Home / Browse projects / Raigarh, Maharashtra / Arcadia
Arcadia
By Persipina Developers Private Limited
RG-MH-31980 · RERA P52000080195 · Last updated on MahaRERA portal: 15 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- Rs 62.86 crore secured on the land, in favour of Beacon Trusteeship Limited
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 26 completed earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Arcadia is a Residential / Group Housing project by Persipina Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000080195 on 6 May 2025. Possession is promised by 31 Dec 2031. 105 of the 160 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameArcadia
- TypeResidential / Group Housing
- Location
- Old Mumbai Pune Highway 4
- Village Khalapur
- Panshil
- Khalapur
- Raigarh
- 410222
- Pincode410222
- RERA no.P52000080195
- ReraGenie IDRG-MH-31980
Builder
- NamePersipina Developers Private Limited
- Entity typeCompany
- CINU45200MH2007PTC172099
- GSTIN27AAECP3315L1ZC
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorNiranjan Lakhumal Hiranand Hiranandani
- Other registrations37 more →
- Completed19 of 38
- Declared earlier projects41 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 May 2025
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 15 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Arcadia | NA | 44 | 40 | 160 | 0 | 160 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Arcadia: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed252
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Arcadia | NA | Rs 212.17 cr | Rs 81.24 lakh |
| - | NA | Rs 2.00 cr | Rs 72.99 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gunisha Sethi Sanyal |
| Architect | Gunisha Sanyal |
| Engineer | PRASHANTH NANDULAMATTAM |
| Chartered Accountant | Manoj O. Shah & CO. |
| Chartered Accountant | Manoj O. Shah & CO. Shah |
| Chartered Accountant | Arun Vaz |
| Chartered Accountant | Arun P Vaz & Co |
| Partner | Role in project |
|---|---|
| Persipina Developers Private Limited | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 163/2017 | Before Civil Judge Senior Division at Panvel | Court directed to take further step to bring on record the legal heirs of Defendant |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2031
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARC CER ARCADIA.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: ENG CER ARCADIA.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: FORM-3 Mar 2026 ARCADIA.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: 1 FORM 1 ARCHITECT CERTIFICATE - ARCADIA.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 ARCH CERT ARCADIA.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 ARCH CERT ARCADIA.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate - Arcadia (The Arena).pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate - Arcadia (The Arena).pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate - Arcadia (The Arena).pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Arcadia_Eng Cert.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Eng Cert Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Eng Cert Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Eng RERA Certificate - Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Eng RERA Certificate - Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Eng RERA Certificate - Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Arcadia.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: CA CER ARCADIA.pdf | 20 Jan 2026 |
| Form 1File: 1 FORM 1 ARCHITECT CERTIFICATE - ARCADIA.pdf | 27 Jul 2025 |
| Form 2File: ENGINEER ' S CERTIFICATE ARCADIA JUNE 2025.pdf | 27 Jul 2025 |
| Form 3File: CA CER ARCADIA.pdf | 27 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD BOOKED ARCADIA.pdf | 27 Jul 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS Arcadia.pdf | 6 May 2025 |
| Proforma of Agreement for saleFile: Draft AFS Arcadia.pdf | 6 May 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS Arcadia.pdf | 6 May 2025 |
| Proforma of Agreement for saleFile: Draft AFS Arcadia.pdf | 6 May 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Letter Secured and Unsecured ARCADIA0.pdf | 30 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 28 Apr 2025 |
| Other - LegalFile: ARCADIA 28 04 2025.pdf | 28 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 28 Apr 2025 |
| Copy of the legal title reportFile: Copy title report ARCADIA.pdf | 25 Apr 2025 |
| Other - LegalFile: Registered Sale Certificate Panvel.pdf | 25 Apr 2025 |
| Proforma of Allotment letterFile: Allotment Letter Arcadia.pdf | 24 Apr 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report_PALO_ Arcadia.pdf | 24 Apr 2025 |
| Other - TechnicalFile: Letter Dec Arcadia.pdf | 24 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS Arcadia.pdf | 24 Apr 2025 |
| Proforma of Agreement for saleFile: DRaft AFS Arcadia.pdf | 24 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate (Form 3) ARCADIA.pdf | 23 Apr 2025 |
| CERSAI detailsFile: CERSAI CER ARCADIA.pdf | 22 Apr 2025 |
| Other - TechnicalFile: LH NEW undertaking ARCADIA.pdf | 17 Apr 2025 |
| Declaration about Commencement CertificateFile: FORMAT-D ARCADIA.pdf | 16 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Spearate Account FORMAT-A ARCADIA.pdf | 16 Apr 2025 |
| Other - TechnicalFile: Arcadia_Car parking Letter.pdf | 16 Apr 2025 |
| Other - TechnicalFile: Self Decl Area ARC ARCADIA.pdf | 16 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK LETTER FORMAT-B ARCADIA.pdf | 16 Apr 2025 |
| Building plan approvalFile: 9 Arcadia Typical and Refuge.pdf | 15 Apr 2025 |
| Building plan approvalFile: 10 Arcadia Section.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 10 Arcadia Section.pdf | 15 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 9 Arcadia Typical and Refuge.pdf | 15 Apr 2025 |
| Building plan approvalFile: 2 Arcadia Ground floor level Full Layout.pdf | 14 Apr 2025 |
| Building plan approvalFile: 3 Arcadia Basement 01 level Full layout.pdf | 14 Apr 2025 |
| Building plan approvalFile: 4 Arcadia Basement 02 level Full layout.pdf | 14 Apr 2025 |
| Building plan approvalFile: 6 Arcadia Podium 01 level Full layout.pdf | 14 Apr 2025 |
| Building plan approvalFile: 8 Arcadia Ground and P1 Tower footprints.pdf | 14 Apr 2025 |
| Building plan approvalFile: 10 Arcadia Section.pdf | 14 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE DECLARATION ARCADIA.pdf | 14 Apr 2025 |
| Declaration in FORM BFile: Form B AFFIDAVIT ARCADIA.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 ARCHITECT CERTIFICATE - ARCADIA.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng ARCADIA.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Arcadia Ground floor level Full Layout.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 10 Arcadia Section.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 8 Arcadia Ground and P1 Tower footprints.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Arcadia Podium 01 level Full layout.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Arcadia Basement 02 level Full layout.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Arcadia Basement 01 level Full layout.pdf | 14 Apr 2025 |
| Other - LegalFile: PDPL BR.pdf | 14 Apr 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION ARCADIA.pdf | 14 Apr 2025 |
| Other - TechnicalFile: THE ARENA email.pdf | 14 Apr 2025 |
| Layout approvalFile: Main Sheet Layout Plan.pdf | 10 Apr 2025 |
| PAN CardFile: PAN Card PDPL.pdf | 10 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Main Sheet Layout Plan.pdf | 10 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 10 Apr 2025 |
| Other - LegalFile: RZ 05 7_12.pdf | 10 Apr 2025 |
| Other - TechnicalFile: Development plan layout.pdf | 10 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE ARCADIA NLH.pdf | 10 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE ARCADIA KNH.pdf | 10 Apr 2025 |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PavilionPR1270002501589 | Village Khalapur, Raigarh | 160 | Nov 2025 | Ongoing | Jun 2032 | Not due yet |
| GrandstandPR1270002501603 | Village Khalapur, Raigarh | 313 | Nov 2025 | Ongoing | Jun 2032 | Not due yet |
| AtheleticaPR1270002501610 | Village Khalapur, Raigarh | 160 | Nov 2025 | Ongoing | Jun 2032 | Not due yet |
| GreenfieldP52000080098 | Panvel, Raigarh | 320 | Apr 2025 | Ongoing | Dec 2031 | Not due yet |
| CitadelP52000080155 | Panvel, Raigarh | 160 | May 2025 | Ongoing | Dec 2031 | Not due yet |
| AsterP52000055662 | Village Bhokarpada, Raigarh | 144 | Apr 2024 | Ongoing | Dec 2031 | Not due yet |
| MAYFLOWERP52000054617 | Village Bhokarpada, Raigarh | 144 | Feb 2024 | Ongoing | Dec 2029 | Not due yet |
| MARIGOLDP52000054616 | Village Bhokarpada, Raigarh | 30 | Feb 2024 | Ongoing | Dec 2029 | Not due yet |
| LAVENDERP52000054615 | Village Bhokarpada, Raigarh | 144 | Feb 2024 | Ongoing | Dec 2029 | Not due yet |
| EbonyP52000080165 | Village Bhokarpada, Raigarh | 178 | May 2025 | Ongoing | Dec 2029 | Not due yet |
| OrchidP52000050193 | Village Bhokarpada, Raigarh | 288 | Mar 2023 | Ongoing | Dec 2028 | Not due yet |
| IrisP52000050194 | Village Bhokarpada, Raigarh | 144 | Mar 2023 | Ongoing | Dec 2028 | Not due yet |
| EMPRESS HILL A B C and D WingsP51800052633 | Hiranandani Gardens Powai, Mumbai Suburban | 359 | Sep 2023 | Ongoing | Dec 2028 | Not due yet |
| AcaciaP52000050196 | village Bhokarapada, Raigarh | 288 | Mar 2023 | Ongoing | Dec 2028 | Not due yet |
| HIGHLAND A B C D AND E WingP51800029948 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2021 | Completed | Dec 2026 | Mar 2025 |
| REGENT HILL A B C D AND E WINGP51800018620 | HIRANANDANI GARDENS POWAI, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2025 | Apr 2022 |
| SorrentoP51800021706 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2019 | Completed | Dec 2024 | Jun 2022 |
| Castle Rock C and D WingP51800000405 | Hiranandani Gardens, Powai., Mumbai Suburban | - | Jul 2017 | Completed | Dec 2023 | Jun 2023 |
| ZeusP52000001064 | Bhokarpada, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| VestaP52000001078 | Bhokarpada, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| VENUSP52000001518 | Bhokarpada, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| OrionP52000002990 | Bhokarpada, Raigarh | - | Aug 2017 | Completed | Apr 2023 | Sep 2022 |
| HeraP52000001513 | Panvel, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| ARTEMISP52000001381 | Panvel, Raigarh | - | Jul 2017 | Completed | Apr 2023 | May 2021 |
| SeleneP52000002730 | Bhokarpada, Raigarh | - | Aug 2017 | Completed | Mar 2023 | May 2021 |
| FloraP52000001514 | Panvel, Raigarh | - | Jul 2017 | Completed | Mar 2023 | May 2021 |
| Retail CP52000001411 | Panvel, Raigarh | - | Jul 2017 | Completed | Mar 2022 | May 2021 |
| Retail AP52000000436 | PANVEL, Raigarh | - | Jul 2017 | Completed | Dec 2021 | Jul 2019 |
| HeliosP52000000261 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| AuroraP52000000256 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| AuraP52000000263 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| ArgusP52000000265 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| MellonaP52000000260 | PANVEL, Raigarh | - | Jul 2017 | Completed | Oct 2020 | Jul 2019 |
| ClioP52000000184 | PANVEL, Raigarh | - | Jul 2017 | Completed | Oct 2020 | Jul 2019 |
| MinervaP52000000284 | PANVEL, Raigarh | - | Jul 2017 | Completed | Sep 2020 | Jul 2019 |
| HermesP52000000267 | PANVEL, Raigarh | - | Jul 2017 | Completed | Feb 2020 | Jul 2019 |
| AtlasP52000000262 | Panvel, Raigarh | - | Jul 2017 | Completed | Feb 2020 | Jul 2019 |
| Atlantis C WingP51800000143 | Hiranandani Gardens , Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Feb 2019 |
| Atlantis A and B WingP51800000154 | Hiranandani Gardens, Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Mar 2018 |
| Apollo and Athena | Survey No. 58-2 Part Village Bhokarpada Taluka Panvel District Raigad Maharashtra | 130 | - | Completed | Dec 2017 | Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 37 other registrations, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Arcadia on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Village Khalapur5,900+ in Raigarh
MASS DREAM CITY
Mass Developers
Greenfield
Persipina Developers Private Limited
Grandstand
Persipina Developers Private Limited
Olympus
Persipina Developers Private Limited
RIYASAT BLISS
Riyasat Infra Developers Private Limited
DWARIKA MAJESTICA
NAMASTEY GROUP
See every Raigarh project, with the district possession charts
Builder: Persipina Developers Private Limited
Persipina Developers Private Limited has 38 registrations on MahaRERA, including Atlas and Aurora. Its filings disclose 41 earlier MahaRERA projects: declares 26 of 26 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Arcadia is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Arcadia?
The registered promoter entity is Persipina Developers Private Limited, a company as per the filing. Its CIN U45200MH2007PTC172099 and GSTIN 27AAECP3315L1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Arcadia?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Arcadia?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Arcadia?
The professionals named in the filing: Architect: Gunisha Sethi Sanyal; Architect: Gunisha Sanyal; Engineer: PRASHANTH NANDULAMATTAM; Chartered Accountant: Manoj O. Shah & CO.; Chartered Accountant: Manoj O. Shah & CO. Shah; Chartered Accountant: Arun Vaz. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Arcadia?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback