FUSION TOWERS PHASE III

By RAMA SYNERGY SPACES

RG-MH-39497 · RERA P52100049215 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 3 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 85.00 crore secured on the land, in favour of Bajaj Housing Finance Limited

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
5 of 11Construction stages donefurthest along: Staircases, 98%
6 of 91Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

FUSION TOWERS PHASE III is a Residential / Group Housing project by RAMA SYNERGY SPACES in Pune, Maharashtra, registered with MahaRERA as P52100049215 on 3 Feb 2023. Possession was promised by 30 Jul 2026 and is now 3 months past that date. The completion date has moved by 12 months from the original filing. 85 of the 91 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameFUSION TOWERS PHASE III
  • TypeResidential / Group Housing
  • Location
    • MIDC Main road
    • Hinjewadi Phase III
    • Bhoirwadi
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049215
  • ReraGenie IDRG-MH-39497

Builder

  • NameRAMA SYNERGY SPACES
  • Entity typePartnership
  • PartnersRAM UDHARAM PANJABI, MANOJ RAMCHAND PANJABI, RAJKUMAR RAM PANJABI, NARESH RAMCHAND PANJABI, JITENDRA SUNDERDAS PANJABI, MOTI UDHARAM PANJABI, RONAK MOTI PANJABI, GOVIND UDHARAM PANJABI, PIYUSH GOVIND PANJABI
  • Other registrations15 more →
  • Completed10 of 16
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

3 months past promisethis monthRegisteredFeb 2023First promiseJul 2025Revised toJul 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Feb 2023
  • Promised completion30 Jul 2026
  • Revised completionRevised to 30 Jul 2026 (originally 31 Jul 2025)
  • Buildings1 building record
  • Documents filed151 files

Current status

93%85 of 91 units booked
98.0%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building - FNA1111791291

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

Building - F: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises18%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.52%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes60%
Street LightingYes10%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed130

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots130
Closed/Covered8
Open Space122

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area21,026 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBajaj Housing Finance Limited
Secured amountRs 85.00 crore
CERSAI search filedYes
Declared on20 May 2025

Approvals and building plan

Permissible FSI6329.48
Proposed, not sanctioned6,329 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 3 8, Ground Floor, F Wing, Premier Plaza, Old Mumbai-Pune Highway, Chinchwad, Pune-411019
Estimated costRs 19.28 cr
Cost incurredRs 18.90 cr
Work done98.0%
BuildingWingEstimatedIncurred
Building - FNARs 15.42 crRs 15.15 cr
-NARs 3.86 crRs 3.74 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVKa Architecture
EngineerAjit Kolekar
EngineerAkshay Nigade
EngineerDeepali Vilas Phulpagar
Chartered AccountantMadhusudan Jhanwar
Chartered AccountantL. B. Laddha & Co
PartnerRole in project
RAMA SYNERGY SPACES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24052501254Jul 2025 → Jul 2026

Reason as filed by the promoterDue to unavoidable circumstances beyond our control, the project is few months behind the planned schedule for completion

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600347Sunil Madhukar ShirudeRama synergy spaces (Mr Moti Udharam Panjabi)18/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Fusion Ph-III - Form 1 (signed).pdf18 Jul 2026
Withdrawal Update Form 2File: Fusion Ph-III - Form 2 (signed).pdf18 Jul 2026
Withdrawal Update Form 3File: Fusion Ph-III - Form 3 (signed).pdf18 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form 1 - FT Ph-III (signed).pdf20 Jun 2026
Withdrawal Update Form 2File: Withdrawal Application Form 2 - FT Ph-III (signed).pdf20 Jun 2026
Withdrawal Update Form 3File: Withdrawal Application Form 3 (signed).pdf20 Jun 2026
Withdrawal Update Form 1File: Withdrawal Application Form 1 - FT Ph-III (signed).pdf29 May 2026
Withdrawal Update Form 2File: Fusion Ph-III - Form 2 (signed).pdf29 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form 3 - FT Ph-III (signed).pdf29 May 2026
Form 2A (FY 2025-2026)File: Fusion Ph-III - Form 2A (signed).pdf5 May 2026
Form 5 (FY 2024-2025)File: Form 5 - F Y 2024-25 - Fusion Towers Ph-III.pdf23 Apr 2026
Withdrawal Update Form 1File: Fusion Ph-III - Form 1 (signed).pdf18 Apr 2026
Withdrawal Update Form 2File: Fusion Ph-III - Form 2 (signed).pdf18 Apr 2026
Withdrawal Update Form 3File: Fusion Ph-III - Form 3 (signed).pdf18 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 - FT Ph-III.pdf12 Mar 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 - FT Ph-III.pdf12 Mar 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 - FT Ph-III.pdf12 Mar 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 - FT Ph-III (signed).pdf11 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 - FT Ph-III (signed).pdf11 Feb 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 - FT Ph-III (signed).pdf11 Feb 2026
Withdrawal Update Form 1File: Fusion Ph-III - Form 1 (signed).pdf14 Jan 2026
Withdrawal Update Form 2File: Fusion Ph-III - Form 2 (signed).pdf14 Jan 2026
Withdrawal Update Form 3File: Fusion Ph-III - Form 3 (signed).pdf14 Jan 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 - FT Ph-III (signed).pdf13 Dec 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 - FT Ph-III (signed).pdf13 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 - FT Ph-III (signed).pdf13 Dec 2025
Withdrawal Update Form 1File: Fusion Ph-III - Form 1 (signed).pdf20 Oct 2025
Withdrawal Update Form 2File: Fusion Ph-III - Form 2 (signed).pdf20 Oct 2025
Withdrawal Update Form 3File: Fusion Ph-III - Form 3 (signed).pdf20 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 - FT Ph-III (signed).pdf27 Sep 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 - FT Ph-III (signed).pdf27 Sep 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 - FT Ph-III (signed).pdf27 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 - F Y 2023-24 - Fusion Ph-III.pdf25 Aug 2025
Withdrawal Update Form 1File: Fusion Ph-III - Form 1 (signed).pdf23 Aug 2025
Withdrawal Update Form 1File: Fusion Ph-III - Form 1 (signed).pdf23 Aug 2025
Withdrawal Update Form 2File: Fusion Ph-III - Form 2 (signed).pdf23 Aug 2025
Withdrawal Update Form 2File: Fusion Ph-III - Form 2 (signed).pdf23 Aug 2025
Withdrawal Update Form 3File: Fusion Ph-III - Form 3 (signed).pdf23 Aug 2025
Withdrawal Update Form 3File: Fusion Ph-III - Form 3 (signed).pdf23 Aug 2025
Form 2A (FY 2024-2025)File: Fusion Ph-III - Form 2A (signed).pdf16 Jul 2025
Form 1File: Fusion Ph-III.pdf31 May 2025
Withdrawal Update Form 1File: Form 1 (Mahacriti).pdf29 May 2025
Withdrawal Update Form 2File: Fusion Towers Ph-III.pdf29 May 2025
Withdrawal Update Form 3File: Fusion Towers Ph-III.pdf29 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fusion Ph-III.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fusion Ph-III.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fusion Ph-III.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fusion Ph-III.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fusion Ph-III.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fusion Ph-III.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fusion Ph-III.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fusion Ph-III.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fusion Ph-III.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fusion Ph-III.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fusion Ph-III.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fusion Ph-III.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: Fusion Towers Ph-III.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Fusion Towers Ph-III.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: Fusion Towers Ph-III.pdf9 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - F Y 2023-24 - Fusion Ph-III.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - F Y 2023-24 - Fusion Ph-III.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - F Y 2023-24 - Fusion Ph-III.pdf27 Nov 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf25 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf25 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fusion Ph-III.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fusion Ph-III.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Fusion Ph-III.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fusion Ph-III.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fusion Ph-III.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fusion Ph-III.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fusion Ph-III.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Fusion Ph-III.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fusion Ph-III.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Fusion Ph-III.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fusion Ph-III.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Fusion Ph-III.pdf18 Oct 2024
Details of encumbrances concerned to FinanceFile: Declaration reg Encumbrances - Fusion Ph-III - Finance (cs of mortgage deed).pdf7 Oct 2024
Details of encumbrances concerned to LegalFile: Declaration reg Encumbrances - Fusion Ph-III - Finance (cs of mortgage deed).pdf7 Oct 2024
Details of encumbrances concerned to LegalFile: Declaration reg Encumbrances - Fusion Ph-III - Legal (cs of mortgage deed).pdf7 Oct 2024

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise9 delivered late3 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Fusion Towers Phase IVP52100049419Hinjewadi Phase III, Pune175Feb 2023OngoingDec 2025Not delivered
Celestial City Phase II Building I, J, KP52100028977S No 86, Ravet Aundh Road, Near Expressway, Ravet, MH, Pune162Apr 2021OngoingJun 2024Not delivered
Metro Life Maxima Residences Phase IIP52100023984Next to Indira College of Commerce and Science, Pune275Jan 2020CompletedDec 2023Late, Jul 2024
Metro Life Optima ResidencesP52100026255Next to Indira College of Commerce and Science, Pune199Sep 2020OngoingSep 2023Not delivered
Metro Life Bizz BayP52100022156Next to Indira College of Commerce and Science, Pune179Sep 2019CompletedJul 2023Late, Jul 2024
METRO LIFE MAXIMA RESIDENCES PHASE IP52100022178Next to Indira College of Commerce and Science, Pune276Sep 2019CompletedJul 2023Late, Mar 2024
Celestial City Phase II Building A, E, HP52100022487S No 78 P and 86/2 P, Ravet Aundh Road, Near Expressway, Ravet, Pimpri Chichwad, Pune, MH, Pune141Sep 2019CompletedMar 2023Late, Feb 2024
MELANGE RESIDENCES - PHASE IVP52100025451Hinjawadi Phase III, Pune110May 2020CompletedDec 2022Late, May 2023
FUSION TOWERS PHASE IIP52100019797Hinjawadi - Phase III, Pune110Mar 2019CompletedDec 2022Late, May 2024
MELANGE RESIDENCES - PHASE IIIP52100017090Hinjawadi Phase III, Pune110Jul 2018CompletedSep 2021Late, May 2023
FUSION TOWERS PHASE IP52100018013Hinjawadi - Phase III, Pune220Oct 2018CompletedJun 2021Late, Aug 2023
MELANGE RESIDENCES - PHASE IIP52100003047Hinjawadi Phase III, Pune220Aug 2017CompletedJun 2019Late, Jul 2019
MELANGE RESIDENCES - PHASE IMIDC Phase III Main Rd Phase 3 Hinjewadi Rajiv Gandhi Infotech Park Hinjawadi Pimpri-Chinchwad Maharashtra 411057330-CompletedDec 2018Dec 2018

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FUSION TOWERS PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi Phase III13,700+ in Pune

2 kmFUSION TOWERS PHASE IIICompleted 34Lapsed / revoked 8Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: RAMA SYNERGY SPACES

RAMA SYNERGY SPACES has 16 registrations on MahaRERA, including MELANGE RESIDENCES - PHASE I and MELANGE RESIDENCES - PHASE II. Its filings disclose 14 earlier MahaRERA projects: declares 1 of 10 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that FUSION TOWERS PHASE III shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if FUSION TOWERS PHASE III is delayed beyond 30 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FUSION TOWERS PHASE III?

The registered promoter entity is RAMA SYNERGY SPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FUSION TOWERS PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against FUSION TOWERS PHASE III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for FUSION TOWERS PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FUSION TOWERS PHASE III?

The professionals named in the filing: Architect: VKa Architecture; Engineer: Ajit Kolekar; Engineer: Akshay Nigade; Engineer: Deepali Vilas Phulpagar; Chartered Accountant: Madhusudan Jhanwar; Chartered Accountant: L. B. Laddha & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FUSION TOWERS PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FUSION TOWERS PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FUSION TOWERS PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.