Home / Browse projects / Pune, Maharashtra / RAHEJA STERLING - TOWER 3

Completed Litigation declared Residential / Group Housing project

RAHEJA STERLING - TOWER 3

By CAVALCADE PROPERTIES PVT LTD

RG-MH-65055 · RERA P52100052201 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • Rs 250.00 crore secured on the land, in favour of HDFC LIMITED

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 97%
88 of 176Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

RAHEJA STERLING - TOWER 3 is a Residential / Group Housing project by CAVALCADE PROPERTIES PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100052201 on 31 Jul 2023. The registration is recorded completed; possession was promised by 30 Nov 2026. 88 of the 176 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameRAHEJA STERLING - TOWER 3
  • TypeResidential / Group Housing
  • Location
    • NIBM Road
    • Off NIBM
    • MOHAMMADWADI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • RERA no.P52100052201
  • ReraGenie IDRG-MH-65055

Builder

  • NameCAVALCADE PROPERTIES PVT LTD
  • Entity typeCompany
  • CINU70100MH2005PTC154307
  • DirectorsARVIND DIGAMBAR PRABHU, ANAND PRABHU CHANDAN
  • Other registrations11 more →
  • Completed3 of 12
  • Declared earlier projects9 →

Key dates

this monthRegisteredJul 2023PromisedNov 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2023
  • Promised completion30 Nov 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

50%88 of 176 units booked

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAHEJA STERLING - TOWER 3NA25221760176

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 97%.

RAHEJA STERLING - TOWER 3: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed176

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots176
Closed/Covered176

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area738 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHDFC LIMITED
Secured amountRs 250.00 crore
Declared on26 Jun 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI16342.76
Proposed, not sanctioned16,343 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort, Mumbai 400001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLaxman Thite AOP
EngineerSTRUDCOM CONSULTANTS PVT. LTD.
EngineerGururaj Korlahalli
Chartered AccountantAKPJ & Associates
Chartered AccountantSubhash Doshi
PartnerRole in project
CAVALCADE PROPERTIES PVT LTD-

Litigation declared4

CaseCourtStatus
385/2015Civil Judge Senior Division PuneOngoing
1299/2022Civil Judge Senior Division PuneOngoing
577/2021Additional Collector PuneClosed
1299/20221299Ongoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A T3 Raheja Sterling.pdf30 Jun 2026
Form 5 (FY 2024-2025)File: Signed_KGS_Certificate_Phase IVC_Tower T3_ Form 5.pdf30 Sep 2025
Occupational CertificateFile: Occupancy Certificate A1 A2 A3.pdf16 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A T3 RS.pdf27 Jun 2025
Home Buyer /Allottee Grievance Redressal CellFile: A3.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: A3 Sterling.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration T3 RS.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration T3 RS.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration T3 RS.pdf14 Apr 2025
Layout approvalFile: Layout Phase 6.pdf21 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout Phase 6.pdf21 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Self Declaration T3 RS.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration T3 RS.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Self Declaration T3 RS.pdf20 Feb 2025
Details of encumbrances concerned to FinanceFile: Litigation update A3.pdf20 Jan 2025
Details of encumbrances concerned to LegalFile: Litigation update A3.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: A3.pdf16 Jan 2025
Home Buyer /Allottee Grievance Redressal CellFile: A3 Sterling.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 A3.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 3.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 A3.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: A-3.pdf18 Oct 2024
Home Buyer /Allottee Grievance Redressal CellFile: A3.pdf18 Oct 2024
Form 5 (FY 2023-2024)File: Form 5 T3.pdf30 Sep 2024
Home Buyer /Allottee Grievance Redressal CellFile: A3 Grievance Redressal.pdf19 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: A3 Status of Complaints.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower 3.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower 3.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: A3.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower A3.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: T3.pdf29 May 2024
Disclosure of sold/ booked inventoryFile: A3 001.pdf26 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: A3 Grievance Redressal.pdf26 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: A3 Status of Complaints.pdf26 Apr 2024
Other - FinanceFile: No Withdrawal Self Certification A3 RS.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Tower 3.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Tower 3.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Tower 3.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: A3.pdf19 Jan 2024
Building plan approvalFile: Floor Plan 1.pdf21 Jun 2023
Building plan approvalFile: Floor Plan 2.pdf21 Jun 2023
Layout approvalFile: DP Layout 16092021.pdf21 Jun 2023
Layout approvalFile: Layout.pdf21 Jun 2023
Building plan approvalFile: 02 - 25_compressed.pdf21 Jun 2023
Building plan approvalFile: 03 - 25_compressed.pdf21 Jun 2023
Building plan approvalFile: 04 - 25_compressed.pdf21 Jun 2023
Copy of Layout Approval (in case of layout)File: DP Layout 16092021.pdf21 Jun 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf21 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan 1.pdf21 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan 2.pdf21 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 02 - 25_compressed.pdf21 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 03 - 25_compressed.pdf21 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 04 - 25_compressed.pdf21 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 Jun 2023
Declaration about Commencement CertificateFile: Declaration for CC.pdf21 Jun 2023
Other - TechnicalFile: Declaration area clarification.pdf21 Jun 2023
Copy of the legal title reportFile: TC Supplement 1.pdf7 Jun 2023
CERSAI detailsFile: Declaration CERSAI with report.pdf2 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200270344230_For_Asset_Based_Search_01_06_2023_17_03_18_386.pdf2 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Clarification Form 3.pdf2 Jun 2023
PAN CardFile: Self Declaration.pdf31 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T3 RERA registration 26523.pdf26 May 2023
CERSAI detailsFile: CERSAI.pdf25 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 12 Declaration for Bank Account.pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 May 2023
Copy of the legal title reportFile: MahaRERA TC A3 16052023.pdf23 May 2023
Copy of the legal title reportFile: TR 1.pdf23 May 2023
Copy of the legal title reportFile: TR 2.pdf23 May 2023
Copy of the legal title reportFile: TR 3.pdf23 May 2023
Copy of the legal title reportFile: TR 4.pdf23 May 2023
Copy of the legal title reportFile: TR 5.pdf23 May 2023
Copy of the legal title reportFile: TC Supplement 2.pdf23 May 2023
Copy of the legal title reportFile: TC Supplement 3.pdf23 May 2023
Building plan approvalFile: BP Layout 30122021.pdf18 May 2023
PAN CardFile: PAN CPPL.pdf18 May 2023
Details of encumbrances concerned to FinanceFile: 4 Declaration Finance.pdf18 May 2023
Details of encumbrances concerned to FinanceFile: 3 Declaration Legal.pdf18 May 2023
Details of encumbrances concerned to LegalFile: 4 Declaration Finance.pdf18 May 2023

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise6 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
T4A named Celina of Raheja Galaxy in RV PremiereP52100079576NIBM, Pune66Mar 2025OngoingMar 2030Not due yet
High-Street of Raheja Galaxy in RVPP52100080368NIBM, Pune33May 2025OngoingMar 2029Not due yet
T1 named Helios of Raheja Galaxy in RV PremiereP52100077444NIBM, Pune64Aug 2024OngoingNov 2028Not due yet
T3 named Altair of Raheja Galaxy in RV PremiereP52100054163NIBM, Pune156Dec 2023OngoingJul 2028Not due yet
T2 named Constella of Raheja Galaxy in RV PremiereP52100054218NIBM, Pune156Jan 2024OngoingJul 2028Not due yet
T11 named as Raheja Stellar in RV PremiereP52100033399Off NIBM, Pune209Feb 2022OngoingDec 2026Not due yet
T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV PremiereP52100024187NIBM Road, Pune168Jan 2020CompletedMar 2026Jan 2024
T9 Chronos and T10 Supremus Phase 1 Of Raheja Reserve being Buildings T7 T8 T9 T10 in RV PremiereP52100021356NIBM, Pune-Jun 2019CompletedSep 2025Oct 2022
T7 named Belvedere phase 3 of Raheja Reserve being buildings T7 T8 T9 T10 in RV PremiereP52100030551NIBM, Pune168Aug 2021CompletedMar 2025Jan 2024

How this compares with Pune

50%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAHEJA STERLING - TOWER 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Off NIBM13,700+ in Pune

Builder: CAVALCADE PROPERTIES PVT LTD

CAVALCADE PROPERTIES PVT LTD has 12 registrations on MahaRERA, including RAHEJA STERLING - TOWER 1 and RAHEJA STERLING - TOWER 2. Its filings disclose 9 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RAHEJA STERLING - TOWER 3 is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAHEJA STERLING - TOWER 3?

The registered promoter entity is CAVALCADE PROPERTIES PVT LTD, a company as per the filing. Its CIN U70100MH2005PTC154307 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAHEJA STERLING - TOWER 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAHEJA STERLING - TOWER 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAHEJA STERLING - TOWER 3?

The professionals named in the filing: Architect: Laxman Thite AOP; Engineer: STRUDCOM CONSULTANTS PVT. LTD.; Engineer: Gururaj Korlahalli; Chartered Accountant: AKPJ & Associates; Chartered Accountant: Subhash Doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAHEJA STERLING - TOWER 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAHEJA STERLING - TOWER 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAHEJA STERLING - TOWER 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.