Home / Browse projects / Pune, Maharashtra / T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere

Registration lapsed Litigation declared Residential / Group Housing project

T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere

By Cavalcade Properties Private Limited

RG-MH-15244 · RERA P52100024187 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Litigation declared, 6 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
0 of 168Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 177 documents Report an error

T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere is a Residential / Group Housing project by Cavalcade Properties Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100024187 on 24 Jan 2020. Possession was promised by 30 Mar 2026 and is now 7 months past that date. 168 of the 168 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameT8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere
  • TypeResidential / Group Housing
  • Location
    • NIBM Road
    • MOHAMMADWADI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024187
  • ReraGenie IDRG-MH-15244

Builder

  • NameCavalcade Properties Private Limited
  • Entity typeCompany
  • CINU70100MH2005PTC154307
  • Company SecretorySHARMIN VALI PATEL
  • DirectorsArvind Prabhu, ANAND CHANDAN
  • Other registrations7 more →
  • Completed6 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

7 months past promisethis monthRegisteredJan 2020PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Jan 2020
  • Promised completion30 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed177 files

Current status

100%168 of 168 units booked
96.6%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T8- LuxuriantNA34281680168

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

T8- Luxuriant: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed224

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots224
Closed/Covered224

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,754 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Sep 2024

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI17235.96
Proposed, not sanctioned17,236 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Limited Ground Floor Jahangir Building M G Road Fort Mumbai 400001
Estimated costRs 83.92 cr
Cost incurredRs 81.10 cr
Work done96.64%
BuildingWingEstimatedIncurred
T8- LuxuriantNARs 76.22 crRs 75.57 cr
-NARs 7.70 crRs 5.52 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMayur Jadhav
ArchitectMalwadkar Architects Private Limited
EngineerJayadrath M Gaikwad
EngineerJ.V. INAMDAR
EngineerShagaf Nallamandu
Chartered AccountantS N Doshi and Associates
Chartered AccountantA K P J & ASSOCIATES
Chartered AccountantG.M. kapadia &Co.
Chartered AccountantK G Somani & Co LLP
PartnerRole in project
Cavalcade Properties Private Limited-

Litigation declared6

CaseCourtStatus
5647/2016/2016High Court MumbaiClosed
2016/2016Ministry of Urban Development DepartmentClosed
38/2021Additional Collector PuneClosed
40/2021Additional Commissioner PuneOngoing
1774/2023Civil Judge Senior Division PuneOngoing
40/2021Additional CommissionerOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000258868INORBIT MALLS INDIA PRIVATE LIMITEDSURJIT KAUR16/05/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Feb 2024

Documents filed177

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A T8.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1 T8.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 T8.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 19022024.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 T8.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 T8.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf19 Jan 2026
Withdrawal Update Form 1File: Form 1 T8.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2 T8.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Signed_KGS_Certificate_Phase IV_Tower 8_ Form 5.pdf24 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A T8.pdf27 Jun 2025
Home Buyer /Allottee Grievance Redressal CellFile: T8.pdf17 Apr 2025
Details of encumbrances concerned to FinanceFile: Litigation update T2 T3 T7 T8 T11.pdf15 Apr 2025
Details of encumbrances concerned to FinanceFile: Layout Phase 4.pdf15 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate phase 4.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: T8 Luxuriant.pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: Litigation update T2 T3 T7 T8 T11.pdf15 Apr 2025
Details of encumbrances concerned to LegalFile: Layout Phase 4.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration T8.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration T8.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration T8.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: T8.pdf16 Jan 2025
Home Buyer /Allottee Grievance Redressal CellFile: T8 Luxuriant.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: T-8.pdf18 Oct 2024
Home Buyer /Allottee Grievance Redressal CellFile: T8.pdf18 Oct 2024
Form 5 (FY 2023-2024)File: Form 5 T8.pdf30 Sep 2024
Home Buyer /Allottee Grievance Redressal CellFile: T8 Grievance Redressal.pdf19 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: T8 Status of Complaints.pdf19 Jul 2024
Details of encumbrances concerned to FinanceFile: Litigation update T7 T8 T11.pdf18 Jul 2024
Details of encumbrances concerned to LegalFile: Litigation update T7 T8 T11.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: T8.pdf18 Jul 2024
Status of ConveyanceFile: Conveyance Declaration T8.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A T8 Quality Assurance certificate.pdf29 May 2024
Disclosure of sold/ booked inventoryFile: T8_20240417161854.pdf26 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: T8 Grievance Redressal.pdf26 Apr 2024
Home Buyer /Allottee Grievance Redressal CellFile: T8 Status of Complaints.pdf26 Apr 2024
Declaration in FORM BFile: Form B Tower 8.pdf29 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC-1067-23 T7-T8.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 T8.pdf19 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 T8.pdf19 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Inorbit Luxuriant Tower 8 - Dec 2023.pdf19 Feb 2024
Copy of the legal title reportFile: Title Report 30082023.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: T8.pdf19 Jan 2024
Details of encumbrancesFile: Mortgage Update T7 T8 T9 T10 and T11.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2 T8 March.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_T8.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 T8 March.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 T8 10 July 2023 as on 31 March.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: T8_.pdf19 Oct 2023
Proforma of Agreement for saleFile: T8 RERA AFS.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form_5_March23_T8.pdf29 Sep 2023
Disclosure of sold/ booked inventoryFile: T8-LUXURIANT_20230712202623.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A T8.pdf13 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A T7.pdf31 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A T8.pdf31 May 2023
Disclosure of sold/ booked inventoryFile: T8.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: T8-Luxuriant -INVENTORY.pdf23 Mar 2023
Disclosure of sold/ booked inventoryFile: T8-LUXURIANT.pdf20 Feb 2023
Proforma of Agreement for saleFile: T8 RERA AFS ground floor apts_OC update_RERA.pdf20 Jan 2023
Proforma of Agreement for saleFile: T8 RERA AFS Upper floor apts_OC update_RERA.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Tower 8.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: T8 SOLD-BOOKED INVENTORY.pdf20 Dec 2022
Disclosure of sold/ booked inventoryFile: T8_001.pdf15 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 T8 Inorbit.pdf18 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form-2_T8_IMIPL.pdf18 Oct 2022
Disclosure of sold/ booked inventoryFile: T8- RERA SOLD-BOOKED INVENTORY.pdf17 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: T_8Inorbit Malls India Private Limited_.pdf30 Sep 2022
Disclosure of sold/ booked inventoryFile: T8_001.pdf13 Sep 2022
Disclosure of sold/ booked inventoryFile: T8-Luxuriant.pdf9 Aug 2022
Proforma of Allotment letterFile: T8 RERA AFS Upper floor 11072022.pdf28 Jul 2022
Disclosure of sold/ booked inventoryFile: T8 SOLDBOOKED INVENTORY.pdf14 Jul 2022
Disclosure of sold/ booked inventoryFile: T8 SOLDBOOKED INVENTORY_001.pdf8 Jul 2022
Details of encumbrancesFile: T8 CERSAI.pdf6 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-T8-Luxurient.pdf6 Jul 2022
CERSAI detailsFile: CERSAI IMIPL.pdf6 Jul 2022
OtherFile: Self Declaration_Demerger-T8-Luxurient.pdf6 Jul 2022
Disclosure of sold/ booked inventoryFile: T8 SOLDBOOKED INVENTORY_001.pdf8 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory disclosure _T8.pdf12 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert T8 Dec 21.pdf2 May 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
T13 Phase of the project comprising Building T12 and T1327 Oblique 4 part and others part57CompletedDec 2017Late, Feb 2018
RAHEJA VISTAS BUILDING B2S No 27 Hissa No 1 Oblique B Plus 2 Plus 3 Plot B Part of Village Mohammadwadi Taluka Haveli District Pune44CompletedDec 2016Late, Jun 2018
T5/T6VILLAGE MOHAMMADWADI TALUKA HAVELI DISTRICT PUNE304CompletedSep 2016Late, Dec 2016
RAHEJA VISTAS F5 PHASE IIIVILLAGE MOHAMMADWADI TALUKA HAVELI DISTRICT PUNE43CompletedSep 2014Late, Jul 2017

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep T8 named LUXURIANT Phase 2 of Raheja Reserve on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NIBM Road13,700+ in Pune

2 kmT8 named LUXURIANT PhaseCompleted 116Lapsed / revoked 116Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: Cavalcade Properties Private Limited

Cavalcade Properties Private Limited has 8 registrations on MahaRERA, including RAHEJA VISTAS BUILDING B2 and T13 - PHASE OF THE PROJECT COMPRISING BUILDING T12 AND T13. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere?

The registered promoter entity is Cavalcade Properties Private Limited, a company as per the filing. Its CIN U70100MH2005PTC154307 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere?

The professionals named in the filing: Architect: Mayur Jadhav; Architect: Malwadkar Architects Private Limited; Engineer: Jayadrath M Gaikwad; Engineer: J.V. INAMDAR; Engineer: Shagaf Nallamandu; Chartered Accountant: S N Doshi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About T8 named LUXURIANT Phase 2 of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save T8 named LUXURIANT Phase 2 of Raheja Reserve to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.