ReraGenieLog inGet a buyer report

Home / Browse projects / Solapur, Maharashtra / Platinum Mall

Registered No litigation declared Commercial project

Platinum Mall

By M/S Ganesh Ramchandra Apte

RG-MH-75894 · RERA P52600053600 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2035Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 96%
42 of 132Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Platinum Mall is a Commercial project by M/S Ganesh Ramchandra Apte in Solapur, Maharashtra, registered with MahaRERA as P52600053600 on 10 Nov 2023. Possession is promised by 31 Dec 2035. 90 of the 132 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NamePlatinum Mall
  • TypeCommercial
  • Location
    • Mangalvedha Road
    • Laxmi Peth
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413001
  • Pincode413001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600053600
  • ReraGenie IDRG-MH-75894

Builder

  • NameM/S Ganesh Ramchandra Apte
  • Entity typePartnership
  • PartnersVinay Vasant Apte, Aparna Milind Venegurkar, Mahesh Vasant Apte, Sarang Arvind Apte, Sharmila Sanjay Venegurkar, Vikas Shankar Koli, Chetan Narsinh Phatak, Malhar Arun Karande, Vishaka Vijay Marathe, Swati Umesh Marathe, Alhad Vamanrao Apte, Nitin Vasant Apte
  • Other registrations7 more →
  • Completed2 of 8
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2023PromisedDec 2035

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Nov 2023
  • Promised completion31 Dec 2035
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

68%90 of 132 units booked
7.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Platinum MallNA880132132

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 96%.

Platinum Mall: 18% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)96%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed597

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots597
Open Space597

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,491 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySolapur Municipal Corporation
Permissible FSI12012.82
Proposed, not sanctioned12,013 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMunicipal Ward 1317, North Kasba, Hyderabad Wale Building, Tilak Chowk, Solapur
Estimated costRs 66.78 cr
Cost incurredRs 5.15 cr
Work done7.71%
BuildingWingEstimatedIncurred
Platinum MallNARs 66.78 crRs 5.15 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIDYA M AKKALKOTE
ArchitectRahul Khamitkar
EngineerEr. Prashant Laxman Kale
EngineerAbhishek Nitin Apte
EngineerAMOL MEHTA
Chartered AccountantCA Aaquib Patel
Chartered AccountantS K I and Associates
PartnerRole in project
M/S Ganesh Ramchandra Apte-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2035

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Indradhanu Platinum Mall Mar 2026 Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Indradhanu Platinum Mall Mar 2026 Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Indradhanu Platinum Mall Mar 2026 Form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: Indradhanu Platinum Mall Dec 2025 Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Indradhanu Platinum Mall Dec 2025 Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Indradhanu Platinum Mall Dec 2025 Form 3.pdf20 Jan 2026
Withdrawal Update Form 1File: Indradhanu Platinum Mall Sep 2025 Form 1.pdf20 Oct 2025
Withdrawal Update Form 2File: Indradhanu Platinum Mall Sep 2025 Form 2.pdf20 Oct 2025
Withdrawal Update Form 3File: Indradhanu Platinum Mall Sep 2025 Form 3.pdf20 Oct 2025
Form 1File: Indradhanu Platinum Mall Jun 2025 Form 1.pdf20 Jul 2025
Form 2File: Indradhanu Platinum Mall Jun 2025 Form 2.pdf20 Jul 2025
Form 3File: Indradhanu Platinum Mall Jun 2025 Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Indradhanu Platinum Mall Jun 2025 Booking Details.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: Indradhanu Platinum Mall Jun 2025 Self Declaration.pdf20 Jul 2025
Form 1File: Indradhanu Platinum Mall Mar 2025 Form 1.pdf20 Jul 2025
Form 2File: Indradhanu Platinum Mall Mar 2025 Form 2.pdf20 Jul 2025
Form 3File: Indradhanu Platinum Mall Mar 2025 Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Indradhanu Platinum Mall Mar 2025 Booking Details.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: Indradhanu Platinum Mall Mar 2025 Self Declaration.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Platinum Mall Q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Platinum Mall Q4.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Platinum Mall Form 2 as on 31 12 2024.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Platinum Mall.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Platinum Mall as on 31 12 2024_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Platinum Mall.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: PLATINAM MALL -SOLD AND BOOKED INVENTORY 31-12-2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed Certificate of CA Form 3 Excel - upto Sep 2024_compressed.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: INVENTORY-PH-PLATINUM MALL-DTD--30-09-2024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Platinum Mall Form 1 Phase 06-07-2024.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Platinum Mall FORM-2-ENGI CERTI.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Platinum MallI INVENTORY-PH-PLATINUM MALL-DTD--30-06-2024.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PLATINUM-FORM-1-ARCH CERTI.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (1).pdf4 Jun 2024
Other - LegalFile: 1 Other - Technical (7).pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (12)_compressed.pdf26 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200283752711_For_Asset_Based_Search_17_10_2023_14_14_46_992.pdf23 Oct 2023
CERSAI detailsFile: ilovepdf_merged (35)_compressed.pdf23 Oct 2023
Other - FinanceFile: ilovepdf_merged (35)_compressed.pdf23 Oct 2023
Details of encumbrances concerned to FinanceFile: Financial Encum.pdf8 Oct 2023
Details of encumbrances concerned to FinanceFile: legal encum.pdf8 Oct 2023
Details of encumbrances concerned to LegalFile: Financial Encum.pdf8 Oct 2023
Details of encumbrances concerned to LegalFile: Financial Encum.pdf8 Oct 2023
Details of encumbrances concerned to LegalFile: legal encum.pdf8 Oct 2023
Other - LegalFile: Date Clarification.pdf8 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Platinum Mall.pdf20 Sep 2023
Other - TechnicalFile: ilovepdf_merged (29)_compressed.pdf18 Sep 2023
Declaration in FORM BFile: FORM-B_11zon.pdf15 Sep 2023
Layout approvalFile: Layoutplatinum.pdf13 Sep 2023
Building plan approvalFile: BASEMENTground.pdf13 Sep 2023
Building plan approvalFile: ELEVATION SECTION PLAN.pdf13 Sep 2023
Building plan approvalFile: Service.pdf13 Sep 2023
Copy of Layout Approval (in case of layout)File: Layoutplatinum.pdf13 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: BASEMENTground.pdf13 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: ELEVATION SECTION PLAN.pdf13 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Service.pdf13 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_11zon.pdf13 Sep 2023
Declaration about Commencement CertificateFile: DCC.pdf13 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of intrest Format.pdf13 Sep 2023
Proforma of Agreement for saleFile: Agreement For Sale new.pdf13 Sep 2023
Proforma of Allotment letterFile: Allotment Letter Flat.pdf13 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account (declaration).pdf13 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment Flat.pdf13 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation ATS.pdf13 Sep 2023
Copy of the legal title reportFile: Title Report- RERA- G R APTE_11zon (1).pdf26 Aug 2022
PAN CardFile: Ganesh Ramchandra APte Pan Card Xerox.pdf25 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
INDRADHANU PHASE-1INDRADHANU Phase-I330CompletedMay 2015Late, Mar 2017

How this compares with Solapur

68%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one has not
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep Platinum Mall on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Laxmi Peth550+ in Solapur

2 kmPlatinum MallCompleted 17Lapsed / revoked 6Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: M/S Ganesh Ramchandra Apte

M/S Ganesh Ramchandra Apte has 8 registrations on MahaRERA, including INDRADHANU Phase-3 and INDRADHANU-Phase-2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if Platinum Mall is delayed beyond 31 Dec 2035?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Platinum Mall?

The registered promoter entity is M/S Ganesh Ramchandra Apte, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Platinum Mall?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Platinum Mall?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Platinum Mall?

The professionals named in the filing: Architect: VIDYA M AKKALKOTE; Architect: Rahul Khamitkar; Engineer: Er. Prashant Laxman Kale; Engineer: Abhishek Nitin Apte; Engineer: AMOL MEHTA; Chartered Accountant: CA Aaquib Patel. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Platinum Mall?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Platinum Mall. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Platinum Mall to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.