The Atrium

By Arhumashtika Life Spaces

RG-MH-05639 · RERA P52100076708 · Last updated on MahaRERA portal: 17 Sep 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 4 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
224 of 396Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

The Atrium is a Commercial project by Arhumashtika Life Spaces in Pune, Maharashtra, registered with MahaRERA as P52100076708 on 21 Jun 2024. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 172 of the 396 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameThe Atrium
  • TypeCommercial
  • Location
    • Mohammadwadi
    • Pune
    • Haveli
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100076708
  • ReraGenie IDRG-MH-05639

Builder

  • NameArhumashtika Life Spaces
  • Entity typePartnership
  • PartnersSkywards Ashtika Lifestyle LLP, Ranveer Constructions, Amruta Developers, Borade Associates, Pratik Traders, Nivaan and Brothers Construction LLP

Key dates

this monthRegisteredJun 2024First promiseDec 2027Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jun 2024
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings1 building record
  • Documents filed128 files

Current status

43%172 of 396 units booked
57.2%Work done, per cost certificate

Figures as on 17 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Commercial BuildingNA330396396

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

Commercial Building: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed716

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots716
Closed/Covered526
Open Space190

Land and ownership32

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,072 sq m
Land owned byThe promoter, with other names on the file
Named landowners32
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025
LandownerVillageDistrict
Smt Mathura Sadashiv Ghule-Pune
Shri Shrinath Sadashiv Ghule-Pune
Shri Sandeep Sadashiv Ghule-Pune
Smt Jayashree Shashikant Nimhan-Pune
Shri Vijay Baban Kondhare-Pune
Shri Madhukar Baban Kondhare-Pune
Smt Subhadrabai Baban Kondhare-Pune
Smt Suman Dagduseth Taware-Pune
Smt Monika Santosh Magar-Pune
Shri Kantaram Babasaheb Wagaskar-Pune
Smt Chaya Nivrutti Ghule-Pune
Shri Vasant Mahadu Ghule-Pune
Shri Shantaram Babasaheb Wagaskar-Pune
Shri Shrikant Vasant Ghule-Pune
Kumari Bhagyashree Vasant Ghule-Pune
Smt RajashreeTulsiram Charwad-Pune
Smt Archana Vinod Landge-Pune
Smt Vidya Vikas Kale-Pune
Smt Muktabai Babasaheb Wagaskar-Pune
Shri Jaywant Babasaheb Wagaskar-Pune
Shri Bhausaheb Babasaheb Wagaskar-Pune
Kumar Sanket Nivrutti Ghule-Pune
Smt Babi Vasant Ghule-Pune
Kumari Neha Murlidhar Ghule-Pune
Kumar Yugesh Vikas Kale-Pune
Smt. Minal Murlidhar Ghule-Pune
Shri. Hemant Dagduseth Taware-Pune
Kumari Snehal Nivrutti Ghule-Pune
Shri Sadashiv Bandu Ghule-Pune
Shri Murlidhar Bandu Ghule-Pune
Shri Nivrutti Bandu Ghule-Pune
Smt. Shubhangi Shrikant Masal-Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI18181.39
Proposed, not sanctioned11,194 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOffice No 1, Plot No 55/56/57/58 Lalwani Plaza A Wing Sakore Nagar Pune
Estimated costRs 41.50 cr
Cost incurredRs 23.74 cr
Work done57.19%
BuildingWingEstimatedIncurred
Commercial BuildingNARs 38.97 crRs 23.47 cr
-NARs 2.54 crRs 26.78 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwapnil Dattatray Wagh
ArchitectCubix Architects Associates
EngineerDipak Sonawane
EngineerGensys Lifespaces LLP
Chartered AccountantSPAK & Co
PartnerRole in project
Arhumashtika Life Spaces-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100076708/WarDec 2027 → Apr 2028

Reason as filed by the promoterNA

Litigation declared2

CaseCourtStatus
1471/2011Pune Districts and Sessions CourtsOngoing
1471/2011Pune Districts and Sessions CourtsOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400099Hemant Bagareddy MotadooArhumashtika Life Spaces14/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5_ The Atrium FY 24-25 sign.pdf17 Sep 2026
Withdrawal Update Form 1File: FORM-1 ATRIUM.pdf16 Jul 2026
Withdrawal Update Form 2File: FORM 2 ATRIUM.pdf16 Jul 2026
Withdrawal Update Form 3File: FORM- 3 ATRIUM_11zon.pdf16 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A-ATRIUM.pdf26 Jun 2026
Withdrawal Update Form 1File: the atrium.pdf21 Apr 2026
Withdrawal Update Form 2File: form 2 atrium.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM - 03 (2)_11zon.pdf21 Apr 2026
Withdrawal Update Form 1File: form 1 atrium.pdf20 Jan 2026
Withdrawal Update Form 2File: form 2 atrium.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM - 03 (2)_11zon.pdf20 Jan 2026
Withdrawal Update Form 1File: form 1 atrium.pdf31 Oct 2025
Withdrawal Update Form 1File: form 1 atrium.pdf31 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf31 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf31 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf31 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf31 Oct 2025
Withdrawal Update Form 1File: form 1 atrium.pdf30 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf30 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf30 Oct 2025
Withdrawal Update Form 1File: form 1 atrium.pdf29 Oct 2025
Withdrawal Update Form 1File: form 1 atrium.pdf29 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf29 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf29 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf29 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf29 Oct 2025
Withdrawal Update Form 1File: form 1 atrium.pdf20 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf20 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf20 Oct 2025
Withdrawal Update Form 1File: form 1 atrium.pdf17 Oct 2025
Withdrawal Update Form 1File: form 1 atrium.pdf17 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf17 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf17 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf17 Oct 2025
Withdrawal Update Form 1File: form 1 atrium.pdf16 Oct 2025
Withdrawal Update Form 1File: form 1 atrium.pdf16 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf16 Oct 2025
Withdrawal Update Form 2File: The Atrium- Form-2- Engg Certificate- 30-09-25.pdf16 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf16 Oct 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf16 Oct 2025
Withdrawal Update Form 1File: Form-1.pdf22 Sep 2025
Withdrawal Update Form 1File: Form-1.pdf22 Sep 2025
Withdrawal Update Form 2File: Form-2.pdf22 Sep 2025
Withdrawal Update Form 2File: Form-2.pdf22 Sep 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf22 Sep 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf22 Sep 2025
Withdrawal Update Form 1File: Form-1.pdf16 Sep 2025
Withdrawal Update Form 1File: Form-1.pdf16 Sep 2025
Withdrawal Update Form 2File: Form-2.pdf16 Sep 2025
Withdrawal Update Form 2File: Form-2.pdf16 Sep 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf16 Sep 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf16 Sep 2025
Withdrawal Update Form 1File: Form-1.pdf13 Sep 2025
Withdrawal Update Form 1File: Form-1.pdf13 Sep 2025
Withdrawal Update Form 1File: Form-1.pdf13 Sep 2025
Withdrawal Update Form 2File: Form-2.pdf13 Sep 2025
Withdrawal Update Form 2File: Form-2.pdf13 Sep 2025
Withdrawal Update Form 2File: Form-2.pdf13 Sep 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf13 Sep 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf13 Sep 2025
Withdrawal Update Form 3File: Form-3 30062025.pdf13 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ATRIUM ARHUM ASHTIKA 31032025.pdf28 Apr 2025
Disclosure of sold/ booked inventoryFile: ATRIUM MOHDWADI 31032025.pdf8 Apr 2025
Details of encumbrances concerned to FinanceFile: Fianace encumbrance.pdf29 Jan 2025
Details of encumbrances concerned to LegalFile: Fianace encumbrance.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ATRIUM 31122024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ATRIUM 31122024_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ATRIUM 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: THE ATRIUM MOHDWAD 31122024.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: THE ATRIUM 30062024.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: THE ATRIUM 30092024.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 THE ATRIUM 12072024.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 THE ATRIUM 2102024.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 THE ATRIUM 09082024.pdf10 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 THE ATRIUM 19102024.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE ATRIUM 12072024.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 THE ATRIUM 19102024.pdf10 Dec 2024
Proforma of Agreement for saleFile: Draft Agreement The Atrium.pdf18 Jun 2024
Other - LegalFile: Declaration for Name Change in Partnership Deed.pdf7 Jun 2024

How this compares with Pune

43%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Atrium on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmThe AtriumCompleted 70Lapsed / revoked 29Other 96Dot size: filed unitsN

Filed coordinates, straight-line distance. 195 registered projects within 2 km.

Builder: Arhumashtika Life Spaces

Arhumashtika Life Spaces has 1 registration on MahaRERA, including The Atrium. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if The Atrium is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Atrium?

The registered promoter entity is Arhumashtika Life Spaces, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Atrium?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against The Atrium?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for The Atrium?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Atrium?

The professionals named in the filing: Architect: Swapnil Dattatray Wagh; Architect: Cubix Architects Associates; Engineer: Dipak Sonawane; Engineer: Gensys Lifespaces LLP; Chartered Accountant: SPAK & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Atrium?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Atrium. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Atrium to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.