Registered No litigation declared Residential / Group Housing project

PMAY BARSHI NAGAR PARISHAD AHP

By BARSHI NAGAR PARISHAD

RG-MH-71013 · RERA P52600047436 · Last updated on MahaRERA portal: 17 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 13 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 13 months from the original
117 of 341Construction stages doneacross 31 buildings; furthest along: Slabs of Super Structure, 50%
1,421 of 1,607Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 193 documents Report an error

PMAY BARSHI NAGAR PARISHAD AHP is a Residential / Group Housing project by BARSHI NAGAR PARISHAD in Solapur, Maharashtra, registered with MahaRERA as P52600047436 on 31 Oct 2022. Possession is promised by 30 Jan 2027. The completion date has moved by 13 months from the original filing. 186 of the 1,607 units on this registration are recorded sold or booked, and 117 of 341 construction stages are filed complete.

At a glance

Project

  • NamePMAY BARSHI NAGAR PARISHAD AHP
  • TypeResidential / Group Housing
  • Location
    • BARSHI
    • BARSHI NAGAR PARISHAD
    • Solapur
    • 413401
  • Pincode413401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600047436
  • ReraGenie IDRG-MH-71013

Builder

  • NameBARSHI NAGAR PARISHAD
  • Entity typePublic Authority

Key dates

this monthRegisteredOct 2022First promiseDec 2025Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Oct 2022
  • Promised completion30 Jan 2027
  • Revised completionRevised to 30 Jan 2027 (originally 31 Dec 2025)
  • Buildings31 building records
  • Documents filed193 files

Current status

12%186 of 1,607 units booked
26.6%Work done, per cost certificate

Figures as on 17 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B1NA5460060
B2NA5060060
B3NA5060060
B4NA5060060
B5NA5060060
B6NA5060060
B7NA5060060
B8NA5060060
B9NA5060060
B10NA5060060
B11NA5060060
B12NA5060060
B13NA5060060
B14NA5060060
B15NA5060060
B16NA5060060
B17NA5060060
B18NA5060060
B19NA5060060
B20NA5060060
B21NA5060060
B22NA5060060
B23NA5060060
B24NA5060060
B25NA5060060
B26NA5060060
B27NA5036036
DRIVER ROOMSNA10606
SANETARY BLOCKNA10022
PRIMARY SCHOOLNA10011
COMMUNITY CENTERNA20022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 17 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 31 buildings; the table lists the first 20.

117 of 341 construction stages are filed complete across 31 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

B155%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B227%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B327%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B427%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B527%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B627%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B727%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B827%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B927%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1027%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1127%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1227%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1327%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1427%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1527%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1633%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1727%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1841%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1955%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B2055%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes23%
Water SupplyYes23%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes20%
Street LightingYes23%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes25%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes23%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed2025

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,025
Open Space2,025
BuildingOpen SpaceTotal
B17575
B27575
B37575
B47575
B57575
B67575
B77575
B87575
B97575
B107575
B117575
B127575
B137575
B147575
B157575
B167575
B177575
B187575
B197575
B207575
B217575
B227575
B237575
B247575
B257575
B267575
B277575

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area57,354 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Feb 2026

Approvals and building plan

Sanctioning authorityMAHADA
Permissible FSI187568.08
Proposed, not sanctioned187,568 sq m
Buildings approved31
Buildings sanctioned31

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAICHURKAR BUILDING GULAL ROAD BARSHI
Estimated costRs 142.68 cr
Cost incurredRs 38.02 cr
Work done26.65%
BuildingWingEstimatedIncurred
-NARs 7.98 crRs 1.83 cr
B1NARs 5.01 crRs 53.83 lakh
B2NARs 5.01 crRs 75.11 lakh
B3NARs 5.01 crRs 75.11 lakh
B4NARs 5.01 crRs 75.11 lakh
B5NARs 5.01 crRs 75.11 lakh
B6NARs 5.01 crRs 75.11 lakh
B7NARs 5.01 crRs 75.11 lakh
B8NARs 5.01 crRs 75.11 lakh
B9NARs 5.01 crRs 1.00 cr
B10NARs 5.01 crRs 1.25 cr
B11NARs 5.01 crRs 1.25 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMOL M MEHTA
EngineerAMOL MEHTA
EngineerPRAKASH P PATIL
Chartered AccountantCA AEJAZ JAMBHAI
Chartered AccountantAEJAZAHMED MD ISHAQUE JAMBHAI
Chartered AccountantHAYEDAR SHAIKH
PartnerRole in project
BARSHI NAGAR PARISHAD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29042620778Dec 2025 → Sep 2026

Reason as filed by the promoterWe respectfully submit that the construction of the above-mentioned project is presently under progress. However, the project could not be completed within the stipulated timeline i.e., December 2025, due to the following unavoidable circumstances beyond our control: 1. Drought Conditions (2023-24): The project was adversely affected due to severe drought conditions prevailing during the year 2023-24, resulting in a slowdown of construction activities for approximately four months. 2. Technical Issues on PMAY Portal: Due to issues relating to gender correction on the PMAY portal, we were unabl

P52600047436/WarDec 2025 → Jan 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jan 2027

Documents filed193

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 193 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf17 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf17 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf17 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf17 Sep 2026
Withdrawal Update Form 3File: FORM 3.pdf17 Sep 2026
Withdrawal Update Form 3File: FORM 3.pdf17 Sep 2026
Form 2A (FY 2025-2026)File: FORM 2A.pdf17 Sep 2026
Form 5 (FY 2025-2026)File: Form-5.pdf17 Sep 2026
Withdrawal Update Form 1File: FORM 1.pdf8 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf8 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf8 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf8 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf8 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf8 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf8 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf8 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf8 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf8 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf8 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf8 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf7 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf7 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf7 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf6 Apr 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf6 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf6 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf1 Apr 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf1 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf1 Apr 2026
Form 1File: FORM 1.pdf28 Mar 2026
Form 2File: FORM 2.pdf28 Mar 2026
Form 3File: FORM 3.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf28 Mar 2026
Form 1File: FORM 1.pdf28 Mar 2026
Form 2File: FORM 2.pdf28 Mar 2026
Form 3File: FORM 3.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVETORY.pdf28 Mar 2026
Form 1File: FORM 1.pdf28 Mar 2026
Form 2File: FORM 2.pdf28 Mar 2026
Form 3File: FORM 3.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf28 Mar 2026
Form 1File: FORM 1.pdf28 Mar 2026
Form 2File: FORM 2.pdf28 Mar 2026
Form 3File: FORM 3.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf28 Mar 2026
Form 1File: FORM 1.pdf28 Mar 2026
Form 2File: FORM 2.pdf28 Mar 2026
Form 3File: FORM 3.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVETORY.pdf28 Mar 2026
Form 1File: FORM 1.pdf28 Mar 2026
Form 2File: FORM 2.pdf28 Mar 2026
Form 3File: FORM 3.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf28 Mar 2026
Form 1File: FORM 1.pdf28 Mar 2026
Form 2File: FORM 2.pdf28 Mar 2026
Form 3File: FORM 3.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf28 Mar 2026
Form 1File: FORM 1.pdf28 Mar 2026
Form 2File: FORM 2.pdf28 Mar 2026
Form 3File: FORM 3.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf28 Mar 2026
Form 1File: FORM 1.pdf28 Mar 2026
Form 2File: FORM 2.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf28 Mar 2026
Form 3File: FORM 3.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Mar 2026

How this compares with Solapur

12%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one moved by 13 months
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep PMAY BARSHI NAGAR PARISHAD AHP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BARSHI NAGAR PARISHAD550+ in Solapur

Builder: BARSHI NAGAR PARISHAD

BARSHI NAGAR PARISHAD has 1 registration on MahaRERA, including PMAY BARSHI NAGAR PARISHAD AHP. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if PMAY BARSHI NAGAR PARISHAD AHP is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PMAY BARSHI NAGAR PARISHAD AHP?

The registered promoter entity is BARSHI NAGAR PARISHAD, a public authority as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PMAY BARSHI NAGAR PARISHAD AHP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PMAY BARSHI NAGAR PARISHAD AHP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PMAY BARSHI NAGAR PARISHAD AHP?

The professionals named in the filing: Architect: AMOL M MEHTA; Engineer: AMOL MEHTA; Engineer: PRAKASH P PATIL; Chartered Accountant: CA AEJAZ JAMBHAI; Chartered Accountant: AEJAZAHMED MD ISHAQUE JAMBHAI; Chartered Accountant: HAYEDAR SHAIKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PMAY BARSHI NAGAR PARISHAD AHP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PMAY BARSHI NAGAR PARISHAD AHP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PMAY BARSHI NAGAR PARISHAD AHP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.