ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Selene

Completed No litigation declared Residential / Group Housing project

Selene

By Persipina Developers Private Limited

RG-MH-10752 · RERA P52000002730 · Last updated on MahaRERA portal: 4 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 25 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 37 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 134 documents Report an error

Selene is a Residential / Group Housing project by Persipina Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000002730 on 4 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2023.

At a glance

Project

  • NameSelene
  • TypeResidential / Group Housing
  • Location
    • Bhokarpada
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000002730
  • ReraGenie IDRG-MH-10752

Builder

  • NamePersipina Developers Private Limited
  • Entity typeCompany
  • CINU45200MH2007PTC172099
  • GSTIN27AAECP3315L1ZC
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorsNiranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani
  • Other registrations37 more →
  • Completed19 of 38
  • Declared earlier projects41 →

Key dates

this monthRegisteredAug 2017PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed134 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SeleneNA380000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Selene: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed314

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots314
Closed/Covered295
Open Space19

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area774 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19240.62
Proposed, not sanctioned19,241 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVentura Hiranandani Business Park Powai 400076

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGunisha Sethi Sanyal
Engineer) MAHIMTURA CONSULTANTS Private limited
PartnerRole in project
Persipina Developers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Nov 2024

Documents filed134

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL O C.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 01 main sheet rera.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 02 P-01 rera.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 03 StiltGround floor rera.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 05 P-02 rera.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 06 P-03 rera.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 9 STILT TERRACE FLORA SELENE_rera.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 10 P-3 FLORA SELENE_rera.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 11 P-1 P-2 FLORA SELENE_rera.pdf4 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 13 selene typ_rera.pdf4 Nov 2024
Certificates of CA (Form 5)File: FORM-5 Selene 21.pdf7 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 Selene 21.pdf7 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT SELENE.pdf18 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER SELENE.pdf18 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A)File: ENG CER FORM 2A SELENE.pdf18 Jan 2022
Certificates of CA (Form 3)File: Selene CA Cert.pdf18 Jan 2022
Architect’s Certificate on Completion of Project (Form 4)File: Selene Form 4.pdf18 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Selene.pdf13 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT SELENE.pdf16 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Selene Engineer Certificate.pdf16 Jul 2021
Certificates of CA (Form 3)File: C A Cert Selene.pdf16 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Selene.pdf17 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SELENE Arch Cere.pdf26 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Selene Form 2.pdf26 Feb 2021
Certificates of CA (Form 3)File: Selene CA Cert.pdf26 Feb 2021
Certificates of CA (Form 5)File: Selen Form 5.pdf18 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Selen Form 5.pdf18 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT SELENE.pdf8 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Selene Engineers Certificate.pdf8 Dec 2020
Certificates of CA (Form 3)File: CA CER Selene.pdf8 Dec 2020
Proforma of Allotment letterFile: Agreement for Sale - Selene.pdf15 Jul 2020
Details of Restarting of Construction work post lockdownFile: Selene merged.pdf3 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT SELENE.pdf18 Apr 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Selen Eng Cert.pdf18 Apr 2020
Certificates of CA (Form 3)File: SELENE CA Cer.pdf18 Apr 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SELENE ARCHI CERTI.pdf20 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SELENE ENGI CERTI FORM 2.pdf20 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A)File: SELENE ENGI CERTI FORM 2A.pdf20 Jan 2020
Certificates of CA (Form 3)File: SELENE CA CERTI.pdf20 Jan 2020
Certificates of CA (Form 3)File: SELENE CA CERTI.pdf27 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Selene Arc Cert.pdf20 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Selene Engg Cert.pdf20 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SELENE FORM 5.pdf20 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SELENE ARCHI CERTI.pdf29 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SELENE ENGI CERTI.pdf29 Aug 2019
Engineers Certificate on Quality Assurance (Form 2A)File: SELENE QUALITY CERTI.pdf29 Aug 2019
Certificates of CA (Form 3)File: SELENE CA CERTI.pdf29 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SELENE ARCHI CERTI.pdf15 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SELENE ENG CERTI.pdf15 Jun 2019
Certificates of CA (Form 3)File: SELENE CA CERTI.pdf15 Jun 2019
Proforma of Allotment letterFile: Agreement for Sale.pdf15 Jun 2019
OtherFile: Denotification Order.pdf15 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Selene.pdf25 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SELENE ENGI CERTI.pdf25 Jan 2019
Certificates of CA (Form 3)File: SELENE C A CERTI.pdf25 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Selene Archi Certi.pdf3 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Selene Engi Certi.pdf3 Nov 2018
Certificates of CA (Form 3)File: Selene CA Certi.pdf3 Nov 2018
Certificates of CA (Form 5)File: Selene Form 5.pdf2 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Selene Archi Certi.pdf25 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Selene Engi Certi.pdf25 Jul 2018
Certificates of CA (Form 3)File: Selene C A Certi.pdf25 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Selene Archi Certi.pdf19 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Selene Engi Certi.pdf19 Apr 2018
Certificates of CA (Form 3)File: Selene C A Certi.pdf19 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Selene Arch Certificate.pdf20 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Selene Engg Certificate.pdf20 Jan 2018
Certificates of CA (Form 3)File: Selene CA Certificate.pdf20 Jan 2018
Layout approvalFile: LAYOUT BUILDINGS.pdf17 Oct 2017
Layout approvalFile: LAYOUT PODIUM 1.pdf17 Oct 2017
Layout approvalFile: LAYOUT PODIUM 2.pdf17 Oct 2017
Layout approvalFile: LAYOUT PODIUM 3.pdf17 Oct 2017
Layout approvalFile: LAYOUT STILT.pdf17 Oct 2017
Building plan approvalFile: SELENE TYPICAL PLAN.pdf17 Oct 2017
Building plan approvalFile: SELENE STILT TERRACE.pdf17 Oct 2017
Building plan approvalFile: SELENE P1 P2.pdf17 Oct 2017
Building plan approvalFile: SELENE P3.pdf17 Oct 2017
Building plan approvalFile: SELENE SECTION ELEVATION.pdf17 Oct 2017
Copy of Layout Approval (in case of layout)File: LAYOUT BUILDINGS.pdf17 Oct 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PODIUM 1.pdf17 Oct 2017

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

25 delivered on promise15 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PavilionPR1270002501589Village Khalapur, Raigarh160Nov 2025OngoingJun 2032Not due yet
GrandstandPR1270002501603Village Khalapur, Raigarh313Nov 2025OngoingJun 2032Not due yet
AtheleticaPR1270002501610Village Khalapur, Raigarh160Nov 2025OngoingJun 2032Not due yet
GreenfieldP52000080098Panvel, Raigarh320Apr 2025OngoingDec 2031Not due yet
CitadelP52000080155Panvel, Raigarh160May 2025OngoingDec 2031Not due yet
AsterP52000055662Village Bhokarpada, Raigarh144Apr 2024OngoingDec 2031Not due yet
ArcadiaP52000080195Village Khalapur, Raigarh160May 2025OngoingDec 2031Not due yet
MAYFLOWERP52000054617Village Bhokarpada, Raigarh144Feb 2024OngoingDec 2029Not due yet
MARIGOLDP52000054616Village Bhokarpada, Raigarh30Feb 2024OngoingDec 2029Not due yet
LAVENDERP52000054615Village Bhokarpada, Raigarh144Feb 2024OngoingDec 2029Not due yet
EbonyP52000080165Village Bhokarpada, Raigarh178May 2025OngoingDec 2029Not due yet
OrchidP52000050193Village Bhokarpada, Raigarh288Mar 2023OngoingDec 2028Not due yet
IrisP52000050194Village Bhokarpada, Raigarh144Mar 2023OngoingDec 2028Not due yet
EMPRESS HILL A B C and D WingsP51800052633Hiranandani Gardens Powai, Mumbai Suburban359Sep 2023OngoingDec 2028Not due yet
AcaciaP52000050196village Bhokarapada, Raigarh288Mar 2023OngoingDec 2028Not due yet
HIGHLAND A B C D AND E WingP51800029948HIRANANDANI GARDENS, POWAI, Mumbai Suburban-Jul 2021CompletedDec 2026Mar 2025
REGENT HILL A B C D AND E WINGP51800018620HIRANANDANI GARDENS POWAI, Mumbai Suburban-Nov 2018CompletedJun 2025Apr 2022
SorrentoP51800021706HIRANANDANI GARDENS, POWAI, Mumbai Suburban-Jul 2019CompletedDec 2024Jun 2022
Castle Rock C and D WingP51800000405Hiranandani Gardens, Powai., Mumbai Suburban-Jul 2017CompletedDec 2023Jun 2023
ZeusP52000001064Bhokarpada, Raigarh-Jul 2017CompletedApr 2023Sep 2022
VestaP52000001078Bhokarpada, Raigarh-Jul 2017CompletedApr 2023Sep 2022
VENUSP52000001518Bhokarpada, Raigarh-Jul 2017CompletedApr 2023Sep 2022
OrionP52000002990Bhokarpada, Raigarh-Aug 2017CompletedApr 2023Sep 2022
HeraP52000001513Panvel, Raigarh-Jul 2017CompletedApr 2023Sep 2022
ARTEMISP52000001381Panvel, Raigarh-Jul 2017CompletedApr 2023May 2021
FloraP52000001514Panvel, Raigarh-Jul 2017CompletedMar 2023May 2021
Retail CP52000001411Panvel, Raigarh-Jul 2017CompletedMar 2022May 2021
Retail AP52000000436PANVEL, Raigarh-Jul 2017CompletedDec 2021Jul 2019
HeliosP52000000261PANVEL, Raigarh-Jul 2017CompletedNov 2020Jul 2019
AuroraP52000000256PANVEL, Raigarh-Jul 2017CompletedNov 2020Jul 2019
AuraP52000000263PANVEL, Raigarh-Jul 2017CompletedNov 2020Jul 2019
ArgusP52000000265PANVEL, Raigarh-Jul 2017CompletedNov 2020Jul 2019
MellonaP52000000260PANVEL, Raigarh-Jul 2017CompletedOct 2020Jul 2019
ClioP52000000184PANVEL, Raigarh-Jul 2017CompletedOct 2020Jul 2019
MinervaP52000000284PANVEL, Raigarh-Jul 2017CompletedSep 2020Jul 2019
HermesP52000000267PANVEL, Raigarh-Jul 2017CompletedFeb 2020Jul 2019
AtlasP52000000262Panvel, Raigarh-Jul 2017CompletedFeb 2020Jul 2019
Atlantis C WingP51800000143Hiranandani Gardens , Powai, Mumbai Suburban-Jul 2017CompletedDec 2019Feb 2019
Atlantis A and B WingP51800000154Hiranandani Gardens, Powai, Mumbai Suburban-Jul 2017CompletedDec 2019Mar 2018
Apollo and AthenaSurvey No. 58-2 Part Village Bhokarpada Taluka Panvel District Raigad Maharashtra130-CompletedDec 2017Mar 2016

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Selene on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhokarpada5,900+ in Raigarh

2 kmSeleneCompleted 243Lapsed / revoked 72Other 169Dot size: filed unitsN

Filed coordinates, straight-line distance. 484 registered projects within 2 km.

Builder: Persipina Developers Private Limited

Persipina Developers Private Limited has 38 registrations on MahaRERA, including Atlas and Aurora. Its filings disclose 41 earlier MahaRERA projects: declares 26 of 26 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Selene is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Selene?

The registered promoter entity is Persipina Developers Private Limited, a company as per the filing. Its CIN U45200MH2007PTC172099 and GSTIN 27AAECP3315L1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Selene?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Selene?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Selene?

The professionals named in the filing: Architect: Gunisha Sethi Sanyal; Engineer: ) MAHIMTURA CONSULTANTS Private limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Selene?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Selene. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Selene to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.