SAI WORLD EMPIRE PHASE IV

By paradisesuperstructures

RG-MH-05510 · RERA P52000051836 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 300.00 crore secured on the land, in favour of IndusInd Bank

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 12 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 8%
251 of 313Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

SAI WORLD EMPIRE PHASE IV is a Residential / Group Housing project by paradisesuperstructures in Raigarh, Maharashtra, registered with MahaRERA as P52000051836 on 7 Jul 2023. Possession is promised by 30 Dec 2029. 62 of the 313 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAI WORLD EMPIRE PHASE IV
  • TypeResidential / Group Housing
  • Location
    • CIDCO Road
    • Kharghar Sector 36
    • Rohinjan
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000051836
  • ReraGenie IDRG-MH-05510

Builder

  • Nameparadisesuperstructures
  • Entity typePartnership
  • PartnersMadhu Bhagwandas Bathija, Amit Madhu Bathija, Manish Madhu Bathija, Paradise Infracon Private Limited
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredJul 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jul 2023
  • Promised completion30 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed101 files

Current status

20%62 of 313 units booked
17.6%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower no 6 ElizabethNA55463130313

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 8%.

Tower no 6 Elizabeth: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed300

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots300
Closed/Covered300

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,596 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofIndusInd Bank
Secured amountRs 300.00 crore
CERSAI search filedYes
Declared on31 Dec 2025
LandownerVillageDistrict
Blue Circle InfratechNavi Mumbai (M Corp.)Thane
Vijay Raychand NenseeNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI37917.0
Proposed, not sanctioned37,917 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVashi Sector 17
Estimated costRs 157.67 cr
Cost incurredRs 27.76 cr
Work done17.6%
BuildingWingEstimatedIncurred
Tower no 6 ElizabethNARs 152.67 crRs 27.76 cr
-NARs 5.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHiten Sethi & Associates
EngineerMahimtura Consultants Pvt Ltd
Engineerjaichand
EngineerBharat Dave
Chartered AccountantRangani & co.
Chartered AccountantS.U.Radhakrishnani & co
PartnerRole in project
paradisesuperstructures-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2029

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: SWE PHASE IV.pdf7 May 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Form 1File: Form 1.pdf15 Oct 2025
Form 2File: Form 2.pdf15 Oct 2025
Form 3File: Form 3.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf15 Oct 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf15 Oct 2025
Form 1File: FORM 1.pdf10 Jul 2025
Form 2File: Form 2.pdf10 Jul 2025
Form 3File: Form 3.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf10 Jul 2025
Self-declaration of Quarterly ProgressFile: Undertaking.pdf10 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A.pdf27 Jun 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf24 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SWE Phase 4 Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 4 Revised.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Jan 2025
Details of encumbrances concerned to FinanceFile: SWE Phase 4.pdf7 Dec 2024
Details of encumbrances concerned to LegalFile: SWE Phase 4.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Phase 4.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 06052024.pdf6 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Letter.pdf9 Apr 2024
Copy of the legal title reportFile: legal title report.pdf17 Jun 2023
Proforma of Agreement for saleFile: AFS FINAL Phase iv.pdf17 Jun 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER iv.pdf17 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviation report Allotment letter.pdf17 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report for AFS.pdf17 Jun 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Finance.pdf12 Jun 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Legal.pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Finance.pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Legal.pdf12 Jun 2023
CERSAI detailsFile: Undertaking No Cersai.pdf12 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SWE IV Form 3.pdf30 May 2023
Layout approvalFile: Layout Plan.pdf27 May 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf27 May 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf27 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200269873323_For_Debtor_Based_Search_27_05_2023_16_45_58_877.pdf27 May 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance - Legal.pdf8 May 2023
Details of encumbrances concerned to LegalFile: No Encumbrance - Legal.pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Amit M Bathija.pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Madhu B Bathija.pdf8 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Manish M Bathija.pdf8 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A - Seperate Bank Account.pdf8 May 2023
Declaration in FORM BFile: Form B.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Apr 2023
Building plan approvalFile: 1.pdf22 Apr 2023
Building plan approvalFile: 2.pdf22 Apr 2023
Building plan approvalFile: 3.pdf22 Apr 2023
Building plan approvalFile: 4.pdf22 Apr 2023
Building plan approvalFile: 5.pdf22 Apr 2023
Building plan approvalFile: 10.pdf22 Apr 2023
Building plan approvalFile: 11.pdf22 Apr 2023
Building plan approvalFile: 12.pdf22 Apr 2023
Building plan approvalFile: 13.pdf22 Apr 2023

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sai RiverdaleSector-7 Taloja244CompletedOct 2017Jul 2017
Sai WonderSector 35 F Kharghar Navi Mumbai95CompletedJul 2017May 2017
Sai SolitaireSec 35 H Kharghar Navi Mumbai83CompletedJul 2017Jun 2016
Sai GangaSector 5 Ulwe62CompletedMay 2017Jan 2017
Sai SahilSector 5 Ulwe50CompletedMay 2017Apr 2017
Sai FortuneSector 8 Ulwe99CompletedDec 2016Nov 2016
Sai CrystalSector 35 D Kharghar Navi Mumbai166CompletedOct 2016Sep 2016
Sai SpringSector 35 G Kharghar Navi Mumbai148CompletedAug 2016Jul 2016
Sai MiracleSector 35 E Kharghar Navi Mumbai110CompletedAug 2016Jul 2016
Sai HarmonySector 21 Ulwe Navi Mumbai115CompletedJul 2016Jul 2016
Sai MokshSector 15 Kharghar Navi Mumbai73CompletedAug 2015Jun 2015
Sai SapphireSector 20 Ulwe Navi Mumbai162CompletedJul 2015Jul 2015

How this compares with Raigarh

20%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI WORLD EMPIRE PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharghar Sector 365,900+ in Raigarh

2 kmSAI WORLD EMPIRE PHASE ICompleted 21Lapsed / revoked 22Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 97 registered projects within 2 km.

Builder: paradisesuperstructures

paradisesuperstructures has 5 registrations on MahaRERA, including Sai World Empire and SAI WORLD EMPIRE PHASE II. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SAI WORLD EMPIRE PHASE IV is delayed beyond 30 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI WORLD EMPIRE PHASE IV?

The registered promoter entity is paradisesuperstructures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI WORLD EMPIRE PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI WORLD EMPIRE PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI WORLD EMPIRE PHASE IV?

The professionals named in the filing: Architect: Hiten Sethi & Associates; Engineer: Mahimtura Consultants Pvt Ltd; Engineer: jaichand; Engineer: Bharat Dave; Chartered Accountant: Rangani & co.; Chartered Accountant: S.U.Radhakrishnani & co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI WORLD EMPIRE PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI WORLD EMPIRE PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI WORLD EMPIRE PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.