New projects and RERA data in Solapur district, Maharashtra

554 projects are registered in Solapur district: 21,638 units across them, 19 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

554Projects covered
19Registered, last 12 months
21,638Units declared
16,962Units not yet booked
87Completion dates revised
3With declared litigation

Of the 554 covered registrations, 87 have revised their promised completion date and 3 declare litigation. The median project here is 15% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Solapur projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 554 projects with a promised date, 173 are recorded delivered, 161 are still on the register and 220 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

0255075100today2017: 3 projects, delivered2017: 1 projects, registration lapsed or cancelled’172018: 23 projects, delivered2018: 5 projects, registration lapsed or cancelled’182019: 25 projects, delivered2019: 9 projects, registration lapsed or cancelled’192020: 14 projects, delivered2020: 8 projects, registration lapsed or cancelled’202021: 15 projects, delivered2021: 10 projects, registration lapsed or cancelled’212022: 25 projects, delivered2022: 26 projects, registration lapsed or cancelled’222023: 21 projects, delivered2023: 26 projects, registration lapsed or cancelled’232024: 12 projects, delivered2024: 48 projects, registration lapsed or cancelled’242025: 20 projects, delivered2025: 67 projects, registration lapsed or cancelled’252026: 10 projects, delivered2026: 48 projects, on the register2026: 19 projects, registration lapsed or cancelled’262027: 3 projects, delivered2027: 50 projects, on the register2027: 1 projects, registration lapsed or cancelled’272028: 1 projects, delivered2028: 16 projects, on the register’282029: 21 projects, on the register’292030: 21 projects, on the register’302032: 4 projects, on the register’322035: 1 projects, delivered2035: 1 projects, on the register’35

196 projects promise possession in 2026 or later. Facts as per filings on RERA website.

05,00010k15k20ktoday2017: 45 flats, registration lapsed or cancelled (only 1 of 4 projects filed a flat count)’172018: 834 flats, delivered (only 4 of 28 projects filed a flat count)’182019: 276 flats, delivered (only 4 of 34 projects filed a flat count)2019: 325 flats, registration lapsed or cancelled (only 4 of 34 projects filed a flat count)’192020: 18 flats, delivered (only 2 of 22 projects filed a flat count)2020: 74 flats, registration lapsed or cancelled (only 2 of 22 projects filed a flat count)’202021: 695 flats, delivered (only 2 of 25 projects filed a flat count)’212022: 704 flats, delivered (only 9 of 51 projects filed a flat count)2022: 65 flats, registration lapsed or cancelled (only 9 of 51 projects filed a flat count)’222023: 142 flats, delivered (only 13 of 47 projects filed a flat count)2023: 489 flats, registration lapsed or cancelled (only 13 of 47 projects filed a flat count)’232024: 344 flats, delivered (only 6 of 60 projects filed a flat count)2024: 528 flats, registration lapsed or cancelled (only 6 of 60 projects filed a flat count)’242025: 159 flats, delivered (only 15 of 87 projects filed a flat count)2025: 348 flats, registration lapsed or cancelled (only 15 of 87 projects filed a flat count)’252026: 126 flats, delivered (only 29 of 77 projects filed a flat count)2026: 1,166 flats, on the register (only 29 of 77 projects filed a flat count)2026: 316 flats, registration lapsed or cancelled (only 29 of 77 projects filed a flat count)’262027: 10,551 flats, on the register’272028: 556 flats, on the register’282029: 1,985 flats, on the register’292030: 1,677 flats, on the register’302032: 83 flats, on the register’322035: 132 flats, on the register’35

16,592 flats are promised in 2026 or later, across the 54% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Solapur possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 87 of 554 projects (16%) have moved at least once; the median move is 24 months and the longest is 191 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

0255075100Originally due 2017: 4 projects kept the original date, 100% of the year’17Originally due 2018: 27 projects kept the original date, 73% of the yearOriginally due 2018: 4 projects moved by under 2 years, 11% of the yearOriginally due 2018: 6 projects moved by 2 years or more, 16% of the year’18Originally due 2019: 33 projects kept the original date, 66% of the yearOriginally due 2019: 6 projects moved by under 2 years, 12% of the yearOriginally due 2019: 11 projects moved by 2 years or more, 22% of the year’19Originally due 2020: 16 projects kept the original date, 73% of the yearOriginally due 2020: 1 projects moved by under 2 years, 5% of the yearOriginally due 2020: 5 projects moved by 2 years or more, 23% of the year’20Originally due 2021: 19 projects kept the original date, 83% of the yearOriginally due 2021: 2 projects moved by under 2 years, 9% of the yearOriginally due 2021: 2 projects moved by 2 years or more, 9% of the year’21Originally due 2022: 40 projects kept the original date, 91% of the yearOriginally due 2022: 1 projects moved by under 2 years, 2% of the yearOriginally due 2022: 3 projects moved by 2 years or more, 7% of the year’22Originally due 2023: 42 projects kept the original date, 72% of the yearOriginally due 2023: 8 projects moved by under 2 years, 14% of the yearOriginally due 2023: 8 projects moved by 2 years or more, 14% of the year’23Originally due 2024: 51 projects kept the original date, 88% of the yearOriginally due 2024: 4 projects moved by under 2 years, 7% of the yearOriginally due 2024: 3 projects moved by 2 years or more, 5% of the year’24Originally due 2025: 75 projects kept the original date, 82% of the yearOriginally due 2025: 11 projects moved by under 2 years, 12% of the yearOriginally due 2025: 5 projects moved by 2 years or more, 5% of the year’25Originally due 2026: 62 projects kept the original date, 91% of the yearOriginally due 2026: 5 projects moved by under 2 years, 7% of the yearOriginally due 2026: 1 projects moved by 2 years or more, 1% of the year’26Originally due 2027: 42 projects kept the original date, 100% of the year’27Originally due 2028: 15 projects kept the original date, 100% of the year’28Originally due 2029: 17 projects kept the original date, 100% of the year’29Originally due 2030: 19 projects kept the original date, 95% of the yearOriginally due 2030: 1 projects moved by under 2 years, 5% of the year’30Originally due 2032: 4 projects kept the original date, 100% of the year’32Originally due 2035: 1 projects kept the original date, 100% of the year’35

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

05,00010k15k20kOriginally due 2017: 45 flats kept the original date, 100% of the year (only 1 of 4 projects filed a flat count)’17Originally due 2018: 834 flats kept the original date, 73% of the year (only 5 of 37 projects filed a flat count)Originally due 2018: 18 flats moved by 2 years or more, 16% of the year (only 5 of 37 projects filed a flat count)’18Originally due 2019: 601 flats kept the original date, 66% of the year (only 8 of 50 projects filed a flat count)Originally due 2019: 1,136 flats moved by 2 years or more, 22% of the year (only 8 of 50 projects filed a flat count)’19Originally due 2020: 92 flats kept the original date, 73% of the year (only 3 of 22 projects filed a flat count)Originally due 2020: 68 flats moved by 2 years or more, 23% of the year (only 3 of 22 projects filed a flat count)’20’21Originally due 2022: 751 flats kept the original date, 91% of the year (only 9 of 44 projects filed a flat count)Originally due 2022: 141 flats moved by 2 years or more, 7% of the year (only 9 of 44 projects filed a flat count)’22Originally due 2023: 631 flats kept the original date, 72% of the year (only 18 of 58 projects filed a flat count)Originally due 2023: 65 flats moved by under 2 years, 14% of the year (only 18 of 58 projects filed a flat count)Originally due 2023: 111 flats moved by 2 years or more, 14% of the year (only 18 of 58 projects filed a flat count)’23Originally due 2024: 807 flats kept the original date, 88% of the year (only 7 of 58 projects filed a flat count)Originally due 2024: 34 flats moved by under 2 years, 7% of the year (only 7 of 58 projects filed a flat count)’24Originally due 2025: 433 flats kept the original date, 82% of the year (only 25 of 91 projects filed a flat count)Originally due 2025: 2,180 flats moved by under 2 years, 12% of the year (only 25 of 91 projects filed a flat count)Originally due 2025: 8,037 flats moved by 2 years or more, 5% of the year (only 25 of 91 projects filed a flat count)’25Originally due 2026: 852 flats kept the original date, 91% of the year (only 25 of 68 projects filed a flat count)Originally due 2026: 165 flats moved by under 2 years, 7% of the year (only 25 of 68 projects filed a flat count)Originally due 2026: 126 flats moved by 2 years or more, 1% of the year (only 25 of 68 projects filed a flat count)’26Originally due 2027: 777 flats kept the original date, 100% of the year (only 17 of 42 projects filed a flat count)’27Originally due 2028: 403 flats kept the original date, 100% of the year’28Originally due 2029: 1,515 flats kept the original date, 100% of the year’29Originally due 2030: 1,525 flats kept the original date, 95% of the yearOriginally due 2030: 76 flats moved by under 2 years, 5% of the year’30Originally due 2032: 83 flats kept the original date, 100% of the year’32Originally due 2035: 132 flats kept the original date, 100% of the year’35

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Solapur

Who sanctions building in Solapur

127 of the 554 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Solapur Municipal Corporation74
Pandharpur Municipal Council12
Pandharpur Municipal Corporation7
29 other bodies34

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 554 registrations on this page answers this: on 339 the promoter is the only owner named; on 204 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 11 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Solapur: projects by taluka

554 of the 554 registrations on this page name their taluka.

TalukaProjectsShare
Solapur North39671%
Pandharpur7213%
Barshi387%
9 other talukas489%

Projects in Solapur

Showing 1 to 60 of 554 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
Ray Nagar Housing Project Phase 2KUMBHARI TO DARGANHALLI ROAD, 413007Vasant Vihar Realty Pvt Ltd78825%28 Sep 2018Registered
PMAY BARSHI NAGAR PARISHAD AHPBARSHI NAGAR PARISHAD, 413401BARSHI NAGAR PARISHAD160712%31 Oct 2022Registered
R M Dhariwal Township Velapur PlottingVelapur, 413113Dhariwal And Chhoriya Buildcon Pvt Ltd51263%4 Aug 2017Completed
Kurdu Plotting on Gat No 264Kurudwadi, 413208Pragati Infra Services Pvt. Ltd.50885%24 Aug 2017Completed
CHHORIYA TOWNSHIP WAKHARI PANDHARPUR PHASE 3A/P - Wakhari , Pandharpur, 413304Chhoriya Properties And Development Company4230%18 Feb 2021Registered
Chhoriya Township - Karmalakarmala, 413203Chhoriya Properties41246%17 Aug 2017Completed
ANANTA SOLAPURSolapur (M Corp.), 413008PROPWIZZ INFRA LLP38542%31 Aug 2017Registered
VARAD NAGARIMOUJE NAGOBACHIWADI, 413401M/S SHRIRAM BUILDERS & DEVELOPERS3444%24 Jan 2023Completed
MHDCL ANTROLIKAR NAGAR SOLAPUR PMAY PROJECTANTROLIKAR NAGAR, 413003MAHARASHTRA HOUSING DEVELOPMENT CORPORATION LIMITED3400%28 Apr 2022Registration lapsed
SAMRUDDHI PARKWAYNEAR RUPA BHAVANI TEMPLE, 413002NAGNATH SHIVSHANKAR AKKALKOTE33121%22 Nov 2021Registered
Niyojit Shri Somvanshiya Sahastrarjun Kshatriya Samaj Mahalaxmi Grih Nirman SansthaSolapur North, 413005Anukarati Homes Private Limited28876%21 Jun 2024Registered
The Platino Wing A, B, CJule Solapur, 413004PP Developers28476%8 Jun 2023Registered
Shri Swami Samarth PuramSolapur (M Corp.), 413228Divyaa Ashtavinayaka Realty21926%24 Aug 2017Registration lapsed
Paras Business ParkSouth kasba, 413007Priyadarshani Corporation1890%14 Nov 2024Registered
Chhoriya Township - Plotting Layout AkkalkotAkkalkot, 431216Chhoriya and Chopda Properties18722%22 Aug 2017Completed
KATHALE VIHARBarshi, 413411SATISH MALANBAI ANDHARE18715%6 Aug 2017Completed
R M Dhariwal Township Tembhurni PlottingTembhurni, 413211Dhariwal And Chhoriya Buildcon Pvt Ltd17734%31 Jul 2017Completed
KIMAYA SWAPANAPURTI PHASE 2SAAT RASTA, 413004ALACRITY CONSTRUCTIONS PVT LTD1745%11 Jun 2025Registered
Chhoriya Township Wakhari Pandharpur Phase 2Wakhari, Pandharpur, 413304Chhoriya Properties And Development Company15322%21 Oct 2020Registered
VENKATESH LA-ARKA PHASE IINEHARU NAGAR, 413004P A SATHE & ASSOCIATES1450%11 Oct 2022Registration lapsed
NAKSHATRA HEIGHTSKASABE SOLAPUR, 413005GAYATRI BUILDERS AND DEVELOPERS14122%23 Oct 2021Registered
Shhraddha EmraldGandhi Nagar, 413006Shhraddha Buildcons14170%15 Jul 2017Registration lapsed
Vrundavan ParkVasant Vihar, 413001Vrundavan Properties1390%14 Sep 2022Registered
Platinum MallLaxmi Peth, 413001M/S Ganesh Ramchandra Apte13268%10 Nov 2023Registered
Chhoriya Residency - PandharpurPandharpur, 413304Dhariwal And Chhoriya Developers LLP13178%12 Oct 2019Registered
Chhoriya Township Modnimb G No 139/Part Plottingmodnimb, 413301Dhariwal And Chhoriya Buildcon Pvt Ltd12994%5 Aug 2017Completed
INDRADHANU-Phase-IVLaxmi Peth, 413001M/S Ganesh Ramchandra Apte12665%11 Jan 2018Registered
INDRADHANU-Phase-6Laxmi Peth, 413001M/S Ganesh Ramchandra Apte12277%30 Mar 2021Registered
CENTER-PRIDEYAMAI MANDIR, 413304AMOL DATTATRAY NAGTILAK1170%6 Jan 2020Registered
MANOMAY VIHARPRATAP NAGAR, 413004SUKHAKARTA REALITY11726%31 Aug 2017Completed
Aarambha ResidencyISBAVI, 413304Aarambha Residency1090%31 Aug 2026Registered
Jijau ResidencyAt Murarji Peth Uma Nagari, Solapur 413001, 413001Rachana Developers1090%15 Sep 2025Registered
ROYAL SYNERGYUMA GRUHNIRMAN SANSTHA MOUJE MURARJI PETH, 413001SHREE JAGDAMB DEVELOPERS10737%10 Feb 2025Registered
505 Bahava Row Houses,Open PlotsSolapur (M Corp.), 413001Pandhe Infracons Pvt Ltd10697%31 Aug 2017Registration lapsed
Chhoriya Township - Plotting Layout VairagVairag, 413402Khinvosara and Chhoriya Properties10676%10 Aug 2017Completed
Heritage PalmsModel Public School, 413004Manoj Kantilal Shah9971%8 Dec 2017Completed
Anantkoti SkyvillaSolapur (M Corp.), 413004ANANTKOTI BUILDCON9725%23 Jul 2025Registered
Mahanandi HeightsShelagi, 413006Sneharika Vijayshree Developers940%3 Sep 2025Registered
RAJASHREE HEIGHTSMajrewadi, 413224Rajashree Builders8913%15 May 2023Registered
HMEMPIRE210211GANGADHAR NAGAR, 413006HERIYTAGE MANIYDHARI EMPIRE860%25 Sep 2019Registration lapsed
BRAMHA GALAXYSUMITRA NAGAR, 413006BRAMHA BUILDCON8587%6 Jun 2022Registered
Tirumala ParadiseJodbhavi Peth, 413002Sachin Vitthal Ghanate844%15 Jan 2024Registered
KIMAYA SWAPANASHRUSTHIJULE SOLAPUR, 413004KIMAYA CONSTRUCTIONS PVT LTD8218%27 Mar 2025Registered
Shree Vasundhara HeightsVishwakarma Residency, 413006Kishor Rajendra Sanjekar8140%11 Jan 2022Registered
DHANSHREE PARKNEAR MAHILA HOSPITAL, 413305KAZI BUILDERS780%2 Dec 2025Registered
TIRUPATI PURAMPANDHARPUR, 413304TIRUPATI CONSTRUCTION PRAMOTERS AND DEVELOPERS7828%16 Apr 2024Registered
PANJWANI MARKETKasabe Solapur, 413003V V SOMSHETTI BUILDERS LLP7658%6 Dec 2021Registered
SAMARTH PRASADSOLAPUR, 413004JJRV INFRA PRIVATE LIMITED7626%11 Aug 2025Registered
FOUR SEASONSSoregaon, 413008T6 REALTY PVT LTD7447%6 Feb 2024Completed
Gokul ViharNear Sanket Thobade Nagar, 413002Aakruti Builders7424%5 Apr 2023Registered
Madhuban Paradise Part-IINear Bhavani Temple, 413002Madhuri Lature740%18 Jun 2019Registration lapsed
Panchganga Bramhaputra HeightsGandhi Nagar, 413006HANMANTU KOMARAYYA BURA7399%27 Jun 2023Registered
Sai Suman NagarWidi Gharkul Kumbhari A/B, 413006Pandhe Construction Pvt Ltd7384%19 Aug 2017Registration lapsed
SAI ICONMurarji Peth, Solapur, 413001BJR CONTRUCTIONS PRIVATE LIMITED7121%2 Feb 2024Registered
F.F AMORASolapur (M Corp.), 413003F F CITY TOWER DEVELOPERS68100%9 Oct 2017Registered
Paras ParadiseMurarji Peth, 413001Anantkoti Developers6847%2 Feb 2024Registered
MAHESH COMPLEXMAHESH SANKRUTIK BHAVAN, NEAR LIC OFFICE, 413304SHRI CHAITANYA ADHYATMIK TRUST670%29 Jul 2025Registered
Balaji HeightsRamling Nagar, 413004Balaji Infra6673%1 Sep 2021Registered
VINAYAK SQUAREGANESH NAGAR, 413001SHRI VINAYAK CONSSTRUCTIONS6560%23 Feb 2018Registration lapsed
522Solapur (M Corp.), 413001Pandhe Infracons Pvt Ltd6466%22 Aug 2017Registration lapsed
Planning a launch in Solapur? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Solapur

M/S Ganesh Ramchandra Apte (8), Dhariwal And Chhoriya Buildcon Pvt Ltd (7), Mohsin Haroon Shaikh (6), Gayatri Developers (5), IMAGE SPACE INCORPORATED (5), Devendra Vasudeo Sangolkar (5). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Solapur projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 15% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Solapur project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Solapur district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Solapur registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Solapur project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Solapur district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.