Home / Browse projects / Raigarh, Maharashtra / MARIGOLD
MARIGOLD
By Persipina Developers Private Limited
RG-MH-17602 · RERA P52000054616 · Last updated on MahaRERA portal: 14 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 26 completed earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARIGOLD is a Residential / Group Housing project by Persipina Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000054616 on 2 Feb 2024. Possession is promised by 31 Dec 2029. 17 of the 30 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameMARIGOLD
- TypeResidential / Group Housing
- Location
- Old Mumbai Pune Highway
- Village Bhokarpada
- Bhokarpada
- Panvel
- Raigarh
- 410221
- Pincode410221
- RERA no.P52000054616
- ReraGenie IDRG-MH-17602
Builder
- NamePersipina Developers Private Limited
- Entity typeCompany
- CINU45200MH2007PTC172099
- GSTIN27AAECP3315L1ZC
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorsNiranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani, Niranjan Lakhumal Hiranand Hiranandani
- Other registrations37 more →
- Completed19 of 38
- Declared earlier projects41 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Feb 2024
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed89 files
Current status
Figures as on 14 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MARIGOLD | NA | 39 | 36 | 29 | 1 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 83%.
MARIGOLD: 24% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 83% |
| Podiums (if any) | 0% |
| Plinth | 83% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed216
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners10
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gunisha Sanyal |
| Architect | Gunisha Sethi Sanyal |
| Engineer | Prashanth Nandulamattam |
| Chartered Accountant | Arun P Vaz & Company |
| Chartered Accountant | Rakesh Shah and Associates |
| Chartered Accountant | Manoj O. Shah & CO. Shah |
| Chartered Accountant | Manoj Shah |
| Chartered Accountant | Arun Vaz |
| Chartered Accountant | Arun P Vaz & Co |
| Chartered Accountant | Manoj O. Shah & CO. |
| Partner | Role in project |
|---|---|
| Persipina Developers Private Limited | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 333/2015 | Civil Judge Junior Division Panvel | For Argument on Injuction Application |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12501981 | Sai Krishnaiah Medikonda | Persipina Developers Private Limited | 18/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: ARC CER MARIGOLD.pdf | 14 Apr 2026 |
| Form 2File: ENG CER MARIGOLD.pdf | 14 Apr 2026 |
| Form 3File: Form-3 Marigold Mar 2026.pdf | 14 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCOLSURE MARIGOLD.pdf | 14 Apr 2026 |
| Form 1File: Form 1 Arch Cer - Marigold.pdf | 9 Jan 2026 |
| Form 2File: Form 2 Eng Cer - Marigold.pdf | 9 Jan 2026 |
| Form 3File: Form 3 CA CER MARIGOLD.pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DIS SOLD UNSOLD MARIGOLD.pdf | 9 Jan 2026 |
| Form 1File: 1 FORM ARC CERT MARIGOLD.pdf | 19 Oct 2025 |
| Form 2File: Form 2 RERA Cert Marigold.pdf | 19 Oct 2025 |
| Form 3File: Form 3 CA CER MARIGOLD.pdf | 19 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLSURE MARIGOLD.pdf | 19 Oct 2025 |
| Form 1File: FORM 1 ARCHITECT MARIGOLD.pdf | 18 Jul 2025 |
| Form 2File: FORM 2 ENG CERTIFICATE MARIGOLD.pdf | 18 Jul 2025 |
| Form 3File: CA CER MARIGOLD.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLSURE SOLD BOOKED MARIGOLD.pdf | 18 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC -CER MARIGOLD.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARIGOLD-Form 3.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Certificate - Eng Marigold.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Marigold.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Marigold CA Cer.pdf | 8 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER MAYFLOWER.pdf | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER MARIGOLD.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CER MARIGOLD.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert MARIGOLD.pdf | 15 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE MARIGOLD.pdf | 15 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: MARIGOLD DEVEIATION REPORT.pdf | 22 Nov 2024 |
| Proforma of Agreement for saleFile: Marigold - Draft Agreement.pdf | 22 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Mar 2024 Marigold.pdf | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC-CER MARIGOLD.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-CER MARIGOLD.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Engg Certificate - Marigold.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE - MARIGOLD.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Marigold -.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERT - MARIGOLD.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Certificate - MARIGOLD.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CER MARIGOLD.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE LAVENDER.pdf | 19 Apr 2024 |
| CERSAI detailsFile: DISCOLSURE MARIGOLD.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE MARIGOLD.pdf | 19 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCOLSURE MARIGOLD.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CER MARIGOLD.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Engg CERTIFICATE - MARIGOLD.pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate -MARIGOLD BLDG.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Marigold FORM 3 Certificate Mar 2024.pdf | 17 Apr 2024 |
| Layout approvalFile: 2 Copy of Layout Approval in case of layout.pdf | 2 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 2 Copy of Layout Approval in case of layout.pdf | 2 Feb 2024 |
| CERSAI detailsFile: CERSAI DECLARATION MARIGOLD.pdf | 1 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Niranjan Hiranandani.pdf | 1 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Kamal Hiranandani.pdf | 1 Feb 2024 |
| Proforma of Agreement for saleFile: Marigold - Draft Agreement - 31-01-2023.pdf | 1 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Marigold Agreement.pdf | 1 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Marigold Allotment letter Deveation Report.pdf | 1 Feb 2024 |
| Declaration about Commencement CertificateFile: FORMAT D MARIGOLD.pdf | 31 Jan 2024 |
| Proforma of Allotment letterFile: Allotment Letter on Letter Head PDPL 310124.pdf | 31 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT OF ALLOTMENT LETTER 31-1-24.pdf | 31 Jan 2024 |
| Other - LegalFile: BOARD RESOLUTION PDPL 5TH DEC 2023.pdf | 31 Jan 2024 |
| Other - LegalFile: 24-1-2 RZ 02.pdf | 31 Jan 2024 |
| Other - TechnicalFile: PLOT DECLARATION - MARIGOLD.pdf | 31 Jan 2024 |
| Other - TechnicalFile: DECLARATION MARIGOLD.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARIGOLD CERTIFICATE.pdf | 30 Jan 2024 |
| Declaration in FORM BFile: Affadivat Form B MARIGOLD.pdf | 29 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Marigold finanace final.pdf | 28 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Legal marigold final.pdf | 28 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Marigold finanace final.pdf | 28 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Legal marigold final.pdf | 28 Jan 2024 |
| Layout approvalFile: BUILDING FOOTPRINT AND PARKING DEMARCATION.pdf | 27 Jan 2024 |
| Building plan approvalFile: TYPICAL AND REFUGE FLOOR PLAN BUILT UP AREA DEMARCATION.pdf | 27 Jan 2024 |
| Building plan approvalFile: STILT OVERALL LAYOUT.pdf | 27 Jan 2024 |
| Building plan approvalFile: PODIUM 2 TERRACE FLOOR PLAN BLDG FOOTPRINT.pdf | 27 Jan 2024 |
| Building plan approvalFile: GROUND PODIUM1 FLOOR PLAN BLDG FOOTPRINT.pdf | 27 Jan 2024 |
| Building plan approvalFile: P1 OVERALL LAYOUT.pdf | 27 Jan 2024 |
| Building plan approvalFile: SECTIONS.pdf | 27 Jan 2024 |
| Building plan approvalFile: P2 OVERALL LAYOUT.pdf | 27 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: BUILDING FOOTPRINT AND PARKING DEMARCATION.pdf | 27 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: TYPICAL AND REFUGE FLOOR PLAN BUILT UP AREA DEMARCATION.pdf | 27 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: STILT OVERALL LAYOUT.pdf | 27 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PODIUM 2 TERRACE FLOOR PLAN BLDG FOOTPRINT.pdf | 27 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: GROUND PODIUM1 FLOOR PLAN BLDG FOOTPRINT.pdf | 27 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: P1 OVERALL LAYOUT.pdf | 27 Jan 2024 |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| PavilionPR1270002501589 | Village Khalapur, Raigarh | 160 | Nov 2025 | Ongoing | Jun 2032 | Not due yet |
| GrandstandPR1270002501603 | Village Khalapur, Raigarh | 313 | Nov 2025 | Ongoing | Jun 2032 | Not due yet |
| AtheleticaPR1270002501610 | Village Khalapur, Raigarh | 160 | Nov 2025 | Ongoing | Jun 2032 | Not due yet |
| GreenfieldP52000080098 | Panvel, Raigarh | 320 | Apr 2025 | Ongoing | Dec 2031 | Not due yet |
| CitadelP52000080155 | Panvel, Raigarh | 160 | May 2025 | Ongoing | Dec 2031 | Not due yet |
| AsterP52000055662 | Village Bhokarpada, Raigarh | 144 | Apr 2024 | Ongoing | Dec 2031 | Not due yet |
| ArcadiaP52000080195 | Village Khalapur, Raigarh | 160 | May 2025 | Ongoing | Dec 2031 | Not due yet |
| MAYFLOWERP52000054617 | Village Bhokarpada, Raigarh | 144 | Feb 2024 | Ongoing | Dec 2029 | Not due yet |
| LAVENDERP52000054615 | Village Bhokarpada, Raigarh | 144 | Feb 2024 | Ongoing | Dec 2029 | Not due yet |
| EbonyP52000080165 | Village Bhokarpada, Raigarh | 178 | May 2025 | Ongoing | Dec 2029 | Not due yet |
| OrchidP52000050193 | Village Bhokarpada, Raigarh | 288 | Mar 2023 | Ongoing | Dec 2028 | Not due yet |
| IrisP52000050194 | Village Bhokarpada, Raigarh | 144 | Mar 2023 | Ongoing | Dec 2028 | Not due yet |
| EMPRESS HILL A B C and D WingsP51800052633 | Hiranandani Gardens Powai, Mumbai Suburban | 359 | Sep 2023 | Ongoing | Dec 2028 | Not due yet |
| AcaciaP52000050196 | village Bhokarapada, Raigarh | 288 | Mar 2023 | Ongoing | Dec 2028 | Not due yet |
| HIGHLAND A B C D AND E WingP51800029948 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2021 | Completed | Dec 2026 | Mar 2025 |
| REGENT HILL A B C D AND E WINGP51800018620 | HIRANANDANI GARDENS POWAI, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2025 | Apr 2022 |
| SorrentoP51800021706 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2019 | Completed | Dec 2024 | Jun 2022 |
| Castle Rock C and D WingP51800000405 | Hiranandani Gardens, Powai., Mumbai Suburban | - | Jul 2017 | Completed | Dec 2023 | Jun 2023 |
| ZeusP52000001064 | Bhokarpada, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| VestaP52000001078 | Bhokarpada, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| VENUSP52000001518 | Bhokarpada, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| OrionP52000002990 | Bhokarpada, Raigarh | - | Aug 2017 | Completed | Apr 2023 | Sep 2022 |
| HeraP52000001513 | Panvel, Raigarh | - | Jul 2017 | Completed | Apr 2023 | Sep 2022 |
| ARTEMISP52000001381 | Panvel, Raigarh | - | Jul 2017 | Completed | Apr 2023 | May 2021 |
| SeleneP52000002730 | Bhokarpada, Raigarh | - | Aug 2017 | Completed | Mar 2023 | May 2021 |
| FloraP52000001514 | Panvel, Raigarh | - | Jul 2017 | Completed | Mar 2023 | May 2021 |
| Retail CP52000001411 | Panvel, Raigarh | - | Jul 2017 | Completed | Mar 2022 | May 2021 |
| Retail AP52000000436 | PANVEL, Raigarh | - | Jul 2017 | Completed | Dec 2021 | Jul 2019 |
| HeliosP52000000261 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| AuroraP52000000256 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| AuraP52000000263 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| ArgusP52000000265 | PANVEL, Raigarh | - | Jul 2017 | Completed | Nov 2020 | Jul 2019 |
| MellonaP52000000260 | PANVEL, Raigarh | - | Jul 2017 | Completed | Oct 2020 | Jul 2019 |
| ClioP52000000184 | PANVEL, Raigarh | - | Jul 2017 | Completed | Oct 2020 | Jul 2019 |
| MinervaP52000000284 | PANVEL, Raigarh | - | Jul 2017 | Completed | Sep 2020 | Jul 2019 |
| HermesP52000000267 | PANVEL, Raigarh | - | Jul 2017 | Completed | Feb 2020 | Jul 2019 |
| AtlasP52000000262 | Panvel, Raigarh | - | Jul 2017 | Completed | Feb 2020 | Jul 2019 |
| Atlantis C WingP51800000143 | Hiranandani Gardens , Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Feb 2019 |
| Atlantis A and B WingP51800000154 | Hiranandani Gardens, Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Mar 2018 |
| Apollo and Athena | Survey No. 58-2 Part Village Bhokarpada Taluka Panvel District Raigad Maharashtra | 130 | - | Completed | Dec 2017 | Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 37 other registrations, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MARIGOLD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Village Bhokarpada5,900+ in Raigarh
ARIHANT ASPIRE PHASE I
ARIHANT ABODE LIMITED
Green Terraces, Godrej City, Panvel
CAROA PROPERTIES LLP
Nexspace, Godrej City, Panvel
CAROA PROPERTIES LLP
The Highlands, Godrej City, Panvel
CAROA PROPERTIES LLP
LA MER ONE
La Mer Homes LLP
Emperia Hill Crest
Emperia Builtcon
See every Raigarh project, with the district possession charts
Builder: Persipina Developers Private Limited
Persipina Developers Private Limited has 38 registrations on MahaRERA, including Atlas and Aurora. Its filings disclose 41 earlier MahaRERA projects: declares 26 of 26 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if MARIGOLD is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARIGOLD?
The registered promoter entity is Persipina Developers Private Limited, a company as per the filing. Its CIN U45200MH2007PTC172099 and GSTIN 27AAECP3315L1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARIGOLD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MARIGOLD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MARIGOLD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARIGOLD?
The professionals named in the filing: Architect: Gunisha Sanyal; Architect: Gunisha Sethi Sanyal; Engineer: Prashanth Nandulamattam; Chartered Accountant: Arun P Vaz & Company; Chartered Accountant: Rakesh Shah and Associates; Chartered Accountant: Manoj O. Shah & CO. Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARIGOLD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.