ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Ebony

Registered No litigation declared Others project

Ebony

By Persipina Developers Private Limited

RG-MH-31841 · RERA P52000080165 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 26 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 37 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
35 of 178Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Ebony is a Others project by Persipina Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000080165 on 2 May 2025. Possession is promised by 31 Dec 2029. 143 of the 178 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameEbony
  • TypeOthers
  • Location
    • Old Mumbai Pune Highway NH 04
    • Village Bhokarpada
    • Bhokarpada
    • Panvel
    • Raigarh
    • 410221
  • Pincode410221
  • RERA no.P52000080165
  • ReraGenie IDRG-MH-31841

Builder

  • NamePersipina Developers Private Limited
  • Entity typeCompany
  • CINU45200MH2007PTC172099
  • GSTIN27AAECP3315L1ZC
  • Managing DirectorsNiranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani
  • Other registrations37 more →
  • Completed19 of 38
  • Declared earlier projects41 →

Key dates

this monthRegisteredMay 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

80%143 of 178 units booked
1.7%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EbonyNA19160178178

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Ebony: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed207

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots207
Closed/Covered207

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area900 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025

Approvals and building plan

Sanctioning authorityMaharashtra State Road Development Corporation Ltd. (MSRDC)
Permissible FSI14211.52
Proposed, not sanctioned14,212 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Galleria Shopping Mall, Hiranandani Gardens, Powai, Mumbai.400076
Estimated costRs 135.00 cr
Cost incurredRs 2.35 cr
Work done1.74%
BuildingWingEstimatedIncurred
EbonyNARs 130.00 crRs 2.15 cr
-NARs 5.00 crRs 20.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGunisha Sanyal
ArchitectGunisha Sethi Sanyal
EngineerEr. Prashanth N.
Chartered AccountantManoj O. Shah & CO
Chartered AccountantArun P Vaz & Co
PartnerRole in project
Persipina Developers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARC CER EBONY.pdf15 Apr 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE EBONY.pdf15 Apr 2026
Withdrawal Update Form 3File: FORM-3 Mar 2026 EBONY.pdf15 Apr 2026
Withdrawal Update Form 1File: Architect Certificate - Ebony.pdf20 Jan 2026
Withdrawal Update Form 1File: Architect Certificate - Ebony.pdf20 Jan 2026
Withdrawal Update Form 1File: Architect Certificate - Ebony.pdf20 Jan 2026
Withdrawal Update Form 2File: Eng Certificate Ebony.pdf20 Jan 2026
Withdrawal Update Form 2File: Eng Certificate Ebony.pdf20 Jan 2026
Withdrawal Update Form 2File: Eng Certificate Ebony.pdf20 Jan 2026
Withdrawal Update Form 3File: CA CER EBONY.pdf20 Jan 2026
Withdrawal Update Form 3File: CA CER EBONY.pdf20 Jan 2026
Withdrawal Update Form 3File: CA CER EBONY.pdf20 Jan 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE - EBONY.pdf27 Jul 2025
Form 2File: ENGINEER ' S CERTIFICATE EBONY JUNE 2025.pdf27 Jul 2025
Form 3File: CA CER SECTOR D Ebony RV1.pdf27 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD BOOKED EBONY.pdf27 Jul 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS Ebony.pdf2 May 2025
Proforma of Agreement for saleFile: Draft AFS Ebony.pdf2 May 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS Ebony.pdf2 May 2025
Proforma of Agreement for saleFile: Draft AFS Ebony.pdf2 May 2025
Layout approvalFile: FULL LAYOUT PLAN.pdf25 Apr 2025
Layout approvalFile: Plan 4 -14.pdf25 Apr 2025
Layout approvalFile: 3RD FLOOR PLAN _HOSPITAL 8-14.pdf25 Apr 2025
Layout approvalFile: TERRACE AND LMR LEVEL PLAN 11-14.pdf25 Apr 2025
Layout approvalFile: SECTIONS13-14.pdf25 Apr 2025
Layout approvalFile: Scan-14-14.pdf25 Apr 2025
Copy of Layout Approval (in case of layout)File: FULL LAYOUT PLAN.pdf25 Apr 2025
Copy of Layout Approval (in case of layout)File: Plan 4 -14.pdf25 Apr 2025
Copy of Layout Approval (in case of layout)File: 3RD FLOOR PLAN _HOSPITAL 8-14.pdf25 Apr 2025
Copy of Layout Approval (in case of layout)File: TERRACE AND LMR LEVEL PLAN 11-14.pdf25 Apr 2025
Copy of Layout Approval (in case of layout)File: SECTIONS13-14.pdf25 Apr 2025
Copy of Layout Approval (in case of layout)File: Scan-14-14.pdf25 Apr 2025
Other - LegalFile: Registered Sale Certificate Panvel.pdf25 Apr 2025
Other - TechnicalFile: Letter Dec Ebony.pdf24 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report ASF Ebony.pdf24 Apr 2025
Proforma of Agreement for saleFile: Draft AFS Ebony.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate (Form 3).pdf23 Apr 2025
Declaration about Commencement CertificateFile: FORMAT-D EBONY.pdf21 Apr 2025
Proforma of Allotment letterFile: Allotment Letter Ebony.pdf17 Apr 2025
Deviation Report with respect to Allotment letterFile: Deviation Letter Allotment Letter Ebony.pdf17 Apr 2025
Other - TechnicalFile: LH NEW undertaking EBONY 1.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG RERA Certificate - EBONY.pdf16 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT- A Seprate Account EBONY.pdf16 Apr 2025
Other - TechnicalFile: Ebony - Development layout.pdf16 Apr 2025
Other - TechnicalFile: Ebony_Car parking Letter.pdf16 Apr 2025
Other - TechnicalFile: Self Decl Area ARC EBONY.pdf16 Apr 2025
Other - TechnicalFile: Ebony email.pdf16 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK LETTER FORMAT- B EBONY.pdf16 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: secured_unsecured finance EBONY.pdf16 Apr 2025
Building plan approvalFile: 2 BASEMENT 01 (PARKING NO'S).pdf14 Apr 2025
Building plan approvalFile: 3 BASEMENT-2.pdf14 Apr 2025
Building plan approvalFile: 5 GROUND FLOOR _RETAIL.pdf14 Apr 2025
Building plan approvalFile: 6 FLOOR PLAN _RETAIL.pdf14 Apr 2025
Building plan approvalFile: 7 FLOOR PLAN HOSPITAL.pdf14 Apr 2025
Building plan approvalFile: 8 FLOOR PLAN _HOSPITAL.pdf14 Apr 2025
Building plan approvalFile: 9 TYPICAL FLOOR PLAN_OFFICES.pdf14 Apr 2025
Building plan approvalFile: 10 REFUGE FLOOR PLAN.pdf14 Apr 2025
Building plan approvalFile: 12 SECTION.pdf14 Apr 2025
PAN CardFile: PAN Card PDPL.pdf14 Apr 2025
Copy of the legal title reportFile: EA 06 Final Title Certificat.pdf14 Apr 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE DECLARATION EBONY.pdf14 Apr 2025
Declaration in FORM BFile: Form B AFFIDAVIT EBONY.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ebony_1 FORM 1 Architect Certificate.pdf14 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Ebony - Commencement certificate.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 12 SECTION.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 10 REFUGE FLOOR PLAN.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 9 TYPICAL FLOOR PLAN_OFFICES.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 8 FLOOR PLAN _HOSPITAL.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 FLOOR PLAN _RETAIL.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5 GROUND FLOOR _RETAIL.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 BASEMENT-2.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 BASEMENT 01 (PARKING NO'S).pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 7 FLOOR PLAN HOSPITAL.pdf14 Apr 2025
Other - LegalFile: EA 06 7-12.pdf14 Apr 2025
Other - LegalFile: PDPL BR.pdf14 Apr 2025
CERSAI detailsFile: CERSAI CER EBONY.pdf14 Apr 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION EBONY.pdf14 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSER NLH EBONY.pdf14 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE KNH.pdf14 Apr 2025

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

26 delivered on promise14 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PavilionPR1270002501589Village Khalapur, Raigarh160Nov 2025OngoingJun 2032Not due yet
GrandstandPR1270002501603Village Khalapur, Raigarh313Nov 2025OngoingJun 2032Not due yet
AtheleticaPR1270002501610Village Khalapur, Raigarh160Nov 2025OngoingJun 2032Not due yet
GreenfieldP52000080098Panvel, Raigarh320Apr 2025OngoingDec 2031Not due yet
CitadelP52000080155Panvel, Raigarh160May 2025OngoingDec 2031Not due yet
AsterP52000055662Village Bhokarpada, Raigarh144Apr 2024OngoingDec 2031Not due yet
ArcadiaP52000080195Village Khalapur, Raigarh160May 2025OngoingDec 2031Not due yet
MAYFLOWERP52000054617Village Bhokarpada, Raigarh144Feb 2024OngoingDec 2029Not due yet
MARIGOLDP52000054616Village Bhokarpada, Raigarh30Feb 2024OngoingDec 2029Not due yet
LAVENDERP52000054615Village Bhokarpada, Raigarh144Feb 2024OngoingDec 2029Not due yet
OrchidP52000050193Village Bhokarpada, Raigarh288Mar 2023OngoingDec 2028Not due yet
IrisP52000050194Village Bhokarpada, Raigarh144Mar 2023OngoingDec 2028Not due yet
EMPRESS HILL A B C and D WingsP51800052633Hiranandani Gardens Powai, Mumbai Suburban359Sep 2023OngoingDec 2028Not due yet
AcaciaP52000050196village Bhokarapada, Raigarh288Mar 2023OngoingDec 2028Not due yet
HIGHLAND A B C D AND E WingP51800029948HIRANANDANI GARDENS, POWAI, Mumbai Suburban-Jul 2021CompletedDec 2026Mar 2025
REGENT HILL A B C D AND E WINGP51800018620HIRANANDANI GARDENS POWAI, Mumbai Suburban-Nov 2018CompletedJun 2025Apr 2022
SorrentoP51800021706HIRANANDANI GARDENS, POWAI, Mumbai Suburban-Jul 2019CompletedDec 2024Jun 2022
Castle Rock C and D WingP51800000405Hiranandani Gardens, Powai., Mumbai Suburban-Jul 2017CompletedDec 2023Jun 2023
ZeusP52000001064Bhokarpada, Raigarh-Jul 2017CompletedApr 2023Sep 2022
VestaP52000001078Bhokarpada, Raigarh-Jul 2017CompletedApr 2023Sep 2022
VENUSP52000001518Bhokarpada, Raigarh-Jul 2017CompletedApr 2023Sep 2022
OrionP52000002990Bhokarpada, Raigarh-Aug 2017CompletedApr 2023Sep 2022
HeraP52000001513Panvel, Raigarh-Jul 2017CompletedApr 2023Sep 2022
ARTEMISP52000001381Panvel, Raigarh-Jul 2017CompletedApr 2023May 2021
SeleneP52000002730Bhokarpada, Raigarh-Aug 2017CompletedMar 2023May 2021
FloraP52000001514Panvel, Raigarh-Jul 2017CompletedMar 2023May 2021
Retail CP52000001411Panvel, Raigarh-Jul 2017CompletedMar 2022May 2021
Retail AP52000000436PANVEL, Raigarh-Jul 2017CompletedDec 2021Jul 2019
HeliosP52000000261PANVEL, Raigarh-Jul 2017CompletedNov 2020Jul 2019
AuroraP52000000256PANVEL, Raigarh-Jul 2017CompletedNov 2020Jul 2019
AuraP52000000263PANVEL, Raigarh-Jul 2017CompletedNov 2020Jul 2019
ArgusP52000000265PANVEL, Raigarh-Jul 2017CompletedNov 2020Jul 2019
MellonaP52000000260PANVEL, Raigarh-Jul 2017CompletedOct 2020Jul 2019
ClioP52000000184PANVEL, Raigarh-Jul 2017CompletedOct 2020Jul 2019
MinervaP52000000284PANVEL, Raigarh-Jul 2017CompletedSep 2020Jul 2019
HermesP52000000267PANVEL, Raigarh-Jul 2017CompletedFeb 2020Jul 2019
AtlasP52000000262Panvel, Raigarh-Jul 2017CompletedFeb 2020Jul 2019
Atlantis C WingP51800000143Hiranandani Gardens , Powai, Mumbai Suburban-Jul 2017CompletedDec 2019Feb 2019
Atlantis A and B WingP51800000154Hiranandani Gardens, Powai, Mumbai Suburban-Jul 2017CompletedDec 2019Mar 2018
Apollo and AthenaSurvey No. 58-2 Part Village Bhokarpada Taluka Panvel District Raigad Maharashtra130-CompletedDec 2017Mar 2016

How this compares with Raigarh

80%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ebony on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Bhokarpada5,900+ in Raigarh

Builder: Persipina Developers Private Limited

Persipina Developers Private Limited has 38 registrations on MahaRERA, including Atlas and Aurora. Its filings disclose 41 earlier MahaRERA projects: declares 26 of 26 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Ebony is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ebony?

The registered promoter entity is Persipina Developers Private Limited, a company as per the filing. Its CIN U45200MH2007PTC172099 and GSTIN 27AAECP3315L1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ebony?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ebony?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ebony?

The professionals named in the filing: Architect: Gunisha Sanyal; Architect: Gunisha Sethi Sanyal; Engineer: Er. Prashanth N.; Chartered Accountant: Manoj O. Shah & CO; Chartered Accountant: Arun P Vaz & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ebony?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ebony. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ebony to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.