Home / Browse projects / Solapur, Maharashtra / Gokul Vihar
Gokul Vihar
RG-MH-37904 · RERA P52600050342 · Last updated on MahaRERA portal: 2 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Gokul Vihar is a Residential / Group Housing project by Aakruti Builders in Solapur, Maharashtra, registered with MahaRERA as P52600050342 on 5 Apr 2023. Possession is promised by 31 Dec 2026. 18 of the 74 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.
At a glance
Project
- NameGokul Vihar
- TypeResidential / Group Housing
- Location
- Vasant Vihar
- Near Sanket Thobade Nagar
- Solapur (M Corp.)
- Solapur North
- Solapur
- 413002
- Pincode413002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600050342
- ReraGenie IDRG-MH-37904
Builder
- NameAakruti Builders
- Entity typePartnership
- PartnersSudhir Balvantrao Kulkarni, Pramod Vasantrao Patil
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Apr 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings4 building records
- Documents filed137 files
Current status
Figures as on 2 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Building | NA | 2 | 2 | 6 | 0 | 6 |
| B Building | NA | 2 | 2 | 6 | 0 | 6 |
| C Building | NA | 2 | 2 | 6 | 0 | 6 |
| BUILDING D | NA | 7 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 33 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.
A Building0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B Building0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C Building0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING DNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| A Building | 6 | 6 |
| B Building | 6 | 6 |
| C Building | 6 | 6 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mahesh Mallinath Patil |
| Engineer | Rajesh M Dudhmande |
| Engineer | Ajinkya Shashikant Jiddimani |
| Chartered Accountant | Ganesh Mallikarjun Pawle |
| Partner | Role in project |
|---|---|
| Aakruti Builders | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jun 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Jun 2025
Documents filed137
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: form 1 300625.pdf | 2 May 2026 |
| Form 3File: form 3 300625.pdf | 2 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 300625.pdf | 2 May 2026 |
| Form 2File: form 2 30062025.pdf | 2 May 2026 |
| Form 1File: Forim 1 Architects Certificate 30_06_2023.pdf | 1 May 2026 |
| Form 2File: Form 2 Engineer Certificate 30_06_2023.pdf | 1 May 2026 |
| Form 3File: Form 3 CA Certificate 30_06_2023.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 300623.pdf | 1 May 2026 |
| Form 1File: Form 1 Architects Certificate 30_09_2023.pdf | 1 May 2026 |
| Form 2File: Form 2 Engineers Certificate 30_09_2023.pdf | 1 May 2026 |
| Form 3File: Form 3 CA Certificate 30_09_2023.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 300923.pdf | 1 May 2026 |
| Form 1File: Form 1 Architect Certificate 31_12_2023.pdf | 1 May 2026 |
| Form 2File: Form 2 Engineers Certificate 31_12_2023.pdf | 1 May 2026 |
| Form 3File: Form 3 CA Certificate 31_12_2023.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 311223.pdf | 1 May 2026 |
| Form 1File: Form 1 Architects Certificate 31_03_2024.pdf | 1 May 2026 |
| Form 2File: Form 2 Engineers Certificate 31_03_2024.pdf | 1 May 2026 |
| Form 3File: Form 3 CA Certificate 31_03_2024.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 310324.pdf | 1 May 2026 |
| Form 1File: Form 1 Arhitect Certificate 30_06-024.pdf | 1 May 2026 |
| Form 2File: Form 2 Engineers Certificate 30_06_2024.pdf | 1 May 2026 |
| Form 3File: Form 3 CA Certificate 30_06_2024.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 30062024.pdf | 1 May 2026 |
| Form 1File: Form 1 Architect Certificate 30_09_2024.pdf | 1 May 2026 |
| Form 2File: Form 2 Engineer Certificate 30_09_2024.pdf | 1 May 2026 |
| Form 3File: Form 3 CA_Certificate 30_09_2024.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 30092024.pdf | 1 May 2026 |
| Form 1File: Form 1 Architects Certificate 31_12_2024.pdf | 1 May 2026 |
| Form 2File: Form 2 Engineers Certificate 31_12_2024.pdf | 1 May 2026 |
| Form 3File: Form 3 CA Certificate 31_12_2024.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 31122024.pdf | 1 May 2026 |
| Form 1File: Form 1 Architects Certificate 31_03_2025.pdf | 1 May 2026 |
| Form 2File: Form 2 Engineers Certificate 31_03_2025.pdf | 1 May 2026 |
| Form 3File: From 3 CA Certificate 31_03_2025.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 310325.pdf | 1 May 2026 |
| Form 1File: form 1 311225-1-4.pdf | 1 May 2026 |
| Form 2File: form 2 311225.pdf | 1 May 2026 |
| Form 3File: form 3 311225.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 311225.pdf | 1 May 2026 |
| Form 1File: Form 1 300925-1-4.pdf | 1 May 2026 |
| Form 2File: Form 2 300925-5-8.pdf | 1 May 2026 |
| Form 3File: Form 3 300925-9-16.pdf | 1 May 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold 300925.pdf | 1 May 2026 |
| Form 1File: form 1 aakruti 0326.pdf | 30 Apr 2026 |
| Form 2File: Form 2 Aakruti 0326.pdf | 30 Apr 2026 |
| Form 3File: Akruti Builder Form 3 March-26_compressed.pdf | 30 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold aakruti 0326.pdf | 30 Apr 2026 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23-24.pdf | 4 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 24-25.pdf | 4 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 23-24 FORM 5.pdf | 4 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: 24-25 FORM 5.pdf | 4 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate 31_03_2025.pdf | 27 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Forim 1 Architects Certificate 30_06_2023.pdf | 27 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Forim 1 Architects Certificate 30_06_2023.pdf | 27 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE sold unsold.pdf | 27 Jun 2025 |
| Building plan approvalFile: building plan_compressed.pdf | 26 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 CA Certificate 31_03_2025.pdf | 26 Jun 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Certi.pdf | 26 Jun 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: building plan_compressed.pdf | 26 Jun 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occpancy Certificat Building BC.pdf | 26 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Discloser of Sold Unsold Unit.pdf | 26 Jun 2025 |
| Building plan approvalFile: Amended Building Plan.pdf | 21 May 2025 |
| Building plan approvalFile: Amended Building Permission.pdf | 21 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Dec 2024.pdf | 21 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3 CA Certificate Dec 2024.pdf | 21 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Dec_2024 dt_10_01_2025.pdf | 21 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Building Plan.pdf | 21 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Building Permission.pdf | 21 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_01_07_2024.pdf | 21 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold _ Unsold_Inventory Dec 2024.pdf | 21 May 2025 |
| Other - TechnicalFile: Format C Application for correction under project.pdf | 21 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_ 01_10_2024.pdf | 21 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_ 01_10_2024.pdf | 21 May 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Form 2A_05_01_2025.pdf | 21 May 2025 |
| Building plan approvalFile: Revised Building Plan_compressed.pdf | 19 Feb 2025 |
| Declaration in FORM BFile: Format B Designated Bank account BOB.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE AKRUTI BUILDER'S D BUILDING.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec-24 Akruti Builders.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE AKRUTI BUILDER'S D BUILDING.pdf | 19 Feb 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 137 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Gokul Vihar on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Sanket Thobade Nagar550+ in Solapur
Filed coordinates, straight-line distance. 43 registered projects within 2 km.
SAMRUDDHI PARKWAY
NAGNATH SHIVSHANKAR AKKALKOTE
Tirumala Paradise
Sachin Vitthal Ghanate
Madhuban Paradise Part-II
Madhuri Lature
SUYOG SHRUSHTI PHASE 2
SUYOG DEVELOPERS
Radha Garden
Sudhir Patil
Heaven Galaxy
Altaf Abdulhamid Shaikh
See every Solapur project, with the district possession charts
Builder: Aakruti Builders
Aakruti Builders has 1 registration on MahaRERA, including Gokul Vihar. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if Gokul Vihar is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Gokul Vihar?
The registered promoter entity is Aakruti Builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Gokul Vihar?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Gokul Vihar?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Gokul Vihar?
The professionals named in the filing: Architect: Mahesh Mallinath Patil; Engineer: Rajesh M Dudhmande; Engineer: Ajinkya Shashikant Jiddimani; Chartered Accountant: Ganesh Mallikarjun Pawle. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Gokul Vihar?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback