Home / Browse projects / Mumbai Suburban, Maharashtra / EMPRESS HILL A B C and D Wings
EMPRESS HILL A B C and D Wings
RG-MH-06667 · RERA P51800052633 · Last updated on MahaRERA portal: 16 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 8 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EMPRESS HILL A B C and D Wings is a Residential / Group Housing project by HGP Community Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052633 on 15 Sep 2023. Possession is promised by 31 Dec 2028. 327 of the 359 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameEMPRESS HILL A B C and D Wings
- TypeResidential / Group Housing
- Location
- Main Street
- Hiranandani Gardens Powai
- Powai
- Kurla
- Mumbai Suburban
- 400076
- Pincode400076
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800052633
- ReraGenie IDRG-MH-06667
Builder
- NameHGP Community Pvt. Ltd.
- Entity typeCompany
- CINU45201MH2016PTC274222
- GSTIN27AADCH8389P1ZL
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorsKamal N Hiranandani, Alka S Hiranandani
- Other registrations8 more →
- Completed7 of 9
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Sep 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed216 files
Current status
Figures as on 16 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| EMPRESS HILL A B C and D Wings | NA | 26 | 22 | 359 | 0 | 359 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 91%.
EMPRESS HILL A B C and D Wings: 51% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 91% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 1% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 35% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 25% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 5% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed817
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| EMPRESS HILL A B C and D Wings | NA | Rs 592.45 cr | Rs 228.66 cr |
| - | NA | Rs 30.00 cr | Rs 4.33 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vinayak Ravindra Shrivastava |
| Engineer | Prashanth Nandulamattam Sastry |
| Chartered Accountant | Swati Harshad Patrawala |
| Chartered Accountant | Rakesh D Shah |
| Chartered Accountant | Manoj Ochhavlal Shah |
| Chartered Accountant | Khushal Ramniklal Bheda |
| Partner | Role in project |
|---|---|
| HGP Community Pvt. Ltd. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Sep 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed216
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 216 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Empress Hill 31 March 2026.pdf | 16 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Empress Hill 31 March 2026.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 EMPRESS HILL 31 March 2026.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 EMPRESS HILL 31 March 2026.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: EMPRESSHILL Form 31 March 2026.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: EMPRESSHILL Form 31 March 2026.pdf | 16 Apr 2026 |
| Form 2A (FY 2025-2026)File: Empress Hill Form 2A FY 2025-26.pdf | 14 Apr 2026 |
| Withdrawal Update Form 1File: Empress Hill Form 1.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: Empress Hill Form 1.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: Empress Hill Form 1.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Emprss hill Form 3.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Emprss hill Form 3.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Emprss hill Form 3.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Empress Hill 30 Sep 2025.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 EMPRESS HILL 30 Sep 2025.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Empress Hill 30 Sep 2025.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Empress Hill 30 Sep 2025.pdf | 14 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 EMPRESS HILL 30 Sep 2025.pdf | 14 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Empress Hill 30 Sep 2025.pdf | 14 Oct 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 28 Aug 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 28 Aug 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 28 Aug 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 28 Aug 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 28 Aug 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 28 Aug 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 1File: EMPRESS HILL Form 1 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: EMPRESS HILL Form 2 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: EMPRESS HILL Form 3 till 30 Jun 2025.pdf | 15 Jul 2025 |
| Form 1File: Arch Form 1 Empress Hill.pdf | 14 Jul 2025 |
| Form 2File: EMPRESS HILL Engr 2.pdf | 14 Jul 2025 |
| Form 3File: Empress hill 3 CA.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 30 9 24 sold unsold Empress hill.pdf | 14 Jul 2025 |
| Form 1File: Empress Hill Form 1.pdf | 14 Jul 2025 |
| Form 2File: EMPRESS HILL Form 2.pdf | 14 Jul 2025 |
| Form 3File: Empress hill Form 3.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 30 12 24 sold unsold emprsshill.pdf | 14 Jul 2025 |
| Form 1File: Form 1 RERA Empress Hill.pdf | 14 Jul 2025 |
| Form 2File: Empress Hill Form 2.pdf | 14 Jul 2025 |
| Form 3File: Empress hill Form 3.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Emprss hill 30 sep 23 sold unsold.pdf | 14 Jul 2025 |
| Form 1File: EMPRESS HILL FORM 1.pdf | 14 Jul 2025 |
| Form 2File: EMPRESS HILL Form 2.pdf | 14 Jul 2025 |
| Form 3File: Empress hill Form 3.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Emprsshill 31 dec 23 sold unsold.pdf | 14 Jul 2025 |
| Form 1File: Empress Hill Form 1.pdf | 14 Jul 2025 |
| Form 2File: EMPRESS HILL Form 2.pdf | 14 Jul 2025 |
| Form 3File: Empress hill Form 3.pdf | 14 Jul 2025 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| HIGHLAND A B C D AND E WingP51800029948 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2021 | Completed | Dec 2026 | Mar 2025 |
| REGENT HILL A B C D AND E WINGP51800018620 | HIRANANDANI GARDENS POWAI, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2025 | Apr 2022 |
| REGENT HILL A B C D AND E WINGP51800018620 | HIRANANDANI GARDENS POWAI, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2025 | Mar 2022 |
| SorrentoP51800021706 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2019 | Completed | Dec 2024 | Jun 2022 |
| Castle Rock C and D WingP51800000405 | Hiranandani Gardens, Powai., Mumbai Suburban | - | Jul 2017 | Completed | Dec 2023 | Nov 2020 |
| Atlantis C WingP51800000143 | Hiranandani Gardens , Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Feb 2019 |
| Atlantis A and B WingP51800000154 | Hiranandani Gardens, Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Mar 2018 |
| Adonia A and B Wing | Sector IX Hiranandani Gardens Powai Mumbai 400076 | 104 | - | Completed | Dec 2016 | Jul 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 216 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep EMPRESS HILL A B C and D Wings on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hiranandani Gardens Powai6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 71 registered projects within 2 km.
MARS - WING - B
SUNCITY HOUSING
MARS- SUNCITY HOUSING PHASE II
SUNCITY HOUSING
MARS WING-C
Sun City Housing
SHREE KRISHNA Wing C,D and E
Shreem Properties
ISLE OF CALM TOWER 1
SUNRISE HOUSING
ISLE OF CALM TOWER 2
SUNRISE HOUSING
See every Mumbai Suburban project, with the district possession charts
Builder: HGP Community Pvt. Ltd.
HGP Community Pvt. Ltd. has 9 registrations on MahaRERA, including Atlantis C Wing and Atlantis A and B Wing. Its filings disclose 8 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if EMPRESS HILL A B C and D Wings is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EMPRESS HILL A B C and D Wings?
The registered promoter entity is HGP Community Pvt. Ltd., a company as per the filing. Its CIN U45201MH2016PTC274222 and GSTIN 27AADCH8389P1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EMPRESS HILL A B C and D Wings?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for EMPRESS HILL A B C and D Wings?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EMPRESS HILL A B C and D Wings?
The professionals named in the filing: Architect: Vinayak Ravindra Shrivastava; Engineer: Prashanth Nandulamattam Sastry; Chartered Accountant: Swati Harshad Patrawala; Chartered Accountant: Rakesh D Shah; Chartered Accountant: Manoj Ochhavlal Shah; Chartered Accountant: Khushal Ramniklal Bheda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EMPRESS HILL A B C and D Wings?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback