Completed No litigation declared Plotted project

Chhoriya Township - Plotting Layout Akkalkot

By Chhoriya and Chopda Properties

RG-MH-12345 · RERA P52600009371 · Last updated on MahaRERA portal: 14 May 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
146 of 187Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Chhoriya Township - Plotting Layout Akkalkot is a Plotted project by Chhoriya and Chopda Properties in Solapur, Maharashtra, registered with MahaRERA as P52600009371 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 41 of the 187 units on this registration are recorded sold or booked.

At a glance

Project

  • NameChhoriya Township - Plotting Layout Akkalkot
  • TypePlotted
  • Location
    • Akkalkot To Kantehalli Road
    • Akkalkot
    • Akkalkot (Rural)
    • Solapur
    • 431216
  • Pincode431216
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600009371
  • ReraGenie IDRG-MH-12345

Builder

  • NameChhoriya and Chopda Properties
  • Entity typePartnership
  • PartnersAnmol Kanhaiyalal Chhoriya, Amit Rajendra Chopda

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • BuildingsNot stated in filing
  • Documents filed60 files

Current status

22%41 of 187 units booked

Figures as on 14 May 2022, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 May 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities17

As on 14 May 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
EntranceGateYes100%
Garden Compound WallYes100%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area40,524 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Amit Rajendra ChopdaMarket YardPune

Approvals and building plan

Permissible FSI21789.37
Proposed, not sanctioned21,789 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAkkalkot

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Kunal P Patil
PartnerRole in project
Chhoriya and Chopda Properties-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600003997Dec 2019 → Dec 2020

Reason as filed by the promoterNote for State of development work - a) We have completed overall 75% of infrastructure work in layout as below, 1. Entrance gate Work 100% completed. 2. Internal Road work 100% completed. 3. Open space development work 100% completed. 4. Tree plantation work 100 % completed. 5. Electrical & Street light work 50% completed, rest in progress. b) Only drainage work, water line, part electrical & street light work pending. Reason for needing Extension for completion date of Project - Reasons - 1. We had almost completed 75% infrastructure work in layout and only 25% work is balanced as on 09/2019

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Dec 2021

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CERSAI detailsFile: CERSAI AKKALKOT.pdf14 May 2022
Certificates of CA (Form 3)File: CA MAR 2022 AKKALKOT.pdf14 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 AKKALKOT.pdf19 Mar 2022
Disclosure of sold/ booked inventoryFile: Akkalkot Plotting sold unold sep 2021.pdf31 Dec 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC AKKALKOT.pdf31 Dec 2021
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 AKKALKOT.pdf31 Dec 2021
Architect’s Certificate on Completion of Project (Form 4)File: DECLARATION ABOUT COMPLETION AKKALKOT-merged.pdf31 Dec 2021
OtherFile: MSEB SANCTIONING LETTER AKKALKOT.pdf31 Dec 2021
Declaration about Commencement CertificateFile: DECLARATION about commencement certificate Akkolkot plotting.pdf10 Dec 2021
Certificates of CA (Form 3)File: AKKALKOT FORM 3 CA_compressed.pdf27 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Akklkot plotting (March - 19).pdf18 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Akklkot plotting (March - 20).pdf18 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CHHORIYA TOWNSHIP PLOTTING LAYOUT AKKALKOT PHASE 1.pdf14 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CHHORIYA TOWNSHIP PLOTTING LAYOUT AKKALKOT PHASE_1.pdf14 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Akkalkot Arch _ Up to Dec 19.pdf6 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Akkalkot Eng _ Up to Dec 19.pdf6 Jul 2020
Certificates of CA (Form 3)File: Akkalkot CA _ Up to Dec 19.pdf6 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Akkalkot AR certificate.pdf31 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Akkalkot Engg certificate.pdf31 Dec 2019
Certificates of CA (Form 3)File: Akkalkot Ca certificate.pdf31 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Akkalkot Archi Certificate Up To - June 19.pdf19 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Akkalkot Eng Certificate Up To - June 19.pdf19 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Quality Assurance June - 19.pdf19 Dec 2019
Certificates of CA (Form 3)File: Akkalkot CA Certificate Up To - June 19.pdf19 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi certificate Akkalkot up To March -19.pdf23 Aug 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Quality Assurance certificate Akkalkot up To March -19.pdf23 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Akkalkot up To March -19.pdf20 Jun 2019
Certificates of CA (Form 3)File: Ca certificate Akkalkot up To March -19.pdf20 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi certificate Akkalkot up To Dec - 18.pdf29 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Akkalkot up To Dec - 18.pdf29 May 2019
Certificates of CA (Form 3)File: CA certificate Akkalkot up To Dec - 18.pdf29 May 2019
Certificates of CA (Form 5)File: Akkalkot Plotting Form -5.pdf4 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi certificate Akkalkot up To Sep - 18.pdf3 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate Akkalkot up To Sep - 18.pdf3 Jan 2019
Certificates of CA (Form 3)File: Engg certificate Akkalkot up To Sep - 18.pdf3 Jan 2019
Certificates of CA (Form 3)File: Ca certificate Akkalkot up To Sep - 18.pdf3 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cer Akkalkot _ Up To June 2018.pdf12 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Akkalkot _ Up To June - 2018.pdf12 Sep 2018
Certificates of CA (Form 3)File: CA Cer Akkalkot _ Up To June - 2018.pdf12 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cer Jane To march 2018.pdf15 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Akalkot Eng Cer Jane To march 2018.pdf15 Jun 2018
Certificates of CA (Form 3)File: Akkalkot CA Cer Jane To march 2018.pdf15 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Cer Akkalkot Plotting _ Up Dec 2017.pdf5 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Akkalkot Plotting _ Up Dec 2017.pdf5 Apr 2018
Certificates of CA (Form 3)File: Ca Cer Akkalkot Plotting _ Up Dec 2017.pdf5 Apr 2018
Building plan approval or NA orderFile: Akkakot Layout Plan.pdf30 Jul 2017
Layout approvalFile: Akkakot Layout Plan.pdf30 Jul 2017
Layout approvalFile: Akkakot Future Phase Plan.pdf30 Jul 2017
PAN CardFile: CHHORIYA CHOPDA PAN.pdf30 Jul 2017
Copy of the legal title reportFile: Akkalkot Search Report.pdf30 Jul 2017
Details of encumbrancesFile: Akkalkot Encumbrances Certificate.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Akkakot Layout Plan.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Akkakot Future Phase Plan.pdf30 Jul 2017
Building Plan Approval (IOD)File: Akkakot Layout Plan.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Akkalkot NA Order.pdf30 Jul 2017
Declaration in FORM BFile: Akkalkot Declaration Form - B.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Cer Akkalkot.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg Cer akkalkot.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Akkalkot.pdf30 Jul 2017
Proforma of Allotment letterFile: Akkakot Future Phase Plan.pdf30 Jul 2017

How this compares with Solapur

22%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one moved by 24 months
39%of Solapur registrations have lapsed or been cancelledthis one is completed

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep Chhoriya Township - Plotting Layout Akkalkot on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Akkalkot550+ in Solapur

Builder: Chhoriya and Chopda Properties

Chhoriya and Chopda Properties has 1 registration on MahaRERA, including Chhoriya Township - Plotting Layout Akkalkot. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if Chhoriya Township - Plotting Layout Akkalkot is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chhoriya Township - Plotting Layout Akkalkot?

The registered promoter entity is Chhoriya and Chopda Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chhoriya Township - Plotting Layout Akkalkot?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chhoriya Township - Plotting Layout Akkalkot?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chhoriya Township - Plotting Layout Akkalkot?

The professionals named in the filing: Architect: Mr Kunal P Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chhoriya Township - Plotting Layout Akkalkot?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chhoriya Township - Plotting Layout Akkalkot. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chhoriya Township - Plotting Layout Akkalkot to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.