Home / Browse projects / Mumbai Suburban, Maharashtra / Castle Rock C and D Wing
Castle Rock C and D Wing
RG-MH-09296 · RERA P51800000405 · Last updated on MahaRERA portal: 3 Apr 2025
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 7 completed earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Castle Rock C and D Wing is a Residential / Group Housing project by HGP Community Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000405 on 15 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2023. 2 complaints are on record with the regulator.
At a glance
Project
- NameCastle Rock C and D Wing
- TypeResidential / Group Housing
- Location
- High Street
- Hiranandani Gardens
- Powai.
- Kurla
- Mumbai Suburban
- 400076
- Pincode400076
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800000405
- ReraGenie IDRG-MH-09296
Builder
- NameHGP Community Pvt. Ltd.
- Entity typeCompany
- CINU45201MH2016PTC274222
- GSTIN27AADCH8389P1ZL
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorsKamal N Hiranandani, Alka Hiranandani
- Other registrations8 more →
- Completed7 of 9
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Jul 2017
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed299 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Castle Rock C and D Wing | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Castle Rock C and D Wing: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed560
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| HGP Community Pvt. Ltd. | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000193403 | M/S.NISAN SCIENTIFIC PROCESS EQUIPMENTS PRIVATE LIMITED THROUGH ITS DIRECTOR MRS.PUNAM N NIKAM | M/S.HGP COMMUNITY PVT LTD | 08/07/2020 |
| CC006000000193406 | MR.NITIN S NIKAM AND MRS.PUNAM N NIKAM | M/S.HGP COMMUNITY PVT.LTD | 08/07/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Feb 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Nov 2020
Documents filed299
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 299 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Rera Update 31-03-2025 Castlerock CD.pdf | 3 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31-12-2024 Castlerock CD.pdf | 3 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30-09-2024 Castlerock CD.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30-09-2024 Castlerock CD.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30-06-2024 CastleRock CD.pdf | 9 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31-03-2024 Castlerock CD.pdf | 12 Apr 2024 |
| Details of encumbrancesFile: ICICI and HGP.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31122023 Castlerock CD.pdf | 5 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30062023 Castlerock CD.pdf | 15 Oct 2023 |
| Status of Formation of Legal EntityFile: Society Registration Certificate Castlerock.pdf | 10 Oct 2023 |
| Details of encumbrancesFile: HGP Castle Rock_.pdf | 28 Jul 2023 |
| CERSAI detailsFile: CERSAI CASTLEROCK.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30062023 Castlerock CD.pdf | 12 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31032023 Castlerock CD.pdf | 8 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Rera Update 31122022 Castlerock CD.pdf | 12 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Rera Update 30092022 Castlerock CD.pdf | 15 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Rera Update-30062022 CASTLE ROCK C D.pdf | 11 Jul 2022 |
| OtherFile: notesheet.pdf | 27 Apr 2022 |
| OtherFile: Completion Certificate.pdf | 27 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: RERA CASTLE ROCK C D as on 31032022.pdf | 21 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: RERA Sold Unsold Data Castle Rock C D Wing.pdf | 5 Jan 2022 |
| Details of encumbrancesFile: HGP CERSAI CERTIFICATE and REPORT.pdf | 26 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Rera Sold unsold data Castle Rock C and D wing.pdf | 19 Oct 2021 |
| Details of encumbrancesFile: HGP Encumbrance Castlerock Revised Certificate.pdf | 14 Oct 2021 |
| Details of encumbrancesFile: Encumbrance HGP Castlerock AB and CD.pdf | 7 Oct 2021 |
| Status of ConveyanceFile: Castle Rock CD.pdf | 21 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form V CASTLEROCK CD.pdf | 13 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold data Castle Rock C D.pdf | 4 Sep 2021 |
| Status of Formation of Legal EntityFile: Society Formation Letter Castle Rock C D.pdf | 31 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Rera Update Castle Rock CD wing 31052021.pdf | 25 Jun 2021 |
| OtherFile: RERA AC Closure statement Castlerock C D.pdf | 16 Mar 2021 |
| Building plan approvalFile: 2 OF 11.pdf | 28 Dec 2020 |
| Building plan approvalFile: 3 OF 11.pdf | 28 Dec 2020 |
| Building plan approvalFile: 4 OF 11.pdf | 28 Dec 2020 |
| Building plan approvalFile: 5 OF 11.pdf | 28 Dec 2020 |
| Building plan approvalFile: 6 OF 11.pdf | 28 Dec 2020 |
| Building plan approvalFile: 7 OF 11.pdf | 28 Dec 2020 |
| Building plan approvalFile: 8 OF 11.pdf | 28 Dec 2020 |
| Building plan approvalFile: 9 OF 11.pdf | 28 Dec 2020 |
| Building plan approvalFile: 10 OF 11.pdf | 28 Dec 2020 |
| Building plan approvalFile: 11 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 2 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 3 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 4 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 5 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 6 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 7 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 8 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 9 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 10 OF 11.pdf | 28 Dec 2020 |
| Building Plan Approval (IOD)File: 11 OF 11.pdf | 28 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch FORM 1 CASTLE ROCK CD wing OC.pdf | 14 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CASTLE ROCK C D wing OC form 2.pdf | 14 Dec 2020 |
| Certificates of CA (Form 3)File: Castlerock CD wing CA certificate OC Final.pdf | 14 Dec 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECT CERTIFICATE CASTLE ROCK CD pdf.pdf | 28 Nov 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CASTLEROCK CD wing OC 26112020.pdf | 27 Nov 2020 |
| OtherFile: Architect Certificate _Castlerock CD_ 95 percent.pdf | 12 Nov 2020 |
| Certificates of CA (Form 5)File: Castlerock CD Form V.pdf | 28 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CASTLE ROCK CD.pdf | 15 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CASTLE ROCK CD Engr.pdf | 15 Sep 2020 |
| Certificates of CA (Form 3)File: Castlerock CD CA.pdf | 15 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Castle rock full CC 30072020.pdf | 3 Aug 2020 |
| Building plan approvalFile: 1 OF 14 LAST BLDG APPROVAL 21072020.pdf | 29 Jul 2020 |
| Building plan approvalFile: 2 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 3 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 4 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 5 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 6 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 7 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 8 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 9 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 10 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 11 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 12 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 13 OF 14.pdf | 29 Jul 2020 |
| Building plan approvalFile: 14 OF 14.pdf | 29 Jul 2020 |
| Building Plan Approval (IOD)File: 1 OF 14 LAST BLDG APPROVAL 21072020.pdf | 29 Jul 2020 |
| Building Plan Approval (IOD)File: 2 OF 14.pdf | 29 Jul 2020 |
| Building Plan Approval (IOD)File: 3 OF 14.pdf | 29 Jul 2020 |
| Building Plan Approval (IOD)File: 4 OF 14.pdf | 29 Jul 2020 |
Promoter's earlier projects8
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| EMPRESS HILL A B C and D WingsP51800052633 | Hiranandani Gardens Powai, Mumbai Suburban | 359 | Sep 2023 | Ongoing | Dec 2028 | Not due yet |
| HIGHLAND A B C D AND E WingP51800029948 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2021 | Completed | Dec 2026 | Mar 2025 |
| REGENT HILL A B C D AND E WINGP51800018620 | HIRANANDANI GARDENS POWAI, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2025 | Apr 2022 |
| REGENT HILL A B C D AND E WINGP51800018620 | HIRANANDANI GARDENS POWAI, Mumbai Suburban | - | Nov 2018 | Completed | Jun 2025 | Mar 2022 |
| SorrentoP51800021706 | HIRANANDANI GARDENS, POWAI, Mumbai Suburban | - | Jul 2019 | Completed | Dec 2024 | Jun 2022 |
| Atlantis C WingP51800000143 | Hiranandani Gardens , Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Feb 2019 |
| Atlantis A and B WingP51800000154 | Hiranandani Gardens, Powai, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2019 | Mar 2018 |
| Adonia A and B Wing | Sector IX Hiranandani Gardens Powai Mumbai 400076 | 104 | - | Completed | Dec 2016 | Jul 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 299 filed documents as one ZIP, foldered, with a manifest
Keep Castle Rock C and D Wing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hiranandani Gardens, Powai.6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 74 registered projects within 2 km.
EMPRESS HILL A B C and D Wings
HGP Community Pvt. Ltd.
MARS - WING - B
SUNCITY HOUSING
MARS- SUNCITY HOUSING PHASE II
SUNCITY HOUSING
MARS WING-C
Sun City Housing
SHREE KRISHNA Wing C,D and E
Shreem Properties
ISLE OF CALM TOWER 1
SUNRISE HOUSING
See every Mumbai Suburban project, with the district possession charts
Builder: HGP Community Pvt. Ltd.
HGP Community Pvt. Ltd. has 9 registrations on MahaRERA, including Atlantis C Wing and Atlantis A and B Wing. Its filings disclose 8 earlier MahaRERA projects: declares 7 of 7 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Castle Rock C and D Wing is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Castle Rock C and D Wing?
The registered promoter entity is HGP Community Pvt. Ltd., a company as per the filing. Its CIN U45201MH2016PTC274222 and GSTIN 27AADCH8389P1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Castle Rock C and D Wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Castle Rock C and D Wing?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Castle Rock C and D Wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Castle Rock C and D Wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback