VENUS
By Persipina Developers Private Limited
RG-MH-20292 · RERA P52000001518 · Last updated on MahaRERA portal: 4 Nov 2024
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 25 completed earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VENUS is a Residential / Group Housing project by Persipina Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000001518 on 28 Jul 2017. The registration is recorded completed; possession was promised by 30 Apr 2023. 1 complaint is on record with the regulator.
At a glance
Project
- NameVENUS
- TypeResidential / Group Housing
- Location
- Bhokarpada
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000001518
- ReraGenie IDRG-MH-20292
Builder
- NamePersipina Developers Private Limited
- Entity typeCompany
- CINU45200MH2007PTC172099
- GSTIN27AAECP3315L1ZC
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorsNiranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani
- Other registrations37 more →
- Completed19 of 38
- Declared earlier projects41 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Jul 2017
- Promised completion30 Apr 2023
- Revised completionNone
- Buildings1 building record
- Documents filed139 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VENUS | NA | 38 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
VENUS: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed314
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gunisha Sethi Sanyal |
| Engineer | MAHIMTURA CONSULTANTS PRIVATE LIMITED |
| Partner | Role in project |
|---|---|
| Persipina Developers Private Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000141203 | Santosh Kumar and Ms Jyoti Anand | Persipina Developers Pvt Ltd | 08/10/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Oct 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Oct 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Nov 2024
Documents filed139
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 01 main sheet rera.pdf | 4 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 02 P-01 rera.pdf | 4 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 03 StiltGround floor rera.pdf | 4 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 05 P-02 rera.pdf | 4 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 06 P-03 rera.pdf | 4 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 09 Venus and Orion Terrace floor_rera.pdf | 4 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 10 Venus and Orion Stilt P-1_rera.pdf | 4 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 11 Venus and Orion P-2 P-3_rera.pdf | 4 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13 Venus Typical_rera.pdf | 4 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 14 Venus Section Elevation_rera.pdf | 4 Nov 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: VENUS'.pdf | 20 Mar 2024 |
| Certificates of CA (Form 5)File: FORM 5 VENUS.pdf | 2 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 VENUS.pdf | 2 Feb 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architects Ceritificate VENUS BUILDING.pdf | 4 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sector C Final OC.pdf | 3 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F 1 ARCHITECT CERT VENUS.pdf | 3 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA 2 Engg Venus.pdf | 3 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A)File: RERA 2A Venus.pdf | 3 Jun 2022 |
| Certificates of CA (Form 3)File: CA RERA Venus.pdf | 3 Jun 2022 |
| Certificates of CA (Form 5)File: FORM-5 Venus 21.pdf | 7 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 Venus 21.pdf | 7 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT VENUS.pdf | 24 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER VENUS.pdf | 24 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A)File: ENG CER FORM 2A VENUS.pdf | 24 Jan 2022 |
| Certificates of CA (Form 3)File: Venus CA Cert.pdf | 24 Jan 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Venus.pdf | 13 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT VENUS.pdf | 16 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Venus Engineer Certificate.pdf | 16 Jul 2021 |
| Certificates of CA (Form 3)File: C A Cert Venus.pdf | 16 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VENUS Arch Cere.pdf | 26 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Venus RERA Certificate Form 2 Engineers Certificate (1).pdf | 26 Feb 2021 |
| Certificates of CA (Form 3)File: Venus CA Cer.pdf | 26 Feb 2021 |
| Certificates of CA (Form 5)File: Venus Form 5.pdf | 18 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Venus Form 5.pdf | 18 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT RETAIL.pdf | 8 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Retail C Engineers Certificate.pdf | 8 Dec 2020 |
| Certificates of CA (Form 3)File: CA CER Retail C.pdf | 8 Dec 2020 |
| Proforma of Allotment letterFile: Agreement for Sale - Venus.pdf | 15 Jul 2020 |
| Details of Restarting of Construction work post lockdownFile: VENUS merged.pdf | 3 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT VENUS.pdf | 18 Apr 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Venus Eng Cert.pdf | 18 Apr 2020 |
| Certificates of CA (Form 3)File: VENUS CA CER.pdf | 18 Apr 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VENUS ARCHI CERTI.pdf | 20 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VENUS ENGI CERTI FORM 2.pdf | 20 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: VENUS ENGI CERTI FORM 2A.pdf | 20 Jan 2020 |
| Certificates of CA (Form 3)File: VENUS CA CERTI.pdf | 20 Jan 2020 |
| Certificates of CA (Form 3)File: VENUS CA CERTI.pdf | 27 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Venus Arc Cert.pdf | 20 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Venus Engg Cert.pdf | 20 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: VENUS FORM 5.pdf | 20 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VENUS ARCHI CERTI.pdf | 30 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VENUS ENGI CERTI.pdf | 30 Aug 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: VENUS QUALITY CERTI.pdf | 30 Aug 2019 |
| Certificates of CA (Form 3)File: VENUS CA CERTI.pdf | 30 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: VENUS ARCHI CERTI.pdf | 15 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VENUS ENG CERTI.pdf | 15 Jun 2019 |
| Certificates of CA (Form 3)File: VENUS CA CERTI.pdf | 15 Jun 2019 |
| Proforma of Allotment letterFile: Agreement for Sale.pdf | 15 Jun 2019 |
| OtherFile: Denotification Order.pdf | 15 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Venus.pdf | 25 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VENUS ENGI CERTI.pdf | 25 Jan 2019 |
| Certificates of CA (Form 3)File: VENUS C A CERTI.pdf | 25 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Venus Archi Certi.pdf | 3 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Venus Engi Certi.pdf | 3 Nov 2018 |
| Certificates of CA (Form 3)File: Venus CA Certi.pdf | 3 Nov 2018 |
| Certificates of CA (Form 5)File: Venus Form 5.pdf | 2 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Venus Archi Certi.pdf | 25 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Venus Engi Certi.pdf | 25 Jul 2018 |
| Certificates of CA (Form 3)File: Venus C A Certi.pdf | 25 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Venus Archi Certi.pdf | 20 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Venus Engi Certi.pdf | 20 Apr 2018 |
| Certificates of CA (Form 3)File: Venus C A Certi.pdf | 20 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Venus Arch Certificate.pdf | 20 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Venus Engg Certificate.pdf | 20 Jan 2018 |
| Certificates of CA (Form 3)File: Venus CA Certificate.pdf | 20 Jan 2018 |
| Layout approvalFile: LAYOUT BUILDINGS.pdf | 17 Oct 2017 |
| Layout approvalFile: LAYOUT PODIUM 1.pdf | 17 Oct 2017 |
| Layout approvalFile: LAYOUT PODIUM 2.pdf | 17 Oct 2017 |
| Layout approvalFile: LAYOUT PODIUM 3.pdf | 17 Oct 2017 |
| Layout approvalFile: LAYOUT STILT.pdf | 17 Oct 2017 |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PavilionPR1270002501589 | Village Khalapur, Raigarh | 160 | Nov 2025 | Ongoing | Jun 2032 | Not due yet |
| GrandstandPR1270002501603 | Village Khalapur, Raigarh | 313 | Nov 2025 | Ongoing | Jun 2032 | Not due yet |
| AtheleticaPR1270002501610 | Village Khalapur, Raigarh | 160 | Nov 2025 | Ongoing | Jun 2032 | Not due yet |
| GreenfieldP52000080098 | Panvel, Raigarh | 320 | Apr 2025 | Ongoing | Dec 2031 | Not due yet |
| CitadelP52000080155 | Panvel, Raigarh | 160 | May 2025 | Ongoing | Dec 2031 | Not due yet |
| AsterP52000055662 | Village Bhokarpada, Raigarh | 144 | Apr 2024 | Ongoing | Dec 2031 | Not due yet |
| ArcadiaP52000080195 | Village Khalapur, Raigarh | 160 | May 2025 | Ongoing | Dec 2031 | Not due yet |
| MAYFLOWERP52000054617 | Village Bhokarpada, Raigarh | 144 | Feb 2024 | Ongoing | Dec 2029 | Not due yet |
| MARIGOLDP52000054616 | Village Bhokarpada, Raigarh | 30 | Feb 2024 | Ongoing | Dec 2029 | Not due yet |
| LAVENDERP52000054615 | Village Bhokarpada, Raigarh | 144 | Feb 2024 | Ongoing | Dec 2029 | Not due yet |
| EbonyP52000080165 | Village Bhokarpada, Raigarh | 178 | May 2025 | Ongoing | Dec 2029 | Not due yet |
| OrchidP52000050193 | Village Bhokarpada, Raigarh | 288 | Mar 2023 | Ongoing | Dec 2028 | Not due yet |
| IrisP52000050194 | Village Bhokarpada, Raigarh | 144 | Mar 2023 | Ongoing | Dec 2028 | Not due yet |
| EMPRESS HILL A B C and D WingsP51800052633 | Hiranandani Gardens Powai, Mumbai Suburban | 359 | Sep 2023 | Ongoing | Dec 2028 | Not due yet |
| AcaciaP52000050196 | village Bhokarapada, Raigarh | 288 | Mar 2023 | Ongoing | Dec 2028 | Not due yet |
| HIGHLAND A B C D AND E WingP51800029948 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2021 | Completed | Dec 2026 | Mar 2025 |
| REGENT HILL A B C D AND E WINGP51800018620 | HIRANANDANI GARDENS POWAI, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2025 | Apr 2022 |
| SorrentoP51800021706 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2019 | Completed | Dec 2024 | Jun 2022 |
| Castle Rock C and D WingP51800000405 | Hiranandani Gardens, Powai., Mumbai Suburban | - | Jul 2017 | Completed | Dec 2023 | Jun 2023 |
| ZeusP52000001064 | Bhokarpada, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| VestaP52000001078 | Bhokarpada, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| OrionP52000002990 | Bhokarpada, Raigarh | - | Aug 2017 | Completed | Apr 2023 | Sep 2022 |
| HeraP52000001513 | Panvel, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| ARTEMISP52000001381 | Panvel, Raigarh | - | Jul 2017 | Completed | Apr 2023 | May 2021 |
| SeleneP52000002730 | Bhokarpada, Raigarh | - | Aug 2017 | Completed | Mar 2023 | May 2021 |
| FloraP52000001514 | Panvel, Raigarh | - | Jul 2017 | Completed | Mar 2023 | May 2021 |
| Retail CP52000001411 | Panvel, Raigarh | - | Jul 2017 | Completed | Mar 2022 | May 2021 |
| Retail AP52000000436 | PANVEL, Raigarh | - | Jul 2017 | Completed | Dec 2021 | Jul 2019 |
| HeliosP52000000261 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| AuroraP52000000256 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| AuraP52000000263 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| ArgusP52000000265 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| MellonaP52000000260 | PANVEL, Raigarh | - | Jul 2017 | Completed | Oct 2020 | Jul 2019 |
| ClioP52000000184 | PANVEL, Raigarh | - | Jul 2017 | Completed | Oct 2020 | Jul 2019 |
| MinervaP52000000284 | PANVEL, Raigarh | - | Jul 2017 | Completed | Sep 2020 | Jul 2019 |
| HermesP52000000267 | PANVEL, Raigarh | - | Jul 2017 | Completed | Feb 2020 | Jul 2019 |
| AtlasP52000000262 | Panvel, Raigarh | - | Jul 2017 | Completed | Feb 2020 | Jul 2019 |
| Atlantis C WingP51800000143 | Hiranandani Gardens , Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Feb 2019 |
| Atlantis A and B WingP51800000154 | Hiranandani Gardens, Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Mar 2018 |
| Apollo and Athena | Survey No. 58-2 Part Village Bhokarpada Taluka Panvel District Raigad Maharashtra | 130 | - | Completed | Dec 2017 | Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 37 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 139 filed documents as one ZIP, foldered, with a manifest
Keep VENUS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhokarpada5,900+ in Raigarh
Filed coordinates, straight-line distance. 484 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Persipina Developers Private Limited
Persipina Developers Private Limited has 38 registrations on MahaRERA, including Atlas and Aurora. Its filings disclose 41 earlier MahaRERA projects: declares 26 of 26 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if VENUS is delayed beyond 30 Apr 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VENUS?
The registered promoter entity is Persipina Developers Private Limited, a company as per the filing. Its CIN U45200MH2007PTC172099 and GSTIN 27AAECP3315L1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VENUS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VENUS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VENUS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VENUS?
The professionals named in the filing: Architect: Gunisha Sethi Sanyal; Engineer: MAHIMTURA CONSULTANTS PRIVATE LIMITED. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VENUS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback