Home / Browse projects / Pune, Maharashtra / MELANGE RESIDENCES - PHASE IV

Completed No litigation declared Residential / Group Housing project

MELANGE RESIDENCES - PHASE IV

By RAMA SYNERGY SPACES

RG-MH-16258 · RERA P52100025451 · Last updated on MahaRERA portal: 3 Dec 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Installation of Lifts, 90%
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

MELANGE RESIDENCES - PHASE IV is a Residential / Group Housing project by RAMA SYNERGY SPACES in Pune, Maharashtra, registered with MahaRERA as P52100025451 on 30 May 2020. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameMELANGE RESIDENCES - PHASE IV
  • TypeResidential / Group Housing
  • Location
    • MIDC Main Road
    • Hinjawadi Phase III
    • Bhoirwadi
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100025451
  • ReraGenie IDRG-MH-16258

Builder

  • NameRAMA SYNERGY SPACES
  • Entity typePartnership
  • PartnersRAM UDHARAM PANJABI, MANOJ RAMCHAND PANJABI, RAJKUMAR RAM PANJABI, NARESH RAMCHAND PANJABI, JITENDRA SUNDERDAS PANJABI, MOTI UDHARAM PANJABI, RONAK MOTI PANJABI, GOVIND UDHARAM PANJABI, PIYUSH GOVIND PANJABI
  • Other registrations15 more →
  • Completed10 of 16
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredMay 2020PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 May 2020
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

G: 95% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities17

As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
PodiumYes75%
Entrance GateYes100%

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Open Space48

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,984 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7400.0
Proposed, not sanctioned6,808 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMaratha Chambers, Plot No 3, SDC, Sec 25, Bhel Chowk Road, Nigdi, Pune 411044

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhikalpan Architects
ArchitectVK:a Architecture
EngineerG A Bhilare Consultants Pvt. ltd
Chartered AccountantAnkush M Patil & Co
Chartered AccountantL. B. Laddha & Co
PartnerRole in project
RAMA SYNERGY SPACES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013116Dec 2022 → Dec 2023

Reason as filed by the promoterWe hereby submit that due to the unavoidable circumstances beyond our control, we are few months behind the planned schedule for completion of the above said project. Therefore in lieu of the above, we humbly request you to kindly grant extension of time for possession.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 May 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 May 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 May 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 May 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Dec 2023

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - F Y 2023-24 - Melange Ph-IV.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MELANGE RESIDENCES PH-IV.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: Melange Residences Ph-IV.pdf11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A MELANGE RESIDENCES PH-IV.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Melange Residences Phase IV.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Melange Residences Ph-IV.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MELANGE RESIDENCES PH-4 1 April 2022 to 31 March 2023.pdf9 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Melange Residences Ph-IV G Bldg 100 percent task completed.pdf7 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Melange Residences Ph-3 and 4 230518 - Full Completion Certificate - (Bldg F and G).pdf7 Dec 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Melange Residences Ph-III F Bldg.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Melange Residences Ph-4 SEPTEMBER-23.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Melange Residences Ph-4 SEPTEMBER-23.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: MELANGE RESIDENCES PH-4 Inventory.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Melange Residences Ph-IV MAR-23.pdf18 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Melange Residences Ph-IV_11zon.pdf24 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Melange Residences Ph-IV DEC-22_11zon.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Melange Residences Ph-Iv GE 199 Rama Synergy Spaces_001896.pdf28 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MELANGE RESIDENCES PH-IV_11zon.pdf11 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Melange Residences Ph-IV_compressed.pdf23 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Melange Residences Ph-IV GE 469 Rama Synergy Spaces_001934.pdf28 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Melange Residences Ph- 4 G bldg_compressed.pdf14 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Melange Residences Ph-IV DEC-21_compressed.pdf27 Jan 2022
Disclosure of sold/ booked inventoryFile: Melange Residences Ph-IV Inventory DEC-21_compressed.pdf22 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Melange Residences Ph-IV G Bldg DEC-21_compressed.pdf11 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MELANGE RESIDENCES PH-IV Arch CertIficate Form 1 DEC-21_compressed.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: MELANGE RESIDENCES PH-IV SEP-21 INVENTORY.pdf21 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Rera Certificate_Melange Residences Ph-IV 121021.pdf13 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Melange - Phase IV- Form 1_compressed.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 Melange Residences Phase-IV_compressed.pdf9 Oct 2021
Declaration about Commencement CertificateFile: Form - D Melange Residences Phase 4 G bldg 150921.pdf15 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: MELANGE RESIDENCES PH-IV_11zon.pdf20 Aug 2021
Disclosure of sold/ booked inventoryFile: Melange Reisdences Ph-IV Inventory-min.pdf19 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Melange Phase IV G 300621.pdf11 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Melange Form 3- PH IV 10 06 2021.pdf25 Jun 2021
Layout approvalFile: Sanction Layout_compressed.pdf28 May 2020
Building plan approvalFile: Building Plan 3.pdf28 May 2020
Building plan approvalFile: Building Plan 1 Final.pdf28 May 2020
Building plan approvalFile: Building Plan 2 Final.pdf28 May 2020
Copy of the legal title reportFile: Melange Residences Title certificate.pdf28 May 2020
Details of encumbrancesFile: Declaration encumbrances.pdf28 May 2020
Copy of Layout Approval (in case of layout)File: Sanction Layout_compressed.pdf28 May 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf28 May 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1 Final.pdf28 May 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2 Final.pdf28 May 2020
Commencement Certificates / NA Order for plotted developmentFile: REVISED Commencment Certificate Dtd 20 Aug 2019_compressed.pdf28 May 2020
Declaration in FORM BFile: Declaration Form B.pdf28 May 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Melange G bldg.pdf28 May 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Melange Phase IV 12 May 2020.pdf28 May 2020
Proforma of Allotment letterFile: Allotment Letter draft.pdf28 May 2020

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise8 delivered late4 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Fusion Towers Phase IVP52100049419Hinjewadi Phase III, Pune175Feb 2023OngoingDec 2025Not delivered
FUSION TOWERS PHASE IIIP52100049215Hinjewadi Phase III, Pune91Feb 2023OngoingJul 2025Not delivered
Celestial City Phase II Building I, J, KP52100028977S No 86, Ravet Aundh Road, Near Expressway, Ravet, MH, Pune162Apr 2021OngoingJun 2024Not delivered
Metro Life Maxima Residences Phase IIP52100023984Next to Indira College of Commerce and Science, Pune275Jan 2020CompletedDec 2023Late, Jul 2024
Metro Life Optima ResidencesP52100026255Next to Indira College of Commerce and Science, Pune199Sep 2020OngoingSep 2023Not delivered
Metro Life Bizz BayP52100022156Next to Indira College of Commerce and Science, Pune179Sep 2019CompletedJul 2023Late, Jul 2024
METRO LIFE MAXIMA RESIDENCES PHASE IP52100022178Next to Indira College of Commerce and Science, Pune276Sep 2019CompletedJul 2023Late, Mar 2024
Celestial City Phase II Building A, E, HP52100022487S No 78 P and 86/2 P, Ravet Aundh Road, Near Expressway, Ravet, Pimpri Chichwad, Pune, MH, Pune141Sep 2019CompletedMar 2023Late, Feb 2024
FUSION TOWERS PHASE IIP52100019797Hinjawadi - Phase III, Pune110Mar 2019CompletedDec 2022Late, May 2024
MELANGE RESIDENCES - PHASE IIIP52100017090Hinjawadi Phase III, Pune110Jul 2018CompletedSep 2021Late, May 2023
FUSION TOWERS PHASE IP52100018013Hinjawadi - Phase III, Pune220Oct 2018CompletedJun 2021Late, Aug 2023
MELANGE RESIDENCES - PHASE IIP52100003047Hinjawadi Phase III, Pune220Aug 2017CompletedJun 2019Late, Jul 2019
MELANGE RESIDENCES - PHASE IMIDC Phase III Main Rd Phase 3 Hinjewadi Rajiv Gandhi Infotech Park Hinjawadi Pimpri-Chinchwad Maharashtra 411057330-CompletedDec 2018Dec 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MELANGE RESIDENCES - PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjawadi Phase III13,700+ in Pune

2 kmMELANGE RESIDENCES - PHACompleted 1Lapsed / revoked 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: RAMA SYNERGY SPACES

RAMA SYNERGY SPACES has 16 registrations on MahaRERA, including MELANGE RESIDENCES - PHASE I and MELANGE RESIDENCES - PHASE II. Its filings disclose 14 earlier MahaRERA projects: declares 1 of 10 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MELANGE RESIDENCES - PHASE IV is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MELANGE RESIDENCES - PHASE IV?

The registered promoter entity is RAMA SYNERGY SPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MELANGE RESIDENCES - PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MELANGE RESIDENCES - PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MELANGE RESIDENCES - PHASE IV?

The professionals named in the filing: Architect: Abhikalpan Architects; Architect: VK:a Architecture; Engineer: G A Bhilare Consultants Pvt. ltd; Chartered Accountant: Ankush M Patil & Co; Chartered Accountant: L. B. Laddha & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MELANGE RESIDENCES - PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MELANGE RESIDENCES - PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MELANGE RESIDENCES - PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.