Home / Browse projects / Raigarh, Maharashtra / RIYASAT BLISS
RIYASAT BLISS
By Riyasat Infra Developers Private Limited
RG-MH-31045 · RERA P52000079379 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 4 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RIYASAT BLISS is a Plotted project by Riyasat Infra Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000079379 on 3 Mar 2025. The registration is recorded completed; possession was promised by 30 Apr 2026. The completion date has moved by 4 months from the original filing. 113 of the 243 units on this registration are recorded sold or booked. 2 complaints are on record with the regulator.
At a glance
Project
- NameRIYASAT BLISS
- TypePlotted
- Location
- Zila Parishad Road
- Village Panshil and Talegaon
- Panshil
- Khalapur
- Raigarh
- 410222
- Pincode410222
- RERA no.P52000079379
- ReraGenie IDRG-MH-31045
Builder
- NameRiyasat Infra Developers Private Limited
- Entity typeCompany
- CINU70109RJ2021PTC074734
- GSTIN27AAKCR9676A1ZZ
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorSUMER SINGH SAINI
- DirectorSUBHASH Chand SAINI
- Other registrations6 more →
- Completed5 of 7
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 Mar 2025
- Promised completion30 Apr 2026
- Revised completionRevised to 30 Apr 2026 (originally 31 Dec 2025)
- BuildingsNot stated in filing
- Documents filed82 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 97% |
| Water Supply | Yes | 92% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 96% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 89% |
| Street Lighting | Yes | 96% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 88% |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | Yes | 75% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 78% |
| Aggregate area of recreational Open Space | Yes | 90% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARKONIQ INFRACON DESIGN |
| Architect | AN ARCH NEHA JAIN |
| Architect | AN.ARCH |
| Architect | MR PRANAY P PASHILKAR |
| Engineer | CREATOR RCC CONSULTANT LLP RUTVIJ PATEL |
| Chartered Accountant | S D PARANJPE & ASSOCIATES CA SHANTANU PARANJAPE |
| Chartered Accountant | Bharat A Choudhary & Co. |
| Chartered Accountant | VKG & Company |
| Chartered Accountant | S D PARANJAPE & ASSOCIATES CA SHANTANU PARANJAPE |
| Partner | Role in project |
|---|---|
| Riyasat Infra Developers Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur project registration got delayed due to uncertain rainy conditions in Maharashtra this year. Also, the landowners of the nearby land were creating obstructions during our project work in the past six months. The work was completely halted due to above reasons and hence work could not be completed within the completion date estimated earlier. Thus for the completion of the development work within next 4 months, we are applying for extension of the project completion date upto 30/04/2026. As prescribed under circular no 07/2019 dated 08 Feb 2019, the consent of more than 51% of the allottees
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601430 | Anand Sethuraman | Riyasat Infra Developers Private Limited | 14/03/2026 |
| CC12604827 | Anand Sethuraman | Riyasat Infra Developers Private Limited | 31/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jan 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Apr 2026
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_ 30-04-2026_Architects Certificate-RB.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: Form 2_ 30-04-2026_Engineers Certificate-RB.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: Form-3 CA Certificate For RB-client signed.pdf | 27 May 2026 |
| Completion CertificateFile: architect Certificate form 4.pdf | 28 Apr 2026 |
| Completion CertificateFile: Acknowledgment of completion certificate of MSRDC_page-0001.pdf | 28 Apr 2026 |
| Completion CertificateFile: clrefication on CC .pdf | 28 Apr 2026 |
| Completion CertificateFile: BR JAI SINGH SAINI.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 RB.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 RB 31-03-2026_compressed.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 RB 31-03-2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 RB 31-03-2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 RB 31-03-2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 RB 31-03-2026.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 RB.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 RB.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 RB 31-12-2025_compressed.pdf | 31 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 RB An Arch.pdf | 4 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 RB.pdf | 4 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 RB_compressed.pdf | 4 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Riyasat Bliss 24-25.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: From -1 Riyasat Bliss_0001.pdf | 2 Aug 2025 |
| Withdrawal Update Form 1File: From -1 Riyasat Bliss_0001.pdf | 2 Aug 2025 |
| Withdrawal Update Form 2File: Form -2 Riyasat Bliss_page-0001.pdf | 2 Aug 2025 |
| Withdrawal Update Form 2File: Form -2 Riyasat Bliss_page-0001.pdf | 2 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Riyasat Bliss_Signed final.pdf | 2 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Riyasat Bliss_Signed final.pdf | 2 Aug 2025 |
| Form 1File: Form 1 Architect Certificate _ 31-03-2025.pdf | 23 May 2025 |
| Form 2File: Form 2 Engineer Certificate - RB.pdf | 23 May 2025 |
| Form 3File: Final Signed Form 3_31-3-2025_CA Certificate - RB.pdf | 23 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclsoure of Sold and Booked Inventory_Riyasat Bliss.pdf | 23 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate _ 31-03-2025_1_11zon.pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Signed Form 3_31-3-2025_CA Certificate.pdf | 12 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - RB.pdf | 12 May 2025 |
| Proforma of Agreement for saleFile: Agreement for Sale Final - Amended.pdf | 28 Mar 2025 |
| Other - TechnicalFile: Scan-0005- Layout.pdf | 21 Jan 2025 |
| Copy of the legal title reportFile: Legal title.pdf | 20 Jan 2025 |
| Other - LegalFile: Talegaon 2 - C.pdf | 16 Jan 2025 |
| Other - LegalFile: talegaon 1 -C.pdf | 16 Jan 2025 |
| Other - LegalFile: Talegaon 7-12 (1) - C.pdf | 16 Jan 2025 |
| Other - LegalFile: Talegaon 53 1 5782 2023 (1) - C.pdf | 16 Jan 2025 |
| Other - LegalFile: Talegaon 51 8 2 -C.pdf | 16 Jan 2025 |
| Other - LegalFile: Talegaon 51 8 1 - C.pdf | 16 Jan 2025 |
| Other - LegalFile: Talegaon 51 7 5777-2023-2-C.pdf | 16 Jan 2025 |
| Other - LegalFile: Talegaon 51 7 5777-2023-1- C.pdf | 16 Jan 2025 |
| Other - LegalFile: Talegaon 51 5 5781-2023-2 - C.pdf | 16 Jan 2025 |
| Other - LegalFile: Panshil 7-12 -C.pdf | 16 Jan 2025 |
| Other - LegalFile: 88 Panshil scan copy (1)-3 - C.pdf | 16 Jan 2025 |
| Other - LegalFile: 88 Panshil scan copy (1)-2 -C.pdf | 16 Jan 2025 |
| Other - LegalFile: 88 Panshil scan copy (1)-1 -C.pdf | 16 Jan 2025 |
| Other - LegalFile: 90 Panshil scan copy (1) - C.pdf | 16 Jan 2025 |
| Other - LegalFile: 89 Panshil Scan copy (1) - C.pdf | 16 Jan 2025 |
| Other - LegalFile: 70-3-A Panshil scan copy - c.pdf | 16 Jan 2025 |
| Other - LegalFile: Talegaon 51 5 5781-2023-1 (1) - C.pdf | 16 Jan 2025 |
| Layout approvalFile: Layout - Bliss.pdf | 7 Jan 2025 |
| Building plan approval or NA orderFile: Merged NA Order - 1.pdf | 7 Jan 2025 |
| PAN CardFile: PAN CARD.pdf | 7 Jan 2025 |
| Copy of the legal title reportFile: TSR 1 FINAL.pdf | 7 Jan 2025 |
| Copy of the legal title reportFile: TSR 2.pdf | 7 Jan 2025 |
| Copy of the legal title reportFile: TSR 3.pdf | 7 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Details Of Encumbrances - Finance-merged.pdf | 7 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances - merged.pdf | 7 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Layout - Bliss.pdf | 7 Jan 2025 |
| Proforma of Allotment letterFile: Proforma Allotment Letter.pdf | 7 Jan 2025 |
| Declaration in FORM BFile: Form B - New.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate_0001.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -1.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 7 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Layout Final Approval.pdf | 7 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Merged NA Order - 1.pdf | 7 Jan 2025 |
| Declaration about Commencement CertificateFile: DocScanner 20-Feb-2025 1-16 pm.pdf | 7 Jan 2025 |
| CERSAI detailsFile: CERSAI Report_merged.pdf | 7 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Format A_merged.pdf | 7 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Of Allotment letter.pdf | 7 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Details Of Encumbrances - Finance-merged.pdf | 7 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances - merged.pdf | 7 Jan 2025 |
| Other - TechnicalFile: Annexure -A.pdf | 7 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Of AFS - 1.pdf | 7 Jan 2025 |
| Proforma of Agreement for saleFile: Agreement for sale proforma.pdf | 7 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest-1.pdf | 7 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest-2.pdf | 7 Jan 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| THE RIYASAT SANKALPP52000054353 | Village Nadhal, Raigarh | 325 | Jan 2024 | Completed | Oct 2025 | Late, Nov 2025 |
| Riyasat Sankalp extension secondPP1270002500477 | Nadhal, Raigarh | 13 | Aug 2025 | Completed | Oct 2025 | Late, Nov 2025 |
| Riyasat Sankalp extension firstPP1270002500558 | Nadhal, Raigarh | 13 | Aug 2025 | Completed | Oct 2025 | Oct 2025 |
| RIYASAT SHOPPING COMPLEXP52000080641 | Mumbai Pune Highway, Raigarh | 24 | Jun 2025 | Ongoing | Oct 2025Registered original: Jul 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
Keep RIYASAT BLISS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Village Panshil and Talegaon5,900+ in Raigarh
MASS DREAM CITY
Mass Developers
Greenfield
Persipina Developers Private Limited
Grandstand
Persipina Developers Private Limited
Olympus
Persipina Developers Private Limited
DWARIKA MAJESTICA
NAMASTEY GROUP
Balaji Tulips
Balaji Homes
See every Raigarh project, with the district possession charts
Builder: Riyasat Infra Developers Private Limited
Riyasat Infra Developers Private Limited has 7 registrations on MahaRERA, including THE RIYASAT SANKALP and RIYASAT BLISS. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if RIYASAT BLISS is delayed beyond 30 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RIYASAT BLISS?
The registered promoter entity is Riyasat Infra Developers Private Limited, a company as per the filing. Its CIN U70109RJ2021PTC074734 and GSTIN 27AAKCR9676A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RIYASAT BLISS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against RIYASAT BLISS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for RIYASAT BLISS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RIYASAT BLISS?
The professionals named in the filing: Architect: ARKONIQ INFRACON DESIGN; Architect: AN ARCH NEHA JAIN; Architect: AN.ARCH; Architect: MR PRANAY P PASHILKAR; Engineer: CREATOR RCC CONSULTANT LLP RUTVIJ PATEL; Chartered Accountant: S D PARANJPE & ASSOCIATES CA SHANTANU PARANJAPE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RIYASAT BLISS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback