Registered No litigation declared Residential / Group Housing project

CROSSTOWN II B WING

By TROIKA ESTATE PRIVATE LIMITED

RG-MH-17620 · RERA P51700056000 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 195.00 crore secured on the land, in favour of Kotak Mahindra Investments Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Feb 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 13%
276 of 424Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

CROSSTOWN II B WING is a Residential / Group Housing project by TROIKA ESTATE PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700056000 on 6 May 2024. Possession is promised by 1 Feb 2029. 148 of the 424 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameCROSSTOWN II B WING
  • TypeResidential / Group Housing
  • Location
    • KALYAN MURBAD ROAD
    • ULHASNAGAR 1
    • Ulhasnagar (M Corp.)
    • Ulhasnagar
    • Thane
    • 421001
  • Pincode421001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700056000
  • ReraGenie IDRG-MH-17620

Builder

  • NameTROIKA ESTATE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsRUCHIT KETAN MEHTA, RAJNIKANT SHAMALJI AJMERA, BANDISH BHOGILAL AJMERA, JAYASHREE RAMESH MEHTA, Manoj Ishawarlal Ajmera
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2024PromisedFeb 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 May 2024
  • Promised completion1 Feb 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed96 files

Current status

35%148 of 424 units booked
34.2%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 2NA382838737424

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 13%.

TOWER 2: 29% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure13%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed618

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots618
Closed/Covered1
Open Space617

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area38,359 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofKotak Mahindra Investments Limited
Secured amountRs 195.00 crore
CERSAI search filedYes
Declared on22 Jan 2026

Approvals and building plan

Sanctioning authorityulhasnagar municipal corporation
Permissible FSI31960.39
Proposed, not sanctioned31,960 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAMLA TOWER RAMBAUG LANE NO 1 SANTOSHI MATA MANDIR ROAD KALYAN WEST
Estimated costRs 92.93 cr
Cost incurredRs 31.77 cr
Work done34.19%
BuildingWingEstimatedIncurred
TOWER 2NARs 89.19 crRs 31.12 cr
-NARs 3.73 crRs 65.74 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS ENCLSOURE
ArchitectVitan Consultants
EngineerKISHOR PATIL
EngineerSandip Ganghav
EngineerSourabh Salunkhe
Chartered AccountantBSMS AND COMPANY
Chartered AccountantV PAREKH & ASSOCIATES
Chartered AccountantParmar & Associates Chartered Accountants
PartnerRole in project
TROIKA ESTATE PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Feb 2029

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Crosstown B wing.pdf1 Jul 2026
Withdrawal Update Form 1File: Architect Certificate.pdf23 Apr 2026
Withdrawal Update Form 2File: form 2.pdf23 Apr 2026
Withdrawal Update Form 3File: FORM 3 Phase II Cross town B Wing Q4 FY 2025-2026 Signed.pdf23 Apr 2026
Withdrawal Update Form 1File: Architect Certificate FORM 1.pdf21 Jan 2026
Withdrawal Update Form 2File: form 2 Engineer Certificate.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf21 Jan 2026
Form 1File: Form 1Architect Certificate -Crosstown II B WING -300925.pdf14 Nov 2025
Form 2File: signed form 2.pdf14 Nov 2025
Form 3File: FORM 3.pdf14 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold_rotated (3).pdf14 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 B Wing.pdf29 Sep 2025
Form 1File: Form 1 Architect Certificate.pdf23 Aug 2025
Form 2File: Form 2 B wing.pdf23 Aug 2025
Form 3File: FORM 3 Phase II Cross town B Wing Q1 FY 2025-2026 Signed.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf23 Aug 2025
Form 1File: Form 1 Architect Certificate.pdf3 Jul 2025
Form 2File: Form 2 Engneer certificate.pdf3 Jul 2025
Form 3File: Crosstown II B wing Form 3.pdf3 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold sign.pdf3 Jul 2025
Form 2A (FY 2024-2025)File: CROSSTOWN II B.pdf25 Jun 2025
Disclosure of sold/ booked inventoryFile: sold unsold.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B Wing (T2) CA Certificate Q3 FY 24-25- Signed.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Crosstown II B wing - 31-12-2024.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate- Phase 2- Crosstown B wing- July 24-Sept 24.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Troika Estates FORM 3 Q2 B WING FY 2024-2025 Signed.pdf30 Oct 2024
Building plan approvalFile: Approved plan 08112023_Page_10 (1) - converted.pdf30 Apr 2024
Building plan approvalFile: Approved plan 08112023_Page_13 (1) - converted.pdf30 Apr 2024
Building plan approvalFile: Approved plan 08112023_Page_14-min (1) - converted.pdf30 Apr 2024
Building plan approvalFile: Approved plan 08112023_Page_15 (1) - converted.pdf30 Apr 2024
Building plan approvalFile: Approved plan - 1 highlighted (3).pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved plan - 1 highlighted (3).pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 08112023_Page_10 (1) - converted.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 08112023_Page_13 (1) - converted.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 08112023_Page_14-min (1) - converted.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 08112023_Page_15 (1) - converted.pdf30 Apr 2024
Other - TechnicalFile: declaration for tower 2.pdf30 Apr 2024
Other - LegalFile: Release Deed-2-1-50 (1)_compressed.pdf22 Apr 2024
Other - LegalFile: Release Deed-2-51-102_compressed.pdf22 Apr 2024
Other - LegalFile: Release Deed-3-1-50_compressed.pdf22 Apr 2024
Other - LegalFile: Release Deed-3-51-106_compressed.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T2-RERA Certificate- TEPL-Kalyan 2 FORM 3-R V2 Signed.pdf19 Apr 2024
Other - LegalFile: Release Deed- 1_compressed.pdf19 Apr 2024
Building plan approvalFile: Approved plan 08112023_Page_12 (1).pdf10 Apr 2024
Building plan approvalFile: Plan 1.pdf10 Apr 2024
Building plan approvalFile: plan 3.pdf10 Apr 2024
Building plan approvalFile: Plan 2.pdf10 Apr 2024
Building plan approvalFile: plan 4.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 08112023_Page_12 (1).pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 3.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf10 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 4.pdf10 Apr 2024
Other - TechnicalFile: other technical - 2.pdf10 Apr 2024
Other - TechnicalFile: other technical - 3.pdf10 Apr 2024
Details of encumbrances concerned to FinanceFile: LegalEncumbrance 03042024.pdf8 Apr 2024
Details of encumbrances concerned to LegalFile: LegalEncumbrance 03042024.pdf8 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest RSA.pdf8 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest MIA.pdf8 Apr 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrance 03042024.pdf4 Apr 2024
Details of encumbrances concerned to LegalFile: Financial Encumbrance 03042024.pdf4 Apr 2024
Declaration in FORM BFile: form B decalration.pdf4 Apr 2024
Other - LegalFile: Form 12 Resignation.pdf4 Apr 2024
Other - LegalFile: Form 12 Appointment.pdf4 Apr 2024
Other - LegalFile: Declaration for directors resignation and appointment.pdf4 Apr 2024
Other - TechnicalFile: Other Technical- 1.pdf4 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest of JRM.pdf6 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest of RKM.pdf6 Mar 2024
Other - LegalFile: FERFAR-TROIKA PR.pdf6 Mar 2024
Other - LegalFile: merged property card.pdf6 Mar 2024
Copy of the legal title reportFile: Troika Estate Title Certificate 28-02-2024_compressed.pdf28 Feb 2024
Other - LegalFile: hIGH COURT ORDER_compressed_compressed_compressed.pdf28 Feb 2024
Other - TechnicalFile: CC Confirmation UMC.pdf28 Feb 2024
Building plan approvalFile: Approved plan 08112023-3.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 08112023-3.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Real Estate Interest Final.pdf26 Feb 2024
Building plan approvalFile: Approved plan 08112023-1 Highlighted_compressed (1).pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 08112023-1 Highlighted_compressed (1).pdf23 Feb 2024
Declaration about Commencement CertificateFile: Final CC Declaration.pdf23 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
CROSSTOWNKALYAN MURBAD ROAD ULHASNAGAR M CORP 421001518OngoingJul 2025Jul 2025

How this compares with Thane

35%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CROSSTOWN II B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ULHASNAGAR 17,600+ in Thane

2 kmCROSSTOWN II B WINGCompleted 78Lapsed / revoked 63Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 278 registered projects within 2 km.

Builder: TROIKA ESTATE PRIVATE LIMITED

TROIKA ESTATE PRIVATE LIMITED has 1 registration on MahaRERA, including CROSSTOWN II B WING. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CROSSTOWN II B WING is delayed beyond 1 Feb 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CROSSTOWN II B WING?

The registered promoter entity is TROIKA ESTATE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CROSSTOWN II B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CROSSTOWN II B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CROSSTOWN II B WING?

The professionals named in the filing: Architect: MS ENCLSOURE; Architect: Vitan Consultants; Engineer: KISHOR PATIL; Engineer: Sandip Ganghav; Engineer: Sourabh Salunkhe; Chartered Accountant: BSMS AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CROSSTOWN II B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CROSSTOWN II B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CROSSTOWN II B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.