Sai World Empire

By paradisesuperstructures

RG-MH-12576 · RERA P51700002446 · Last updated on MahaRERA portal: 21 Jan 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 12 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Oct 2024Possession promisedregistration recorded completed
41 of 44Construction stages doneacross 4 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
2Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

Sai World Empire is a Residential / Group Housing project by paradisesuperstructures in Raigarh, Maharashtra, registered with MahaRERA as P51700002446 on 1 Aug 2017. The registration is recorded completed; possession was promised by 29 Oct 2024. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSai World Empire
  • TypeResidential / Group Housing
  • Location
    • CIDCO ROAD
    • Rohinjan
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700002446
  • ReraGenie IDRG-MH-12576

Builder

  • Nameparadisesuperstructures
  • Entity typePartnership
  • PartnersMadhu Bhagwandas Bathija, Amit Madhu Bathija, Manish Madhu Bathija, Paradise Infracon Private Limited
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredAug 2017First promiseOct 2023Revised toOct 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Aug 2017
  • Promised completion29 Oct 2024
  • Revised completionRevised to 29 Oct 2024 (originally 30 Oct 2023)
  • Buildings4 building records
  • Documents filed118 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CEASERNA440000
ALEXANDARNA440000
NAPOLEANNA440000
CLUB HOUSENA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 21 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

41 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

CEASER99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ALEXANDAR99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NAPOLEAN99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CLUB HOUSE100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingYes80%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1151

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,151
Closed/Covered1,151
BuildingClosed/CoveredTotal
CEASER350350
ALEXANDAR441441
NAPOLEAN350350
CLUB HOUSE1010

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area33,188 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Blue Circle InfratechNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI146721.83
Proposed, not sanctioned132,522 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPrajapati House Plot no 19 New Panvel - 410206

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
paradisesuperstructures-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017681Oct 2023 → Oct 2024

Reason as filed by the promoterThe Construction work was going on as per work schedule but due to the Pandemic COVID 19 work was stopped in March 2020. Despite all efforts done by Promoter the work has got delayed due to Pandemic first and Labour Shortage later. The Promoter has sold 385 units out of total 854 units which is 45% of total units in the project therefore there was shortage of funds also, hence the Promoter has availed construction finance for faster completion of the project from Axis Finance Limited on 22.09.2022. Thereafter Construction work is going on in full speed. The Civil work has been completed and Fi

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000023615VISHNU PANDU RUPEKARparadise superstructure06/03/2018
CC12500890Shrikant Namdeo Adateparadisesuperstructures13/03/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Dec 2023

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate.pdf21 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SWE 1 (2023-2024).pdf10 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf3 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SWE OC 12122023.pdf22 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 Oct 2023
Declaration about Commencement CertificateFile: Declaration for Commencement Certificate(1).pdf7 Oct 2023
Declaration in FORM BFile: New Form B.pdf7 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A 19-20.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A New.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 new.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SWE Apr 2021- Mar 2022.pdf7 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf3 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SWE 1 (2020-2021).pdf30 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SWE 1 (2021-2022).pdf30 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - PSS - SWE Phase I- FY 20-21.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - PSS - SWE Phase I- FY 21-22.pdf26 Apr 2023
Details of encumbrancesFile: Index II IOM.pdf29 Oct 2021
Details of encumbrancesFile: Regd IOM Index II.pdf29 Oct 2021
Details of encumbrancesFile: Regd IOM Index II.pdf29 Oct 2021
Details of encumbrancesFile: ENCUMBRANCE.pdf29 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SAI WORLD EMPIRE (1).pdf2 Feb 2021
Building plan approvalFile: 1.pdf8 Oct 2020
Building plan approvalFile: 3.pdf8 Oct 2020
Building plan approvalFile: 4.pdf8 Oct 2020
Building plan approvalFile: 5.pdf8 Oct 2020
Building plan approvalFile: 6.pdf8 Oct 2020
Building plan approvalFile: 7.pdf8 Oct 2020
Building plan approvalFile: 8.pdf8 Oct 2020
Building plan approvalFile: 9.pdf8 Oct 2020
Building plan approvalFile: 10.pdf8 Oct 2020
Building plan approvalFile: 11.pdf8 Oct 2020
Building plan approvalFile: 13.pdf8 Oct 2020
Building plan approvalFile: 14.pdf8 Oct 2020
Building plan approvalFile: 15.pdf8 Oct 2020
Building plan approvalFile: 16.pdf8 Oct 2020
Building Plan Approval (IOD)File: 1.pdf8 Oct 2020
Building Plan Approval (IOD)File: 3.pdf8 Oct 2020
Building Plan Approval (IOD)File: 4.pdf8 Oct 2020
Building Plan Approval (IOD)File: 5.pdf8 Oct 2020
Building Plan Approval (IOD)File: 6.pdf8 Oct 2020
Building Plan Approval (IOD)File: 7.pdf8 Oct 2020
Building Plan Approval (IOD)File: 8.pdf8 Oct 2020
Building Plan Approval (IOD)File: 9.pdf8 Oct 2020
Building Plan Approval (IOD)File: 10.pdf8 Oct 2020
Building Plan Approval (IOD)File: 11.pdf8 Oct 2020
Building Plan Approval (IOD)File: 13.pdf8 Oct 2020
Building Plan Approval (IOD)File: 14.pdf8 Oct 2020
Building Plan Approval (IOD)File: 15.pdf8 Oct 2020
Building Plan Approval (IOD)File: 16.pdf8 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Amended CC 03022020.pdf8 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18-19 SWE.pdf31 Oct 2019
Certificates of CA (Form 5)File: Form 5 RERA SWE.pdf30 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SWE RERA Engineers Certificate.pdf30 Mar 2018
Certificates of CA (Form 3)File: SWE SEPT 17 (1).pdf30 Mar 2018
Certificates of CA (Form 3)File: SWE DEC 17 (2).pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March 2018.pdf27 Mar 2018
Details of encumbrancesFile: PARADISE SUPERSRTUCTURES.pdf26 Jul 2017
Declaration in FORM BFile: PARADISE SUPERSRTUCTURES.pdf26 Jul 2017
Certificates of CA (Form 3)File: CA certificate (2).pdf26 Jul 2017
Certificates of CA (Form 3)File: CA_Annexure- 3 SWE.pdf26 Jul 2017
Proforma of Allotment letterFile: Allotment letter- SWE -26-7-16.pdf26 Jul 2017
Layout approvalFile: SAI WORLD EMPIRE CONSTRUCTION LAY OUT PHASE -1.pdf25 Jul 2017
Building plan approvalFile: 22.pdf25 Jul 2017
Building plan approvalFile: 23.pdf25 Jul 2017
Building plan approvalFile: 21.pdf25 Jul 2017
Building plan approvalFile: 20.pdf25 Jul 2017
Building plan approvalFile: 17.pdf25 Jul 2017
Building plan approvalFile: 18.pdf25 Jul 2017
Building plan approvalFile: 19.pdf25 Jul 2017
Building plan approvalFile: 7.pdf25 Jul 2017
Building plan approvalFile: 16.pdf25 Jul 2017
Building plan approvalFile: 11.pdf25 Jul 2017
Building plan approvalFile: 12.pdf25 Jul 2017
Building plan approvalFile: 13.pdf25 Jul 2017
Building plan approvalFile: 14.pdf25 Jul 2017
Building plan approvalFile: 15.pdf25 Jul 2017
Building plan approvalFile: 8.pdf25 Jul 2017
Building plan approvalFile: 9.pdf25 Jul 2017

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sai RiverdaleSector-7 Taloja244CompletedOct 2017Jul 2017
Sai WonderSector 35 F Kharghar Navi Mumbai95CompletedJul 2017May 2017
Sai SolitaireSec 35 H Kharghar Navi Mumbai83CompletedJul 2017Jun 2016
Sai GangaSector 5 Ulwe62CompletedMay 2017Jan 2017
Sai SahilSector 5 Ulwe50CompletedMay 2017Apr 2017
Sai FortuneSector 8 Ulwe99CompletedDec 2016Nov 2016
Sai CrystalSector 35 D Kharghar Navi Mumbai166CompletedOct 2016Sep 2016
Sai SpringSector 35 G Kharghar Navi Mumbai148CompletedAug 2016Jul 2016
Sai MiracleSector 35 E Kharghar Navi Mumbai110CompletedAug 2016Jul 2016
Sai HarmonySector 21 Ulwe Navi Mumbai115CompletedJul 2016Jul 2016
Sai MokshSector 15 Kharghar Navi Mumbai73CompletedAug 2015Jun 2015
Sai SapphireSector 20 Ulwe Navi Mumbai162CompletedJul 2015Jul 2015

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai World Empire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rohinjan5,900+ in Raigarh

2 kmSai World EmpireCompleted 9Lapsed / revoked 20Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 67 registered projects within 2 km.

Builder: paradisesuperstructures

paradisesuperstructures has 5 registrations on MahaRERA, including Sai World Empire and SAI WORLD EMPIRE PHASE II. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sai World Empire is delayed beyond 29 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai World Empire?

The registered promoter entity is paradisesuperstructures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai World Empire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sai World Empire?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sai World Empire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Sai World Empire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai World Empire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai World Empire to a free account