Completed No litigation declared Residential / Group Housing project

FUSION TOWERS PHASE I

By RAMA SYNERGY SPACES

RG-MH-58042 · RERA P52100018013 · Last updated on MahaRERA portal: 3 Dec 2024

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2021Possession promisedregistration recorded completed
21 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
3Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

FUSION TOWERS PHASE I is a Residential / Group Housing project by RAMA SYNERGY SPACES in Pune, Maharashtra, registered with MahaRERA as P52100018013 on 3 Oct 2018. The registration is recorded completed; possession was promised by 30 Jun 2021. 3 complaints are on record with the regulator.

At a glance

Project

  • NameFUSION TOWERS PHASE I
  • TypeResidential / Group Housing
  • Location
    • MIDC Main Road
    • Hinjawadi - Phase III
    • Bhoirwadi
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018013
  • ReraGenie IDRG-MH-58042

Builder

  • NameRAMA SYNERGY SPACES
  • Entity typePartnership
  • PartnersRAM UDHARAM PANJABI, MANOJ RAMCHAND PANJABI, RAJKUMAR RAM PANJABI, NARESH RAMCHAND PANJABI, JITENDRA SUNDERDAS PANJABI, MOTI UDHARAM PANJABI, RONAK MOTI PANJABI, GOVIND UDHARAM PANJABI, PIYUSH GOVIND PANJABI
  • Other registrations15 more →
  • Completed10 of 16
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects14 →

Key dates

this monthRegisteredOct 2018PromisedJun 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Oct 2018
  • Promised completion30 Jun 2021
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building - ANA160000
Building - BNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building - A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building - B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Open Space78
BuildingOpen SpaceTotal
Building - A5353
Building - B2525

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,410 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12512.89
Proposed, not sanctioned11,913 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMaratha Chambers, Plot No 3, SDC, Sector 25, Bhel Chowk Road, Nigdi, Pune - 411044

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMIT BHAT ARCHITECTS
ArchitectVKa ARCHITECTURE
EngineerJW CONSULTANTS LLP
PartnerRole in project
RAMA SYNERGY SPACES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009890Jun 2021 → Jun 2022

Reason as filed by the promoterWith due respect, we would like to explain that the recent wave of covid-19 has disrupted the development of our under construction project. Also, supply chains for obtaining construction material has been distinctively challenging to us. Furthermore, to add on to these crucial circumstances, the exodus of labor to their natives has adversely impacted the pace of construction & scheduled work plan.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC005000000228373Vishal TripathiRama Group23/02/2023
CC005000000279725-Rama Group13/11/2023
CC12502274Aaditya agrawalRAMA SYNERGY SPACES06/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Sep 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Oct 2023

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - F Y 2023-24 - Fusion Ph-I.pdf3 Dec 2024
Disclosure of sold/ booked inventoryFile: Fusion Towers Ph-I.pdf11 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FUSION TOWERS PH-I.pdf5 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 FusionTowers Ph-I A B Bldg 08122023.pdf27 Mar 2024
Disclosure of sold/ booked inventoryFile: Fusion Towers Phase I.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FusionTowers Ph-I A - B Bldg 100 percent Task.pdf13 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Fusion Towers Ph-I Annual Report.pdf16 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Fusion Towers Ph-I B Bldg 240824 - Part Completion Certificate - Bldg -B.pdf21 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Fusion Towers Ph-I SEPTEMBER-23.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Fusion Towers Ph-I SEPTEMBER-23.pdf13 Oct 2023
Disclosure of sold/ booked inventoryFile: FUSION TOWERS PH-I Inventory.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FUSION TOWERS PH-I 070723.pdf20 Jul 2023
Certificates of CA (Form 3)File: Form 3 FUSION TOWERS PH-I 070723_3_11zon.pdf20 Jul 2023
Certificates of CA (Form 3)File: Form 3 Fusion Towers Ph-I MAR-23_11zon.pdf5 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Fusion Towers Ph-I.pdf18 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Fusion Towers Ph-I DEC-22_11zon.pdf16 Jan 2023
Certificates of CA (Form 3)File: Form 3 Fusion Towers Ph-I DEC-22_11zon.pdf16 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 221018 - Part Complition Certificate - A Bldg Fusion Towers Ph-I.pdf26 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Fusion Towers Ph-I GE 196 Rama Synergy Spaces_001893.pdf28 Oct 2022
Layout approvalFile: Revised Layout Plan Fusion Towers_rotated_11zon.pdf17 Oct 2022
Copy of Layout Approval (in case of layout)File: Revised Layout Plan Fusion Towers_rotated_11zon.pdf17 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate - Fusion Towers_11zon.pdf17 Oct 2022
Certificates of CA (Form 3)File: Form 3 Fusion Towers Ph-I_11zon.pdf12 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FUSION TOWERS PH-I_11zon.pdf11 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Fusion Towers Ph-I_compressed.pdf23 Jul 2022
Certificates of CA (Form 3)File: Form 3 Fusion Towers Ph-I_11zon 140722.pdf14 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Fusion Towers Ph-I GE 466 Rama Synergy Spaces_001931.pdf28 Apr 2022
Certificates of CA (Form 3)File: FORM 3 FUSION TOWERS PH-I_11zon.pdf27 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Fusion Towers ph-I A B bldg compressed.pdf14 Apr 2022
Disclosure of sold/ booked inventoryFile: Fusion Towers Ph-I Inventory DEC-21.pdf22 Jan 2022
Certificates of CA (Form 3)File: Form-3_Fusion Tower PH-1_05012022_compressed.pdf12 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Fusion Towers Ph-I AB Form 2A DEC-22_compressed.pdf10 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FUSION TOWERS PH-I Arch CertIficate Form 1 DEC-21_compressed.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: FUSION TOWERS PH-I SEP-21 INVENTORY.pdf21 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Fusion Tower - Phase I_compressed.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 Fusion Tower Phase-I_compressed.pdf9 Oct 2021
Certificates of CA (Form 3)File: CA Rera Certificate_Fusion Tower PH-I_05102021.pdf8 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FUSION TOWERS PH-I_11zon.pdf20 Aug 2021
Disclosure of sold/ booked inventoryFile: Fusion Towers ph-I Inventory-min_11zon.pdf19 Aug 2021
Certificates of CA (Form 3)File: FUSION TOWER PH I.pdf11 Aug 2021
Declaration about Commencement CertificateFile: Form D Final 16 06 2021.pdf18 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FT I Form 2A final.pdf16 Jun 2021
Disclosure of sold/ booked inventoryFile: Fusion Towers Ph I - Inventory_compressed.pdf16 Jun 2021
Disclosure of sold/ booked inventoryFile: Inventory 31 05 2021.pdf16 Jun 2021
Certificates of CA (Form 3)File: Form 3 Fusion tower Ph I 02 06 2021.pdf16 Jun 2021
OtherFile: Fusion Towers Ph I Format D.pdf16 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - FUSION PHASE I A and B Building Feb 2021.pdf6 Feb 2021
Certificates of CA (Form 3)File: FORM 3 FUSION 1 DT 4 02 21.PDF6 Feb 2021
Certificates of CA (Form 3)File: Fusion Tower Ph1 Form 03 05 01 2021.pdf30 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RSS Fusion Tower Ph I.PDF23 Jan 2021
Form 2AFile: Fusion Towers A and B.pdf26 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Fusion Tower Ph I.pdf4 Nov 2019
Form 2AFile: FORM 2A BUILDING A and B.pdf19 Jun 2019
Layout approvalFile: 1st Sheet.pdf17 Sep 2018
Copy of the legal title reportFile: Title Report dt 15 09 18.pdf17 Sep 2018
Copy of Layout Approval (in case of layout)File: 1st Sheet.pdf17 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: CC 1628 01 08 18.pdf17 Sep 2018
Certificates of CA (Form 3)File: 1st Rera.pdf17 Sep 2018
Building plan approvalFile: Declaration IOD.pdf15 Sep 2018
Details of encumbrancesFile: No Encumbrances Certificate.pdf15 Sep 2018
Building Plan Approval (IOD)File: Declaration IOD.pdf15 Sep 2018
Declaration in FORM BFile: Form B.pdf15 Sep 2018
Proforma of Allotment letterFile: Agreement draft letter.pdf15 Sep 2018

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise8 delivered late4 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Fusion Towers Phase IVP52100049419Hinjewadi Phase III, Pune175Feb 2023OngoingDec 2025Not delivered
FUSION TOWERS PHASE IIIP52100049215Hinjewadi Phase III, Pune91Feb 2023OngoingJul 2025Not delivered
Celestial City Phase II Building I, J, KP52100028977S No 86, Ravet Aundh Road, Near Expressway, Ravet, MH, Pune162Apr 2021OngoingJun 2024Not delivered
Metro Life Maxima Residences Phase IIP52100023984Next to Indira College of Commerce and Science, Pune275Jan 2020CompletedDec 2023Late, Jul 2024
Metro Life Optima ResidencesP52100026255Next to Indira College of Commerce and Science, Pune199Sep 2020OngoingSep 2023Not delivered
Metro Life Bizz BayP52100022156Next to Indira College of Commerce and Science, Pune179Sep 2019CompletedJul 2023Late, Jul 2024
METRO LIFE MAXIMA RESIDENCES PHASE IP52100022178Next to Indira College of Commerce and Science, Pune276Sep 2019CompletedJul 2023Late, Mar 2024
Celestial City Phase II Building A, E, HP52100022487S No 78 P and 86/2 P, Ravet Aundh Road, Near Expressway, Ravet, Pimpri Chichwad, Pune, MH, Pune141Sep 2019CompletedMar 2023Late, Feb 2024
MELANGE RESIDENCES - PHASE IVP52100025451Hinjawadi Phase III, Pune110May 2020CompletedDec 2022Late, May 2023
FUSION TOWERS PHASE IIP52100019797Hinjawadi - Phase III, Pune110Mar 2019CompletedDec 2022Late, May 2024
MELANGE RESIDENCES - PHASE IIIP52100017090Hinjawadi Phase III, Pune110Jul 2018CompletedSep 2021Late, May 2023
MELANGE RESIDENCES - PHASE IIP52100003047Hinjawadi Phase III, Pune220Aug 2017CompletedJun 2019Late, Jul 2019
MELANGE RESIDENCES - PHASE IMIDC Phase III Main Rd Phase 3 Hinjewadi Rajiv Gandhi Infotech Park Hinjawadi Pimpri-Chinchwad Maharashtra 411057330-CompletedDec 2018Dec 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FUSION TOWERS PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjawadi - Phase III13,700+ in Pune

2 kmFUSION TOWERS PHASE ICompleted 33Lapsed / revoked 9Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: RAMA SYNERGY SPACES

RAMA SYNERGY SPACES has 16 registrations on MahaRERA, including MELANGE RESIDENCES - PHASE I and MELANGE RESIDENCES - PHASE II. Its filings disclose 14 earlier MahaRERA projects: declares 1 of 10 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if FUSION TOWERS PHASE I is delayed beyond 30 Jun 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FUSION TOWERS PHASE I?

The registered promoter entity is RAMA SYNERGY SPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FUSION TOWERS PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against FUSION TOWERS PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for FUSION TOWERS PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FUSION TOWERS PHASE I?

The professionals named in the filing: Architect: AMIT BHAT ARCHITECTS; Architect: VKa ARCHITECTURE; Engineer: JW CONSULTANTS LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FUSION TOWERS PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FUSION TOWERS PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FUSION TOWERS PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.