Home / Browse projects / Pune, Maharashtra / Metro Life Bizz Bay
Metro Life Bizz Bay
RG-MH-13144 · RERA P52100022156 · Last updated on MahaRERA portal: 23 Jan 2025
Source: official MahaRERA filing
Red flags
- Litigation declared, 1 case
- 2 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Metro Life Bizz Bay is a Commercial project by RAMA SYNERGY SPACES in Pune, Maharashtra, registered with MahaRERA as P52100022156 on 4 Sep 2019. The registration is recorded completed; possession was promised by 26 Jul 2024. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameMetro Life Bizz Bay
- TypeCommercial
- Location
- New Pune Mumbai Highway
- Next to Indira College of Commerce and Science
- Tathwade
- Mulshi
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100022156
- ReraGenie IDRG-MH-13144
Builder
- NameRAMA SYNERGY SPACES
- Entity typePartnership
- PartnersRAM UDHARAM PANJABI, MANOJ RAMCHAND PANJABI, RAJKUMAR RAM PANJABI, NARESH RAMCHAND PANJABI, JITENDRA SUNDERDAS PANJABI, MOTI UDHARAM PANJABI, RONAK MOTI PANJABI, GOVIND UDHARAM PANJABI, PIYUSH GOVIND PANJABI
- Other registrations15 more →
- Completed10 of 16
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Sep 2019
- Promised completion26 Jul 2024
- Revised completionRevised to 26 Jul 2024 (originally 31 Jul 2023)
- Buildings1 building record
- Documents filed98 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BIZZ BAY | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
BIZZ BAY: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed118
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| RAMA SYNERGY SPACES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to the unavoidable circumstances beyond our control, we are few months behind the planned schedule for completion of the above said project. Therefore in lieu of the above, we humbly request you to kindly grant extension of time for possession of the above mentioned project and allow us to update the date of possession on MAHARERA website as 26th July, 2024.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 44/2018 | Honorable Civil Judge Junior Division Pimpri | Closed |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500840 | Nitin Shesherao Lokhande | RAMA SYNERGY SPACES | 11/03/2025 |
| CC12601189 | Nitin Nikam | RAMA SYNERGY SPACES | 05/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Jan 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Nov 2024
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Bizz Bay.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: BizzBay.pdf | 10 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - F Y 2023-24 - Bizz Bay.pdf | 3 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 13 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jul to Sep 2024.pdf | 13 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jul to Sep 2024.pdf | 13 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE.pdf | 13 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Jul to Sep 2024 - Bizz Bay.pdf | 13 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Metro Life Bizz Bay JULY-24.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Metro Life BizzBAy JULY-24.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Bizz Bay.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Metro Life Bizz Bay.pdf | 13 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A METRO LIFE BIZZ BAY.pdf | 13 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration reg Encumbrances - Bizzbay - Legal.pdf | 6 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration reg Encumbrances - Bizzbay - Finance.pdf | 6 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Declaration reg Encumbrances - Bizzbay - Legal.pdf | 6 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Declaration reg Encumbrances - Bizzbay - Finance.pdf | 6 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bizz Bay.pdf | 16 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Bizz Bay.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bizz Bay.pdf | 12 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: BizzBay.pdf | 11 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A METRO LIFE BIZZ BAY.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Metro Life Bizzbay.pdf | 24 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Metro Life Bizzbay.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Metro Life Bizz Bay.pdf | 22 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Metro Life Bizz Bay.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Metro Life Bizz Bay.pdf | 16 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 METRO LIFE BIZZBAY APRIL 2022 TO 31 MARCH 2023.pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 METRO LIFE BIZZBAY SEP-23 071023_11zon.pdf | 30 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Metro Life BizzBay SEPTEMBER-23.pdf | 21 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 Metro Life BizzBay SEPTEMBER-23.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Metro Life Bizzbay SEPTEMBER-23.pdf | 13 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: METRO LIFE BIZZBAY Inventory.pdf | 12 Oct 2023 |
| Layout approvalFile: 1 Layout_compressed.pdf | 25 Sep 2023 |
| Building plan approvalFile: 2 BP-LG-GF_compressed.pdf | 25 Sep 2023 |
| Building plan approvalFile: 3 1ST TO 5TH FLOOR_compressed.pdf | 25 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: 1 Layout_compressed.pdf | 25 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 BP-LG-GF_compressed.pdf | 25 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 1ST TO 5TH FLOOR_compressed.pdf | 25 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf | 25 Sep 2023 |
| Declaration about Commencement CertificateFile: Form D - Metro Life Bizz Bay.pdf | 23 Sep 2023 |
| Declaration in FORM BFile: Form B - Metor Life Bizz Bay.pdf | 23 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Mar 2022 - Metro Life Bizz Bay.pdf | 23 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Mar 2023 - Metro Life Bizz Bay.pdf | 23 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of SoldBooked Inventory - Metro Life Bizz Bay_compressed.pdf | 23 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 METRO LIFE BIZZBAY 070723.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 METRO LIFE BIZZBAY 070723.pdf | 20 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Metro Life Bizz Bay MAR-23_11zon.pdf | 5 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Metro Life Bizz Bay MAR-23.pdf | 18 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Metro Life Bizz Bay DEC-22_11zon.pdf | 16 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Metro Life Bizz Bay 031122_11zon.pdf | 3 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Metro Life Bizz Bay GE 200 Rama Synergy Spaces_001898.pdf | 28 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Metro Life Bizz Bay_11zon (2).pdf | 12 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Metro Life Bizz Bay_compressed.pdf | 23 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Metro Life Bizz Bay_11zon 140722.pdf | 14 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Metro Life Bizz Bay GE 470 Rama Synergy Spaces_001935.pdf | 28 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 METRO LIFE BIZZBAY_11zon.pdf | 27 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Metro Life Bizzbay_compressed.pdf | 14 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Metro Life Bizz Bay Arch Certificate form 1 DEC-21_compressed.pdf | 22 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Metro Life Bizz Bay Inventory DEC-21_compressed.pdf | 22 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT Dtd 31122021 METRO LIFE BIZZ BAY 11zon.pdf | 15 Jan 2022 |
| Declaration about Commencement CertificateFile: Form - D Metro Life Bizz Bay Commence ment Certificate 100122 .pdf | 13 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Bizz Bay_05012022_compressed.pdf | 12 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Metro Life Bizz Bay Form 2A DEC-22_compressed.pdf | 10 Jan 2022 |
| Details of encumbrancesFile: Metro Life Bizz Bay - Encumbrances.pdf | 24 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: METRO LIFE BIZZBAY SEP-21 INVENTORY.pdf | 21 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BizzBay- Form 1_compressed.pdf | 11 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 Metro Life Bizzbay_compressed.pdf | 9 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Rera Certificate_Bizzbay_05102021_compressed.pdf | 6 Oct 2021 |
| Declaration about Commencement CertificateFile: Form - D Metro life Bizz Bay.pdf | 21 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Metro Life Bizzbay - Inventory_compressed.pdf | 21 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: METRO LIFE BIZZ BAY Form 2A_11zon.pdf | 20 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bizz Bay_FORM 3 Compressed.pdf | 11 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Rera Certificate Bizz Bay 14 04 2021.pdf | 29 Apr 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RSS Metro Life Bizz Bay.PDF | 23 Jan 2021 |
| Layout approvalFile: Layout Plan.pdf | 4 Jan 2020 |
| Building plan approvalFile: Floor Plan.pdf | 4 Jan 2020 |
| Building plan approvalFile: Floor Plan 1.pdf | 4 Jan 2020 |
| Building plan approvalFile: Floor Plan 2.pdf | 4 Jan 2020 |
Promoter's earlier projects13
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Fusion Towers Phase IVP52100049419 | Hinjewadi Phase III, Pune | 175 | Feb 2023 | Ongoing | Dec 2025 | Not delivered |
| FUSION TOWERS PHASE IIIP52100049215 | Hinjewadi Phase III, Pune | 91 | Feb 2023 | Ongoing | Jul 2025 | Not delivered |
| Celestial City Phase II Building I, J, KP52100028977 | S No 86, Ravet Aundh Road, Near Expressway, Ravet, MH, Pune | 162 | Apr 2021 | Ongoing | Jun 2024 | Not delivered |
| Metro Life Maxima Residences Phase IIP52100023984 | Next to Indira College of Commerce and Science, Pune | 275 | Jan 2020 | Completed | Dec 2023 | Late, Jul 2024 |
| Metro Life Optima ResidencesP52100026255 | Next to Indira College of Commerce and Science, Pune | 199 | Sep 2020 | Ongoing | Sep 2023 | Not delivered |
| METRO LIFE MAXIMA RESIDENCES PHASE IP52100022178 | Next to Indira College of Commerce and Science, Pune | 276 | Sep 2019 | Completed | Jul 2023 | Late, Mar 2024 |
| Celestial City Phase II Building A, E, HP52100022487 | S No 78 P and 86/2 P, Ravet Aundh Road, Near Expressway, Ravet, Pimpri Chichwad, Pune, MH, Pune | 141 | Sep 2019 | Completed | Mar 2023 | Late, Feb 2024 |
| MELANGE RESIDENCES - PHASE IVP52100025451 | Hinjawadi Phase III, Pune | 110 | May 2020 | Completed | Dec 2022 | Late, May 2023 |
| FUSION TOWERS PHASE IIP52100019797 | Hinjawadi - Phase III, Pune | 110 | Mar 2019 | Completed | Dec 2022 | Late, May 2024 |
| MELANGE RESIDENCES - PHASE IIIP52100017090 | Hinjawadi Phase III, Pune | 110 | Jul 2018 | Completed | Sep 2021 | Late, May 2023 |
| FUSION TOWERS PHASE IP52100018013 | Hinjawadi - Phase III, Pune | 220 | Oct 2018 | Completed | Jun 2021 | Late, Aug 2023 |
| MELANGE RESIDENCES - PHASE IIP52100003047 | Hinjawadi Phase III, Pune | 220 | Aug 2017 | Completed | Jun 2019 | Late, Jul 2019 |
| MELANGE RESIDENCES - PHASE I | MIDC Phase III Main Rd Phase 3 Hinjewadi Rajiv Gandhi Infotech Park Hinjawadi Pimpri-Chinchwad Maharashtra 411057 | 330 | - | Completed | Dec 2018 | Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 15 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
Keep Metro Life Bizz Bay on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Next to Indira College of Commerce and Science13,700+ in Pune
Filed coordinates, straight-line distance. 262 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: RAMA SYNERGY SPACES
RAMA SYNERGY SPACES has 16 registrations on MahaRERA, including MELANGE RESIDENCES - PHASE I and MELANGE RESIDENCES - PHASE II. Its filings disclose 14 earlier MahaRERA projects: declares 1 of 10 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Metro Life Bizz Bay is delayed beyond 26 Jul 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Metro Life Bizz Bay?
The registered promoter entity is RAMA SYNERGY SPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Metro Life Bizz Bay?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Metro Life Bizz Bay?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Metro Life Bizz Bay?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Metro Life Bizz Bay?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback