Home / Browse projects / Solapur, Maharashtra / KIMAYA SWAPANASHRUSTHI
KIMAYA SWAPANASHRUSTHI
By KIMAYA CONSTRUCTIONS PVT LTD
RG-MH-31479 · RERA P52600079814 · Last updated on MahaRERA portal: 16 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KIMAYA SWAPANASHRUSTHI is a Others project by KIMAYA CONSTRUCTIONS PVT LTD in Solapur, Maharashtra, registered with MahaRERA as P52600079814 on 27 Mar 2025. Possession is promised by 31 Mar 2030. 15 of the 82 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.
At a glance
Project
- NameKIMAYA SWAPANASHRUSTHI
- TypeOthers
- Location
- VIJAPUR ROAD
- JULE SOLAPUR
- Solapur (M Corp.)
- Solapur North
- Solapur
- 413004
- Pincode413004
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600079814
- ReraGenie IDRG-MH-31479
Builder
- NameKIMAYA CONSTRUCTIONS PVT LTD
- Entity typeCompany
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Mar 2025
- Promised completion31 Mar 2030
- Revised completionNone
- Buildings2 building records
- Documents filed53 files
Current status
Figures as on 16 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KIMAYA SWAPANASHRUSTHI GANGA BUILDING | NA | 19 | 13 | 70 | 0 | 70 |
| KIMAYA SWAPANASHRUSTHI KAMAL BUILDING | NA | 6 | 2 | 12 | 0 | 12 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
KIMAYA SWAPANASHRUSTHI GANGA BUILDING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
KIMAYA SWAPANASHRUSTHI KAMAL BUILDING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed227
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| KIMAYA SWAPANASHRUSTHI GANGA BUILDING | 1 | 142 | 143 |
| KIMAYA SWAPANASHRUSTHI KAMAL BUILDING | 1 | 83 | 84 |
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| KIMAYA CONSTRUCTIONS PVT LTD | Solapur (M Corp.) | Solapur |
| SHRIKANT GOVIND TAKALIKAR | Solapur (M Corp.) | Solapur |
| SHASHIKANT GOVIND TAKALIKAR | Solapur (M Corp.) | Solapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRATHMESH GANDHI |
| Architect | ATVIEWDESINER STUDIO |
| Engineer | CHANDRAKANT CHAVDEKAR |
| Engineer | ANANTA SURVASE |
| Engineer | ATUL KAMBALE |
| Chartered Accountant | DILIP SAPATNEKAR |
| Chartered Accountant | S L SARANGI |
| Chartered Accountant | CL BALDOTACO |
| Partner | Role in project |
|---|---|
| KIMAYA CONSTRUCTIONS PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2030
Documents filed53
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: KSS RERA FORM 2A JUNE 26.pdf | 16 Jun 2026 |
| Form 1File: KSS FORM 1 APR 2026.pdf | 2 May 2026 |
| Form 2File: KSS FORM 2 APR 2026.pdf | 2 May 2026 |
| Form 3File: KSS FORM 3 APR 2026.pdf | 2 May 2026 |
| Disclosure of Sold and Booked InventoryFile: KSS UNSOLD CHART APR 2026.pdf | 2 May 2026 |
| Form 1File: KCPL KSS FORM -1.pdf | 14 Feb 2026 |
| Form 2File: KCPL KSS FORM - 2.pdf | 14 Feb 2026 |
| Form 3File: KCPL KSS FORM 3 CA CERT DEC 2025.pdf | 14 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: KCPL KSS UNSOLD CHART DEC 2025.pdf | 14 Feb 2026 |
| Form 1File: KIMAYA SWAPNSHRUSHTI FORM1.pdf | 11 Dec 2025 |
| Form 2File: FORM 2.pdf | 11 Dec 2025 |
| Form 3File: FORM 3.pdf | 11 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf | 11 Dec 2025 |
| Form 1File: form 1 .pdf | 22 Jul 2025 |
| Form 2File: engg.pdf | 22 Jul 2025 |
| Form 3File: ca_compressed (1).pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: KCPL KSS UNSOLD CHART JULY 25.pdf | 22 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 24 Mar 2025 |
| Declaration in FORM BFile: 6 Other - Legal-4_page-0001 (1).pdf | 15 Mar 2025 |
| Other - FinanceFile: 1 Declaration about all RERA Designated Bank Accounts (Format A)-23_page-0001.pdf | 3 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B (2).pdf | 1 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: KSS ENCUM TO FINANCE.pdf | 4 Feb 2025 |
| Proforma of Allotment letterFile: KSS AL.pdf | 4 Feb 2025 |
| Other - LegalFile: DEC NR UNITS.pdf | 4 Feb 2025 |
| CERSAI detailsFile: KSS NO CERSAI REPORT.pdf | 4 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: KSS BANK FORMAT A.pdf | 4 Feb 2025 |
| Details of encumbrances concerned to LegalFile: KSS ENCUM TO FINANCE.pdf | 4 Feb 2025 |
| Other - LegalFile: KSS DEV AGMT I.pdf | 29 Jan 2025 |
| Other - LegalFile: KSS DEV AGMT II.pdf | 29 Jan 2025 |
| Other - LegalFile: KSS POA DEED.pdf | 29 Jan 2025 |
| Other - TechnicalFile: DEC CUM UNDERT ANNEX A.pdf | 24 Jan 2025 |
| Other - LegalFile: KSS OWNER SHARE DECLARATION.pdf | 27 Dec 2024 |
| Proforma of Agreement for saleFile: KSS AGMT DEC 2024.pdf | 27 Dec 2024 |
| Copy of the legal title reportFile: ADV CHALWADI TITLE REPORT DEC 2024.pdf | 23 Dec 2024 |
| Declaration about Commencement CertificateFile: FORMAT D.pdf | 19 Dec 2024 |
| CERSAI detailsFile: KSS CERSAI Asset Based Search.pdf | 19 Dec 2024 |
| CERSAI detailsFile: DEC CERSAI REPORT.pdf | 19 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: DISC OF FINANCE.pdf | 19 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: LEGAL LITIGATION REPORT.pdf | 18 Dec 2024 |
| Details of encumbrances concerned to LegalFile: LEGAL LITIGATION REPORT.pdf | 18 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISC OF OTHER PROJECT.pdf | 18 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KSS ARCH CERT FORM 1 DEC 2024.pdf | 10 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: KSS DEVIATION REPORT.pdf | 10 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: KSS DEVIATION REPORT.pdf | 10 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT JUNE 2024.pdf | 11 Jun 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: KSS LEGAL ENTITY DEC.pdf | 11 Jun 2024 |
| Status of ConveyanceFile: KSS CONVEYANCE DEC.pdf | 11 Jun 2024 |
| Layout approvalFile: KSS SMC LAYOUT.pdf | 23 May 2024 |
| Building plan approvalFile: Swapnasrusti Approved Plan_compressed.pdf | 23 May 2024 |
| PAN CardFile: KCPL PAN CARD.pdf | 23 May 2024 |
| Copy of Layout Approval (in case of layout)File: KSS SMC LAYOUT.pdf | 23 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Swapnasrusti Approved Permission.pdf | 23 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Swapnasrusti Approved Plan_compressed.pdf | 23 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 53 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KIMAYA SWAPANASHRUSTHI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JULE SOLAPUR550+ in Solapur
The Platino Wing A, B, C
PP Developers
KIMAYA SWAPANAPURTI PHASE 2
ALACRITY CONSTRUCTIONS PVT LTD
VENKATESH LA-ARKA PHASE II
P A SATHE & ASSOCIATES
MANOMAY VIHAR
SUKHAKARTA REALITY
Heritage Palms
Manoj Kantilal Shah
Anantkoti Skyvilla
ANANTKOTI BUILDCON
See every Solapur project, with the district possession charts
Builder: KIMAYA CONSTRUCTIONS PVT LTD
KIMAYA CONSTRUCTIONS PVT LTD has 1 registration on MahaRERA, including KIMAYA SWAPANASHRUSTHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if KIMAYA SWAPANASHRUSTHI is delayed beyond 31 Mar 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KIMAYA SWAPANASHRUSTHI?
The registered promoter entity is KIMAYA CONSTRUCTIONS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KIMAYA SWAPANASHRUSTHI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KIMAYA SWAPANASHRUSTHI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KIMAYA SWAPANASHRUSTHI?
The professionals named in the filing: Architect: PRATHMESH GANDHI; Architect: ATVIEWDESINER STUDIO; Engineer: CHANDRAKANT CHAVDEKAR; Engineer: ANANTA SURVASE; Engineer: ATUL KAMBALE; Chartered Accountant: DILIP SAPATNEKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KIMAYA SWAPANASHRUSTHI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback