Home / Browse projects / Pune, Maharashtra / FUSION TOWERS PHASE II

Completed No litigation declared Residential / Group Housing project

FUSION TOWERS PHASE II

By RAMA SYNERGY SPACES

RG-MH-03469 · RERA P52100019797 · Last updated on MahaRERA portal: 3 Dec 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • 2 extensions taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
3 of 110Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

FUSION TOWERS PHASE II is a Residential / Group Housing project by RAMA SYNERGY SPACES in Pune, Maharashtra, registered with MahaRERA as P52100019797 on 5 Mar 2019. The registration is recorded completed; possession was promised by 30 Dec 2022. 107 of the 110 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameFUSION TOWERS PHASE II
  • TypeResidential / Group Housing
  • Location
    • MIDC Main Road
    • Hinjawadi - Phase III
    • Bhoirwadi
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019797
  • ReraGenie IDRG-MH-03469

Builder

  • NameRAMA SYNERGY SPACES
  • Entity typePartnership
  • PartnersRAM UDHARAM PANJABI, MANOJ RAMCHAND PANJABI, RAJKUMAR RAM PANJABI, NARESH RAMCHAND PANJABI, JITENDRA SUNDERDAS PANJABI, MOTI UDHARAM PANJABI, RONAK MOTI PANJABI, GOVIND UDHARAM PANJABI, PIYUSH GOVIND PANJABI
  • Other registrations15 more →
  • Completed10 of 16
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredMar 2019PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Mar 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed135 files

Current status

97%107 of 110 units booked
99.8%Work done, per cost certificate

Figures as on 3 Dec 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building - CNA1701100110

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

Building - C: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes90%
Community BuildingsYes85%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes40%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes30%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Open Space25

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,848 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI6262.3
Proposed, not sanctioned5,962 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMaratha Chambers, Plot No 3, SDC, Sector 25, Bhel Chowk Road, Nigdi, Pune - 411044
Estimated costRs 26.41 cr
Cost incurredRs 26.35 cr
Work done99.8%
BuildingWingEstimatedIncurred
Building - CNARs 23.77 crRs 23.77 cr
-NARs 2.64 crRs 2.59 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmit Bhat Architects
ArchitectVKa architecture
EngineerJ.W. Consultants LLP
EngineerAkshay Nigade
Chartered AccountantL. B. Laddha & Co
Chartered AccountantMadhusudan Jhanwar
PartnerRole in project
RAMA SYNERGY SPACES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024361Dec 2022 → Sep 2024

Reason as filed by the promoterDue to unavoidable circumstances beyond our control, the Completion Certificate received from Authority was dated 10th May, 2024 i.e. a couple of months after our project completion date of 30th December, 2023. Therefore, applying for the extension.

EXT52100012665Dec 2022 → Dec 2023

Reason as filed by the promoterDue to the unavoidable circumstances beyond our control, we are few months behind the planned schedule for completion of the above said project. Therefore in lieu of the above, we humbly request you to kindly grant extension of time for possession of the said project.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000310541Shashank TiwariM/S RAMA SYNERGY SPACES03/03/2024
CC12502941Shashank TiwariRAMA SYNERGY SPACES21/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Oct 2024

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - F Y 2023-24 - Fusion Ph-II.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Jul to Sep 2024 - Fusion Ph-II.pdf21 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Fusion Ph-II.pdf21 Oct 2024
Certificates of CA (Form 3)File: Form 3 - Jul to Sep 2024 - Fusion Ph-II.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jul to Sep 2024 - Fusion Ph-II.pdf21 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate - Fusion Ph-II.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Jul to Sep 2024 - Fusion Ph-II.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Mar'2021.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Jun'2021.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sep'2021.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec'2021.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Mar'2022.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Jun'2022.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sep'2022.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec'2022.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Mar'2023.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Jun'2023.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sep'2023.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec'2023.pdf8 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Mar'2021.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Jun'2021.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sep'2021.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec'2021.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Mar'2022.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Jun'2022.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sep'2022.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec'2022.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Mar'2023.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Jun'2023.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sep'2023.pdf7 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec'2023.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar'2021.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jun'2021.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep'2021.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec'2021.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar'2022.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jun'2022.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep'2022.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec'2022.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mar'2023.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jun'2023.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep'2023.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Dec'2023.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jun'2024.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - 2021-22.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2022-23.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Mar'2021.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Jun'2021.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Sep'2021.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Dec'2021.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Mar'2022.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Jun'2022.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Sep'2022.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Dec'2022.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Mar'2023_compressed.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Jun'2023.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 - Sep'2023.pdf7 Aug 2024
Certificates of CA (Form 3)File: Form 3 -Dec'2023.pdf7 Aug 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate legal.pdf31 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrances Certificate legal.pdf31 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organisations Fusion Towers Ph-II_compressed.p31 Jul 2024
Proforma of Agreement for saleFile: Fusion Towers Phase II Agreement For Sale PDF.pdf31 Jul 2024
Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment Letter.pdf31 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report For Agreement For sale.pdf31 Jul 2024
Declaration in FORM BFile: Form B.pdf26 Jul 2024
Certificates of CA (Form 3)File: Fusion Towers Ph-II.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fusion Towers Ph-II.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Fusion Towers Ph-II.pdf15 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Fusion Towers Ph-II.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FUSION TOWERS PH-II.pdf13 Jul 2024
Certificates of CA (Form 3)File: Fusion Tower Ph-II.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fusion Ph-II.pdf15 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Fusion Tower Ph-II.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: Fusion Towers Ph-II.pdf11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FUSION TOWERS PH-II.pdf5 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Fusion Towers Phase II.pdf24 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Fusion Towers Phase II.pdf23 Jan 2024
Certificates of CA (Form 3)File: Form 3 - Fusion Towers Phase II.pdf23 Jan 2024
Certificates of CA (Form 3)File: Form 3 - Krystal One Phase II.pdf22 Jan 2024
Disclosure of sold/ booked inventoryFile: Fusion Towers Phase II.pdf20 Jan 2024

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise8 delivered late4 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Fusion Towers Phase IVP52100049419Hinjewadi Phase III, Pune175Feb 2023OngoingDec 2025Not delivered
FUSION TOWERS PHASE IIIP52100049215Hinjewadi Phase III, Pune91Feb 2023OngoingJul 2025Not delivered
Celestial City Phase II Building I, J, KP52100028977S No 86, Ravet Aundh Road, Near Expressway, Ravet, MH, Pune162Apr 2021OngoingJun 2024Not delivered
Metro Life Maxima Residences Phase IIP52100023984Next to Indira College of Commerce and Science, Pune275Jan 2020CompletedDec 2023Late, Jul 2024
Metro Life Optima ResidencesP52100026255Next to Indira College of Commerce and Science, Pune199Sep 2020OngoingSep 2023Not delivered
Metro Life Bizz BayP52100022156Next to Indira College of Commerce and Science, Pune179Sep 2019CompletedJul 2023Late, Jul 2024
METRO LIFE MAXIMA RESIDENCES PHASE IP52100022178Next to Indira College of Commerce and Science, Pune276Sep 2019CompletedJul 2023Late, Mar 2024
Celestial City Phase II Building A, E, HP52100022487S No 78 P and 86/2 P, Ravet Aundh Road, Near Expressway, Ravet, Pimpri Chichwad, Pune, MH, Pune141Sep 2019CompletedMar 2023Late, Feb 2024
MELANGE RESIDENCES - PHASE IVP52100025451Hinjawadi Phase III, Pune110May 2020CompletedDec 2022Late, May 2023
MELANGE RESIDENCES - PHASE IIIP52100017090Hinjawadi Phase III, Pune110Jul 2018CompletedSep 2021Late, May 2023
FUSION TOWERS PHASE IP52100018013Hinjawadi - Phase III, Pune220Oct 2018CompletedJun 2021Late, Aug 2023
MELANGE RESIDENCES - PHASE IIP52100003047Hinjawadi Phase III, Pune220Aug 2017CompletedJun 2019Late, Jul 2019
MELANGE RESIDENCES - PHASE IMIDC Phase III Main Rd Phase 3 Hinjewadi Rajiv Gandhi Infotech Park Hinjawadi Pimpri-Chinchwad Maharashtra 411057330-CompletedDec 2018Dec 2018

How this compares with Pune

97%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FUSION TOWERS PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjawadi - Phase III13,700+ in Pune

2 kmFUSION TOWERS PHASE IICompleted 34Lapsed / revoked 9Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: RAMA SYNERGY SPACES

RAMA SYNERGY SPACES has 16 registrations on MahaRERA, including MELANGE RESIDENCES - PHASE I and MELANGE RESIDENCES - PHASE II. Its filings disclose 14 earlier MahaRERA projects: declares 1 of 10 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if FUSION TOWERS PHASE II is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FUSION TOWERS PHASE II?

The registered promoter entity is RAMA SYNERGY SPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FUSION TOWERS PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against FUSION TOWERS PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for FUSION TOWERS PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FUSION TOWERS PHASE II?

The professionals named in the filing: Architect: Amit Bhat Architects; Architect: VKa architecture; Engineer: J.W. Consultants LLP; Engineer: Akshay Nigade; Chartered Accountant: L. B. Laddha & Co; Chartered Accountant: Madhusudan Jhanwar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FUSION TOWERS PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FUSION TOWERS PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FUSION TOWERS PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.