T3 named Altair of Raheja Galaxy in RV Premiere

By CAVALCADE PROPERTIES PVT LTD

RG-MH-33818 · RERA P52100054163 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 70%
16 of 162Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

T3 named Altair of Raheja Galaxy in RV Premiere is a Residential / Group Housing project by CAVALCADE PROPERTIES PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100054163 on 29 Dec 2023. Possession is promised by 31 Jul 2028. 146 of the 162 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameT3 named Altair of Raheja Galaxy in RV Premiere
  • TypeResidential / Group Housing
  • Location
    • NIBM Road
    • NIBM
    • MOHAMMADWADI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • RERA no.P52100054163
  • ReraGenie IDRG-MH-33818

Builder

  • NameCAVALCADE PROPERTIES PVT LTD
  • Entity typeCompany
  • CINU70100MH2005PTC154307
  • DirectorsARVIND DIGAMBAR PRABHU, ANAND PRABHU CHANDAN
  • Other registrations11 more →
  • Completed3 of 12
  • Declared earlier projects9 →

Key dates

this monthRegisteredDec 2023PromisedJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Dec 2023
  • Promised completion31 Jul 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed111 files

Current status

90%146 of 162 units booked
39.8%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T3 named Altair of Raheja Galaxy in RV PremiereNA33281620162

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.

T3 named Altair of Raheja Galaxy in RV Premiere: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)70%
Plinth59%
Stilt Floor0%
Slabs of Super Structure59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks28%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed278

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots278
Closed/Covered278

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,128 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI27957.39
Proposed, not sanctioned25,181 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Dhannur House, 15, Sir P M Road Fort Mumbai
Estimated costRs 133.57 cr
Cost incurredRs 53.11 cr
Work done39.76%
BuildingWingEstimatedIncurred
T3 named Altair of Raheja Galaxy in RV PremiereNARs 107.98 crRs 17.47 cr
-NARs 25.59 crRs 35.63 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMalwadkar Architects Pvt. Ltd.
ArchitectSharad Kumbhar
EngineerShekhar Ghate
EngineerNilesh Soni
Chartered AccountantK G Somani & Co LLP
Chartered AccountantSubhash Doshi
PartnerRole in project
CAVALCADE PROPERTIES PVT LTD-

Litigation declared4

CaseCourtStatus
40/2021Additional Commissioner PuneClosed
40/2021Additional CommissionerClosed
1774/2023Civil Judge Senior DivisionOngoing
03/2025Circle OfficerClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 T3 Altair.pdf9 Jul 2026
Withdrawal Update Form 2File: Form 2 T3 Altair.pdf9 Jul 2026
Withdrawal Update Form 3File: Form 3 T3 Altair.pdf9 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A T3 Altair.pdf24 Jun 2026
Layout approvalFile: Layout highlighted.pdf8 May 2026
Withdrawal Update Form 1File: Form 1 T3 Altair 31032025.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2 T3 Altair 15072025.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3 T3 Altair 25072025.pdf15 Apr 2026
Layout approvalFile: Layout.pdf9 Apr 2026
Building plan approvalFile: Building Plan.pdf9 Apr 2026
Building plan approvalFile: Floor Plan LG and UG.pdf9 Apr 2026
Building plan approvalFile: Floor Plan Podium 1 and Podium 2.pdf9 Apr 2026
Building plan approvalFile: Floor Plan Podium 3.pdf9 Apr 2026
Building plan approvalFile: Floor Plan Ground and 1st Floor.pdf9 Apr 2026
Building plan approvalFile: Floor Plan 2 to 27 floor.pdf9 Apr 2026
Building plan approvalFile: Section.pdf9 Apr 2026
Building plan approvalFile: Elevation.pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1 T3 Altair 31032025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 T3 Altair 15072025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 T3 Altair 25072025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 T3 Altair.pdf8 Oct 2025
Withdrawal Update Form 2File: Form 2 T3 Altair 19072024.pdf8 Oct 2025
Withdrawal Update Form 3File: Form 3 T3 Altair 25072025.pdf8 Oct 2025
Form 5 (FY 2024-2025)File: Signed_KGS_Certificate_Phase IVC_Tower T3_ Form 5.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A T3 Altair.pdf27 Jun 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Condo Declaration T2 and T3.pdf17 Apr 2025
CERSAI detailsFile: CERSAI Altair.pdf17 Apr 2025
Home Buyer /Allottee Grievance Redressal CellFile: T3 Altair.pdf17 Apr 2025
Layout approvalFile: Layout Phase 4.pdf15 Apr 2025
Details of encumbrances concerned to FinanceFile: Litigation update T2 T3 T7 T8 T11.pdf15 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance concerned to Finance T3.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Layout Phase 4.pdf15 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate phase 4.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: T3 Altair.pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: Litigation update T2 T3 T7 T8 T11.pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance concerned to Finance T3.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration T3 Altair.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration T3 Altair.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration T3 Altair.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: T3.pdf16 Jan 2025
Home Buyer /Allottee Grievance Redressal CellFile: T3 Altair.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 T3 Altair.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T3 Altair compressed.pdf31 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 T3 Altair.pdf31 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 T3 Altair.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration T3 Altair.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration T3 Altair.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration T3 Altair.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: T-3.pdf18 Oct 2024
Home Buyer /Allottee Grievance Redressal CellFile: T3 Altair.pdf18 Oct 2024
Form 5 (FY 2023-2024)File: Form 5 T3 Altair.pdf30 Sep 2024
Proforma of Agreement for saleFile: RERA AFS T2 and T3.pdf13 Aug 2024
Details of encumbrances concerned to FinanceFile: Litigation update T3.pdf18 Jul 2024
Details of encumbrances concerned to LegalFile: Litigation update T3.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Tower 3 Altair.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Altair.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: T3.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T3 named Altair.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: T3 Altair Quality Assurance Certificate.pdf18 Jun 2024
Disclosure of sold/ booked inventoryFile: T3_20240417162058.pdf25 Apr 2024
Other - FinanceFile: No Withdrawal Self Certification T3 Altair.pdf20 Apr 2024
Proforma of Agreement for saleFile: AFS T3.pdf19 Jan 2024
Copy of the legal title reportFile: Title Report.pdf22 Dec 2023
Proforma of Agreement for saleFile: RERA AFS 21122023 clean final.pdf22 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation with Schedule.pdf22 Dec 2023
Deviation Report with respect to model copy of AgreementFile: RERA AFS 21122023 highlighted clean.pdf22 Dec 2023
Other - LegalFile: NCLT Order with Scheme of Demerger.pdf22 Dec 2023
Other - LegalFile: Declaration with Index II and NCLT Order.pdf22 Dec 2023
Other - LegalFile: Scheme of Arrangement Demerger.pdf22 Dec 2023
Details of encumbrances concerned to FinanceFile: Declaration with Index II and NCLT Order.pdf14 Dec 2023
Details of encumbrances concerned to LegalFile: Declaration with Index II and NCLT Order.pdf14 Dec 2023
Building plan approvalFile: 2 Podium, Lower and Upper Ground Floor Plan com.pdf6 Dec 2023
Building plan approvalFile: 3 Podium 2 and 3.pdf6 Dec 2023
Building plan approvalFile: 1 First and Ground Podium Floor comp.pdf6 Dec 2023
Building plan approvalFile: 4 Floor Plan T3.pdf6 Dec 2023
Building plan approvalFile: 4 Elevation comp.pdf6 Dec 2023
Building plan approvalFile: 5 Section comp.pdf6 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Podium, Lower and Upper Ground Floor Plan com.pdf6 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 3 Podium 2 and 3.pdf6 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 First and Ground Podium Floor comp.pdf6 Dec 2023

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise5 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
T4A named Celina of Raheja Galaxy in RV PremiereP52100079576NIBM, Pune66Mar 2025OngoingMar 2030Not due yet
High-Street of Raheja Galaxy in RVPP52100080368NIBM, Pune33May 2025OngoingMar 2029Not due yet
T1 named Helios of Raheja Galaxy in RV PremiereP52100077444NIBM, Pune64Aug 2024OngoingNov 2028Not due yet
T2 named Constella of Raheja Galaxy in RV PremiereP52100054218NIBM, Pune156Jan 2024OngoingJul 2028Not due yet
T11 named as Raheja Stellar in RV PremiereP52100033399Off NIBM, Pune209Feb 2022OngoingDec 2026Not due yet
T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV PremiereP52100024187NIBM Road, Pune168Jan 2020CompletedMar 2026Jan 2024
T9 Chronos and T10 Supremus Phase 1 Of Raheja Reserve being Buildings T7 T8 T9 T10 in RV PremiereP52100021356NIBM, Pune-Jun 2019CompletedSep 2025Oct 2022
T7 named Belvedere phase 3 of Raheja Reserve being buildings T7 T8 T9 T10 in RV PremiereP52100030551NIBM, Pune168Aug 2021CompletedMar 2025Jan 2024

How this compares with Pune

90%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep T3 named Altair of Raheja Galaxy in RV Premi on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NIBM13,700+ in Pune

Builder: CAVALCADE PROPERTIES PVT LTD

CAVALCADE PROPERTIES PVT LTD has 12 registrations on MahaRERA, including RAHEJA STERLING - TOWER 1 and RAHEJA STERLING - TOWER 2. Its filings disclose 9 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 12 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if T3 named Altair of Raheja Galaxy in RV Premiere is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of T3 named Altair of Raheja Galaxy in RV Premiere?

The registered promoter entity is CAVALCADE PROPERTIES PVT LTD, a company as per the filing. Its CIN U70100MH2005PTC154307 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in T3 named Altair of Raheja Galaxy in RV Premiere?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for T3 named Altair of Raheja Galaxy in RV Premiere?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at T3 named Altair of Raheja Galaxy in RV Premiere?

The professionals named in the filing: Architect: Malwadkar Architects Pvt. Ltd.; Architect: Sharad Kumbhar; Engineer: Shekhar Ghate; Engineer: Nilesh Soni; Chartered Accountant: K G Somani & Co LLP; Chartered Accountant: Subhash Doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in T3 named Altair of Raheja Galaxy in RV Premiere?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About T3 named Altair of Raheja Galaxy in RV Premiere. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save T3 named Altair of Raheja Galaxy in RV Premi to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.