Building plan approvalFile: Club House 4.pdf31 Jan 2023
Building plan approvalFile: Club House 1.pdf31 Jan 2023
Building Plan Approval (IOD)File: Club House 1.pdf31 Jan 2023
Building Plan Approval (IOD)File: Club House 1.pdf31 Jan 2023
Building Plan Approval (IOD)File: Club House 2.pdf31 Jan 2023
Building Plan Approval (IOD)File: Club House 3.pdf31 Jan 2023
Building Plan Approval (IOD)File: Club House 4.pdf31 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Club House CC.pdf31 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Validated 24062022.pdf31 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Name Reservation SWC Bldg 1.pdf31 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5_Paradise Lifespaces LLP_Phase I.pdf25 Feb 2021
Certificates of CA (Form 5)File: Form 5 FY 18-19 SWC I.pdf31 Oct 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18-19 SWC I.pdf31 Oct 2019
Certificates of CA (Form 5)File: LLP Form 5.pdf13 Oct 2018
Building plan approvalFile: 1.pdf20 Mar 2018
Building plan approvalFile: 2.pdf20 Mar 2018
Building plan approvalFile: 3.pdf20 Mar 2018
Building plan approvalFile: 4.pdf20 Mar 2018
Building plan approvalFile: 5.pdf20 Mar 2018
Building plan approvalFile: 6.pdf20 Mar 2018
Building plan approvalFile: 7.pdf20 Mar 2018
Building plan approvalFile: 8.pdf20 Mar 2018
Building plan approvalFile: 9.pdf20 Mar 2018
Building plan approvalFile: 10.pdf20 Mar 2018
Building plan approvalFile: 12.pdf20 Mar 2018
Building plan approvalFile: 12.pdf20 Mar 2018
Building plan approvalFile: 13.pdf20 Mar 2018
Building plan approvalFile: 14.pdf20 Mar 2018
Building plan approvalFile: 15.pdf20 Mar 2018
Building plan approvalFile: 16.pdf20 Mar 2018
Building plan approvalFile: 17.pdf20 Mar 2018
Building plan approvalFile: 18.pdf20 Mar 2018
Building plan approvalFile: 19.pdf20 Mar 2018
Building plan approvalFile: 20.pdf20 Mar 2018
Building plan approvalFile: 21.pdf20 Mar 2018
Building plan approvalFile: 22.pdf20 Mar 2018
Building plan approvalFile: 23.pdf20 Mar 2018
Building plan approvalFile: 24.pdf20 Mar 2018
Building Plan Approval (IOD)File: 1.pdf20 Mar 2018
Building Plan Approval (IOD)File: 2.pdf20 Mar 2018
Building Plan Approval (IOD)File: 3.pdf20 Mar 2018
Building Plan Approval (IOD)File: 4.pdf20 Mar 2018
Building Plan Approval (IOD)File: 5.pdf20 Mar 2018
Building Plan Approval (IOD)File: 6.pdf20 Mar 2018
Building Plan Approval (IOD)File: 7.pdf20 Mar 2018
Building Plan Approval (IOD)File: 8.pdf20 Mar 2018
Building Plan Approval (IOD)File: 9.pdf20 Mar 2018
Building Plan Approval (IOD)File: 10.pdf20 Mar 2018
Building Plan Approval (IOD)File: 12.pdf20 Mar 2018
Building Plan Approval (IOD)File: 12.pdf20 Mar 2018
Building Plan Approval (IOD)File: 13.pdf20 Mar 2018
Building Plan Approval (IOD)File: 14.pdf20 Mar 2018
Building Plan Approval (IOD)File: 15.pdf20 Mar 2018
Building Plan Approval (IOD)File: 16.pdf20 Mar 2018
Building Plan Approval (IOD)File: 17.pdf20 Mar 2018
Building Plan Approval (IOD)File: 18.pdf20 Mar 2018
Building Plan Approval (IOD)File: 19.pdf20 Mar 2018
Building Plan Approval (IOD)File: 20.pdf20 Mar 2018
Building Plan Approval (IOD)File: 21.pdf20 Mar 2018
Building Plan Approval (IOD)File: 22.pdf20 Mar 2018
Building Plan Approval (IOD)File: 23.pdf20 Mar 2018
Building Plan Approval (IOD)File: 24.pdf20 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Amended CC.pdf20 Mar 2018

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

11 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAI WONDERSector 35 F Kharghar Navi Mumbai95CompletedJul 2017May 2017
SAI SOLITAIRESec 35 H Kharghar Navi Mumbai83CompletedJul 2017Jun 2017
SAI GANGASector 5 ULWE62CompletedMay 2017Jan 2017
SAI SAHILSector 5 ULWE Navi Mumbai50CompletedMay 2017Apr 2017
SAI FORTUNESector 8 ULWE99CompletedDec 2016Nov 2016
SAI CRYSTALSector 35 D Kharghar Navi Mumbai166CompletedOct 2016Sep 2016
SAI SPRINGSector 35 G Kharghar Navi Mumbai148CompletedAug 2016Jul 2016
SAI MIRACLESector 35E110CompletedAug 2016Jul 2016
SAI HARMONYSector 21 ULWE Navi Mumbai115CompletedJul 2016Jul 2016
SAI MOKSHSec 15 Kharghar Navi Mumbai73CompletedAug 2015Jun 2015
SAI SAPPHIRESector 20 Ulwe Navi Mumbai162CompletedJul 2015Jul 2015

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI WORLD CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kolkhe5,900+ in Raigarh

2 kmSAI WORLD CITYCompleted 32Lapsed / revoked 10Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: Paradise Lifespaces LLP

Paradise Lifespaces LLP has 3 registrations on MahaRERA, including SAI WORLD CITY and SAI WORLD CITY PHASE II. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI WORLD CITY is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI WORLD CITY?

The registered promoter entity is Paradise Lifespaces LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI WORLD CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAI WORLD CITY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAI WORLD CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SAI WORLD CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI WORLD CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI WORLD CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.