Home / Browse projects / Mumbai Suburban, Maharashtra / Atlantis C Wing
Atlantis C Wing
RG-MH-08124 · RERA P51800000143 · Last updated on MahaRERA portal: 3 Apr 2025
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 7 completed earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Atlantis C Wing is a Residential / Group Housing project by HGP Community Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000143 on 5 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. 2 complaints are on record with the regulator.
At a glance
Project
- NameAtlantis C Wing
- TypeResidential / Group Housing
- Location
- Orchard Avenue
- Hiranandani Gardens
- Powai
- Kurla
- Mumbai Suburban
- 400076
- Pincode400076
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800000143
- ReraGenie IDRG-MH-08124
Builder
- NameHGP Community Pvt. Ltd.
- Entity typeCompany
- CINU45201MH2016PTC274222
- GSTIN27AADCH8389P1ZL
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorsKamal N Hiranandani, Alka Hiranandani
- Other registrations8 more →
- Completed7 of 9
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Jul 2017
- Promised completion31 Dec 2019
- Revised completionNone
- Buildings1 building record
- Documents filed230 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Atlantis C Wing | NA | 37 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Atlantis C Wing: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed384
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| HGP Community Pvt. Ltd. | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000195345 | Mr Rajesh Hiralal Gandhi | HGP Community Pvt. Ltd. | 23/12/2020 |
| CC006000000195344 | Mr Hetal Hiralal Gandhi | HGP Community Pvt. Ltd. | 23/12/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Feb 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Feb 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed230
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 230 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Rera Update 31-03-2025 Atlantis C.pdf | 3 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31-12-2024 Atlantis C.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30-09-2024 Atlantis C.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30-09-2024 Atlantis C.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30-06-2024 Atlantis C.pdf | 9 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31-03-2024 Atlantis C.pdf | 15 Apr 2024 |
| Details of encumbrancesFile: ICICI and HGP.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31122023 Atlantis C.pdf | 5 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30092023 Atlantis C.pdf | 15 Oct 2023 |
| Details of encumbrancesFile: HGP Atlantis.pdf | 28 Jul 2023 |
| CERSAI detailsFile: CERSAI ATLANTIS.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30062023 Atlantis C.pdf | 12 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31032023 Atlantis C.pdf | 8 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31122022 Atlantis C.pdf | 12 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30092022 Atlantis C.pdf | 15 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30062022AtlantisCwingFinal.pdf | 11 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: RERA ATLANTIS C as on 31032022.pdf | 21 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: RERA Sold Unsold Data Atlantis C Wing.pdf | 5 Jan 2022 |
| Details of encumbrancesFile: HGP CERSAI CERTIFICATE and REPORT.pdf | 26 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Rera Sold Unsold Data Atlantis C Wing.pdf | 20 Oct 2021 |
| Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE Atlantis.pdf | 7 Oct 2021 |
| Status of ConveyanceFile: Atlantis C.pdf | 21 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold data Atlantis C.pdf | 4 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Rera Update Atlantic C Wing 31052021.pdf | 30 Jun 2021 |
| Status of Formation of Legal EntityFile: Atlantis Soc Registration Certificate.pdf | 5 Feb 2020 |
| Certificates of CA (Form 5)File: Atlantis C Form V.pdf | 19 Sep 2019 |
| Building plan approvalFile: 9 OF 18.pdf | 24 Feb 2019 |
| Building plan approvalFile: 10 OF 18.pdf | 24 Feb 2019 |
| Building plan approvalFile: 11 OF 18.pdf | 24 Feb 2019 |
| Building plan approvalFile: 12 OF 18.pdf | 24 Feb 2019 |
| Building plan approvalFile: 13 OF 18.pdf | 24 Feb 2019 |
| Building plan approvalFile: 14 OF 18.pdf | 24 Feb 2019 |
| Building plan approvalFile: 15 OF 18.pdf | 24 Feb 2019 |
| Building plan approvalFile: 16 OF 18.pdf | 24 Feb 2019 |
| Building plan approvalFile: 17 OF 18.pdf | 24 Feb 2019 |
| Building plan approvalFile: 18 OF 18.pdf | 24 Feb 2019 |
| Layout approvalFile: 2 OF 18.pdf | 24 Feb 2019 |
| Layout approvalFile: 3 OF 18.pdf | 24 Feb 2019 |
| Layout approvalFile: 4 OF 18.pdf | 24 Feb 2019 |
| Layout approvalFile: 5 OF 18.pdf | 24 Feb 2019 |
| Layout approvalFile: 6 OF 18.pdf | 24 Feb 2019 |
| Layout approvalFile: 7 OF 18.pdf | 24 Feb 2019 |
| Layout approvalFile: 8 OF 18.pdf | 24 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: 2 OF 18.pdf | 24 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: 3 OF 18.pdf | 24 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: 4 OF 18.pdf | 24 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: 5 OF 18.pdf | 24 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: 6 OF 18.pdf | 24 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: 7 OF 18.pdf | 24 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: 8 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 9 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 10 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 11 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 12 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 13 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 14 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 15 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 16 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 17 OF 18.pdf | 24 Feb 2019 |
| Building Plan Approval (IOD)File: 18 OF 18.pdf | 24 Feb 2019 |
| OtherFile: Atlantis C RERA AC Closure.pdf | 23 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch OC Atlantis Wing C.pdf | 19 Feb 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Atlantis C engr OC.pdf | 19 Feb 2019 |
| Certificates of CA (Form 3)File: Atlantis C wing CA Final OC.pdf | 19 Feb 2019 |
| Certificates of Architect (Form 4)File: Form 4 Atlantis C wing.pdf | 17 Feb 2019 |
| Certificates of Architect (Form 4)File: ATLANTIS WING C OC 13022019.pdf | 17 Feb 2019 |
| OtherFile: ATLANTIS WING C OC 13022019.pdf | 17 Feb 2019 |
| Layout approvalFile: 2 OF 3.pdf | 9 Feb 2019 |
| Layout approvalFile: 3 OF 3.pdf | 9 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: 2 OF 3.pdf | 9 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: 3 OF 3.pdf | 9 Feb 2019 |
| OtherFile: 1 OF 3 Atlantis clubhouse OC 24012019.pdf | 9 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Atlantis C.pdf | 21 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ATLANTIS C BLDG.pdf | 21 Dec 2018 |
| Certificates of CA (Form 3)File: Atlantis C Certificate CA.pdf | 21 Dec 2018 |
| Details of encumbrancesFile: Encumbrance Certificate Atlantis C.pdf | 6 Oct 2018 |
| Certificates of CA (Form 5)File: Form 5 Atlantis C.pdf | 27 Sep 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Atlantis C arch 1 sep R.pdf | 21 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Atlantis C engr 1sep.pdf | 21 Sep 2018 |
| Certificates of CA (Form 3)File: CA Atlantis C.pdf | 21 Sep 2018 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| EMPRESS HILL A B C and D WingsP51800052633 | Hiranandani Gardens Powai, Mumbai Suburban | 359 | Sep 2023 | Ongoing | Dec 2028 | Not due yet |
| HIGHLAND A B C D AND E WingP51800029948 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2021 | Completed | Dec 2026 | Mar 2025 |
| REGENT HILL A B C D AND E WINGP51800018620 | HIRANANDANI GARDENS POWAI, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2025 | Apr 2022 |
| REGENT HILL A B C D AND E WINGP51800018620 | HIRANANDANI GARDENS POWAI, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2025 | Mar 2022 |
| SorrentoP51800021706 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2019 | Completed | Dec 2024 | Jun 2022 |
| Castle Rock C and D WingP51800000405 | Hiranandani Gardens, Powai., Mumbai Suburban | - | Jul 2017 | Completed | Dec 2023 | Nov 2020 |
| Atlantis A and B WingP51800000154 | Hiranandani Gardens, Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Mar 2018 |
| Adonia A and B Wing | Sector IX Hiranandani Gardens Powai Mumbai 400076 | 104 | - | Completed | Dec 2016 | Jul 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 230 filed documents as one ZIP, foldered, with a manifest
Keep Atlantis C Wing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hiranandani Gardens , Powai6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 78 registered projects within 2 km.
EMPRESS HILL A B C and D Wings
HGP Community Pvt. Ltd.
MARS - WING - B
SUNCITY HOUSING
MARS- SUNCITY HOUSING PHASE II
SUNCITY HOUSING
MARS WING-C
Sun City Housing
SHREE KRISHNA Wing C,D and E
Shreem Properties
ISLE OF CALM TOWER 1
SUNRISE HOUSING
See every Mumbai Suburban project, with the district possession charts
Builder: HGP Community Pvt. Ltd.
HGP Community Pvt. Ltd. has 9 registrations on MahaRERA, including Atlantis C Wing and Atlantis A and B Wing. Its filings disclose 8 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Atlantis C Wing is delayed beyond 31 Dec 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Atlantis C Wing?
The registered promoter entity is HGP Community Pvt. Ltd., a company as per the filing. Its CIN U45201MH2016PTC274222 and GSTIN 27AADCH8389P1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Atlantis C Wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Atlantis C Wing?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Atlantis C Wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Atlantis C Wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback