Home / Browse projects / Pune, Maharashtra / SAI WORLD RETREAT
SAI WORLD RETREAT
RG-MH-45983 · RERA P52100020452 · Last updated on MahaRERA portal: 14 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Completion date moved by 18 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 12 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI WORLD RETREAT is a Residential / Group Housing project by Paradise Leisure Homes in Pune, Maharashtra, registered with MahaRERA as P52100020452 on 11 Apr 2019. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 18 months from the original filing.
At a glance
Project
- NameSAI WORLD RETREAT
- TypeResidential / Group Housing
- Location
- Varsoli Road
- Behind lucky celebrity wax museum
- Varsoli
- Mawal
- Pune
- 410401
- Pincode410401
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100020452
- ReraGenie IDRG-MH-45983
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Apr 2019
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2024)
- Buildings54 building records
- Documents filed92 files
Current status
Figures as on 14 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUNGALOW NO B1-01 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B1-02 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B1-03 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B1-04 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B1-05 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B1-06 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B1-07 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B1-08 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO C-10 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B1-09 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO C-11 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B2-12 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B2-13 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B2-14 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B2-15 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B2-16 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B2-17 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO B2-18 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-19 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-20 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-21 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-22 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-23 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-24 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-25 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-26 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-27 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-28 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-29 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-30 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-31 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-32 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-33 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-34 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-35 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-36 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-37 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-38 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-39 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-40 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-41 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-42 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-43 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-44 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-45 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-46 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-47 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-48 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-49 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-50 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-51 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-52 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-53 | NA | 2 | 0 | 0 | 0 | 0 |
| BUNGALOW NO A-54 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 54 buildings; the table lists the first 20.
483 of 594 construction stages are filed complete across 54 buildings. The stage furthest along is Basement (if any), at 0%.
BUNGALOW NO B1-0182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B1-0282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B1-0382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B1-0482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B1-0582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B1-0682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B1-0782%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B1-0882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO C-1073%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B1-0982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO C-1182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B2-1282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B2-1382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B2-1482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B2-1582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B2-1673%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B2-1782%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO B2-1882%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO A-1982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW NO A-2082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUNGALOW NO B1-01 | 1 | 1 |
| BUNGALOW NO B1-02 | 1 | 1 |
| BUNGALOW NO B1-03 | 1 | 1 |
| BUNGALOW NO B1-04 | 1 | 1 |
| BUNGALOW NO B1-05 | 1 | 1 |
| BUNGALOW NO B1-06 | 1 | 1 |
| BUNGALOW NO B1-07 | 1 | 1 |
| BUNGALOW NO B1-08 | 1 | 1 |
| BUNGALOW NO C-10 | 1 | 1 |
| BUNGALOW NO B1-09 | 1 | 1 |
| BUNGALOW NO C-11 | 1 | 1 |
| BUNGALOW NO B2-12 | 1 | 1 |
| BUNGALOW NO B2-13 | 1 | 1 |
| BUNGALOW NO B2-14 | 1 | 1 |
| BUNGALOW NO B2-15 | 1 | 1 |
| BUNGALOW NO B2-16 | 1 | 1 |
| BUNGALOW NO B2-17 | 1 | 1 |
| BUNGALOW NO B2-18 | 1 | 1 |
| BUNGALOW NO A-19 | 1 | 1 |
| BUNGALOW NO A-20 | 1 | 1 |
| BUNGALOW NO A-21 | 1 | 1 |
| BUNGALOW NO A-22 | 1 | 1 |
| BUNGALOW NO A-23 | 1 | 1 |
| BUNGALOW NO A-24 | 1 | 1 |
| BUNGALOW NO A-25 | 1 | 1 |
| BUNGALOW NO A-26 | 1 | 1 |
| BUNGALOW NO A-27 | 1 | 1 |
| BUNGALOW NO A-28 | 1 | 1 |
| BUNGALOW NO A-29 | 1 | 1 |
| BUNGALOW NO A-30 | 1 | 1 |
| BUNGALOW NO A-32 | 1 | 1 |
| BUNGALOW NO A-33 | 1 | 1 |
| BUNGALOW NO A-34 | 1 | 1 |
| BUNGALOW NO A-35 | 1 | 1 |
| BUNGALOW NO A-36 | 1 | 1 |
| BUNGALOW NO A-37 | 1 | 1 |
| BUNGALOW NO A-38 | 1 | 1 |
| BUNGALOW NO A-39 | 1 | 1 |
| BUNGALOW NO A-40 | 1 | 1 |
| BUNGALOW NO A-41 | 1 | 1 |
| BUNGALOW NO A-42 | 1 | 1 |
| BUNGALOW NO A-43 | 1 | 1 |
| BUNGALOW NO A-44 | 1 | 1 |
| BUNGALOW NO A-45 | 1 | 1 |
| BUNGALOW NO A-46 | 1 | 1 |
| BUNGALOW NO A-47 | 1 | 1 |
| BUNGALOW NO A-48 | 1 | 1 |
| BUNGALOW NO A-49 | 1 | 1 |
| BUNGALOW NO A-50 | 1 | 1 |
| BUNGALOW NO A-51 | 1 | 1 |
| BUNGALOW NO A-52 | 1 | 1 |
| BUNGALOW NO A-53 | 1 | 1 |
| BUNGALOW NO A-54 | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 10.00 cr | Rs 9.60 cr |
| BUNGALOW NO B1-01 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B1-02 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B1-03 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B1-04 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B1-05 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B1-06 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B1-07 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B1-08 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B1-09 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B2-12 | NA | Rs 1.41 cr | Rs 1.41 cr |
| BUNGALOW NO B2-13 | NA | Rs 1.41 cr | Rs 1.41 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MS DIMENSIONS ARCHITECTS PVT LTD |
| Architect | Kanahaiya Associates |
| Engineer | Structural Concept Designs Pvt Ltd |
| Engineer | Shreeji Consultants |
| Engineer | Balkrishna hrushikesh sunani |
| Chartered Accountant | Rangani and Company |
| Chartered Accountant | Sumit Talreja & Associates |
| Chartered Accountant | S.U.Radhakrishnani & co |
| Partner | Role in project |
|---|---|
| Paradise Leisure Homes | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSAI WORLD RETREAT is a residential project consisting of 54 independent Bungalow (Gr + 1) structure. The Promoter has sold 11 Bungalows which has been completed. The Architect has issued Completion certificate and Promoter has applied for Occupancy certificate in the office of Competent Authority i.e., PMRDA Pune. The balance 43 Bungalows are unsold and under construction. Since all bungalows are independent structure, the possession of sold bungalow will be handed over to the respective Allottee before date of Completion i. e. 30. 12. 2024.The Promoter is seeking one year extension for comple
Reason as filed by the promoterSai World Retreat project is consisting of 54 bungalows. Each bungalow is an independent structure and bounded by a compound wall. The Promoter has completed construction of 20 Bungalows and obtained Occupancy Certificate dated 29.04.2025 issued by the Authority PMRDA. Promoter has sold only 19 bungalows in the project till date and after obtaining part OC Possession of All sold 19 bungalows have been given to the respective allottees. The balance 34 bungalows are unsold and under construction and near to completion. The Promoter has completed the plinth work and the balance work, which is goi
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Feb 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 14 Jul 2026 |
| Form 2A (FY 2025-2026)File: SWR.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 6 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 6 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 18 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 18 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 18 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 18 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 23 Dec 2025 |
| Building plan approval or NA orderFile: NA order.pdf | 22 Dec 2025 |
| Layout approvalFile: Layout Plan.pdf | 16 Dec 2025 |
| Building plan approvalFile: Building - F.pdf | 16 Dec 2025 |
| Building plan approvalFile: Building - G.pdf | 16 Dec 2025 |
| Form 1File: Form 1.pdf | 15 Oct 2025 |
| Form 2File: Form 2.pdf | 15 Oct 2025 |
| Form 3File: Form 3.pdf | 15 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 15 Oct 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration.pdf | 15 Oct 2025 |
| Form 1File: Form 1.pdf | 11 Jul 2025 |
| Form 2File: Form 2.pdf | 11 Jul 2025 |
| Form 3File: Form 3.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory.pdf | 11 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Undertaking.pdf | 11 Jul 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A.pdf | 27 Jun 2025 |
| Form 5 (FY 2024-2025)File: FORM 5.pdf | 25 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 19 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 19 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 19 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 27122024.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 17 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 17 Jan 2025 |
| Declaration in FORM BFile: Form B.pdf | 16 Dec 2024 |
| Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf | 16 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 12 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2, Shreeji Consultants Sep.pdf | 12 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SWR Inventory.pdf | 12 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 12 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 14 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 14 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SWR (2022-2023).pdf | 10 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SWR (2023-2024).pdf | 10 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: PLH - Sai Retreat - FY 21-22.pdf | 14 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: PLH - Sai Retreat - FY 22-23.pdf | 14 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SWR (2020-2021).pdf | 30 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SWR (2021-2022).pdf | 30 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PLH Apr 21-Mar 22.pdf | 2 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PLH Apr 20-Mar 21.pdf | 1 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2_SWR.pdf | 19 Mar 2020 |
| Certificates of CA (Form 3)File: Form 3.pdf | 19 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 17 Mar 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18-19 SWR.pdf | 1 Jan 2020 |
| OtherFile: Declaration SWR.pdf | 9 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Revaildated commencement Certificate.pdf | 8 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth Certificate SWR.pdf | 6 Apr 2019 |
| Declaration in FORM BFile: Form B Paradise Leisure Homes-.pdf | 23 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1, Architect Certificate 2019.pdf | 23 Feb 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2, Engineer Certificate 2019.pdf | 23 Feb 2019 |
| Layout approvalFile: Layout Plan.pdf | 22 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 22 Feb 2019 |
| Proforma of Allotment letterFile: Declaration AFS.pdf | 22 Feb 2019 |
| Building plan approvalFile: Layout Plan.pdf | 21 Feb 2019 |
| Details of encumbrancesFile: Declaration No Encumbrances.pdf | 21 Feb 2019 |
| Building Plan Approval (IOD)File: Layout Plan.pdf | 21 Feb 2019 |
| Certificates of CA (Form 3)File: Form 3.pdf | 21 Feb 2019 |
| Proforma of Allotment letterFile: Declaration Allotment Letter.pdf | 21 Feb 2019 |
| OtherFile: Declaration Application.pdf | 21 Feb 2019 |
| Building plan approvalFile: Building Approved Plan 1.pdf | 12 Feb 2019 |
| Building plan approvalFile: Building Approved Plan 2.pdf | 12 Feb 2019 |
Promoter's earlier projects12
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sai Riverdale | Sector -7 Taloja | 244 | Completed | Oct 2017 | Jul 2017 |
| Sai Wonder | Sector 35 F | 95 | Completed | Jul 2017 | May 2017 |
| Sai Solitaire | Sector 35 H Kharghar | 83 | Completed | Jul 2017 | Jun 2017 |
| Sai Ganga | Sector 5 Ulwe | 62 | Completed | May 2017 | Jan 2017 |
| Sai Sahil | Sector 5 Ulwe Navi Mumbai | 50 | Completed | May 2017 | Apr 2017 |
| Sai Fortune | Sector- 8 Ulwe | 99 | Completed | Dec 2016 | Nov 2016 |
| Sai Crystal | Sector 35 D | 166 | Completed | Oct 2016 | Sep 2016 |
| Sai Spring | Sector 35 G Kharghar | 148 | Completed | Aug 2016 | Jul 2016 |
| Sai Miracle | Sector 35 E | 110 | Completed | Aug 2016 | Jul 2016 |
| Sai Harmony | Sector 21 Ulwe | 115 | Completed | Jul 2016 | Jul 2016 |
| Sai Moksh | sec 15 Kharghar Navi Mumbai | 73 | Completed | Aug 2015 | Jun 2015 |
| Sai Sapphire | Sector 20 Ulwe | 162 | Completed | Jul 2015 | Jul 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAI WORLD RETREAT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Behind lucky celebrity wax museum13,700+ in Pune
Filed coordinates, straight-line distance. 27 registered projects within 2 km.
CANARY FARMS
CANARY FARMS
HRIDAAN HEIGHTS
R SQUARE BUILDERS AND DEVELOPERS
Amoda Reserve - South Park
Kalpataru Properties (Thane) Private Limit
Nakshatra Valley
Hariom Sai Developers
MANTRA DIVINE PHASE 2
MANTRA UNIVERSE PRIVATE LIMITED
EMERALD VILLAS
ASHWIN ARVIND SANGHVI
Builder: Paradise Leisure Homes
Paradise Leisure Homes has 2 registrations on MahaRERA, including SAI WORLD RETREAT and SAI WORLD RETREAT. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SAI WORLD RETREAT shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAI WORLD RETREAT is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI WORLD RETREAT?
The registered promoter entity is Paradise Leisure Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI WORLD RETREAT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAI WORLD RETREAT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAI WORLD RETREAT?
The professionals named in the filing: Architect: MS DIMENSIONS ARCHITECTS PVT LTD; Architect: Kanahaiya Associates; Engineer: Structural Concept Designs Pvt Ltd; Engineer: Shreeji Consultants; Engineer: Balkrishna hrushikesh sunani; Chartered Accountant: Rangani and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI WORLD RETREAT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback