Home / Browse projects / Solapur, Maharashtra / Shree Vasundhara Heights
Shree Vasundhara Heights
RG-MH-22736 · RERA P52600032564 · Last updated on MahaRERA portal: 4 Mar 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Vasundhara Heights is a Residential / Group Housing project by Kishor Rajendra Sanjekar in Solapur, Maharashtra, registered with MahaRERA as P52600032564 on 11 Jan 2022. Possession is promised by 31 Dec 2026. 32 of the 81 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameShree Vasundhara Heights
- TypeResidential / Group Housing
- Location
- Akkalkot Road
- Vishwakarma Residency
- Solapur (M Corp.)
- Solapur North
- Solapur
- 413006
- Pincode413006
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600032564
- ReraGenie IDRG-MH-22736
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Jan 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed81 files
Current status
Figures as on 4 Mar 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shree Vasundhara Heights | NA | 13 | 12 | 60 | 21 | 81 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.
Shree Vasundhara Heights: 56% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 13% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 4 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 40% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 30% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 40% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed37
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Smt. Arunjyoti Mahendra Homkar | Solapur (M Corp.) | Solapur |
| Kum Aakanksha Mahendra Homkar | Solapur (M Corp.) | Solapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Khamitkar & Associates |
| Engineer | Ankush Shingetikar |
| Chartered Accountant | S R Patwardhan Rajesh Patwardhan |
| Partner | Role in project |
|---|---|
| Kishor Rajendra Sanjekar | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form-1_Shree Vasundhara Heights-26-2-2026.pdf | 4 Mar 2026 |
| Form 2File: Ankush Form 2A 251025.PDF | 4 Mar 2026 |
| Form 3File: CA form 3 certificate.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold - Booked Inventory 24-25 - Copy - Copy.pdf | 4 Mar 2026 |
| Form 1File: Form-1_Shree Vasundhara Heights-26-2-2026.pdf | 4 Mar 2026 |
| Form 2File: Ankush Form 2A 251025.PDF | 4 Mar 2026 |
| Form 3File: CA form 3 certificate.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold - Booked Inventory 24-25 - Copy - Copy.pdf | 4 Mar 2026 |
| Form 1File: Kamaitkar Form 1.PDF | 12 Sep 2025 |
| Form 2File: Ankush Form 2A.PDF | 12 Sep 2025 |
| Form 3File: Form 3 Rera 24-25.PDF | 12 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold - Booked Inventory 24-25 (1).pdf | 12 Sep 2025 |
| OthersFile: Revised Building Permission 2.pdf | 12 Sep 2025 |
| Form 1File: Archite Certificate For QA 24-25.PDF | 12 Sep 2025 |
| Form 2File: Eng Certificate For QA 24-25.PDF | 12 Sep 2025 |
| Form 3File: C A REPORT FORM 3 2024-25.pdf | 12 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold - Booked Inventory 24-25.pdf | 12 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archite Certificate For QA 24-25.PDF | 12 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A REPORT FORM 3 2024-25.pdf | 12 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold - Booked Inventory 24-25.pdf | 12 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng Certificate For QA 24-25.PDF | 12 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Discloser of inventory 23 24.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A certificet FORM-3 24-25.PDF | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: C A certificet FORM-5 24-25.PDF | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A certificet FORM-3 24-25.PDF | 9 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Discloser of inventory 23 24.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: C A certificet FORM-5 24-25.PDF | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A certificet FORM-3 24-25.PDF | 9 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Discloser of inventory 23 24.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: C A certificet FORM-5 24-25.PDF | 9 Oct 2024 |
| Building plan approvalFile: Revised Building Permission 1.pdf | 8 Oct 2024 |
| Building plan approvalFile: Revised Building Permission 2.pdf | 8 Oct 2024 |
| Building plan approvalFile: Revised Building Permission 3.pdf | 8 Oct 2024 |
| Building plan approvalFile: Revised Building Permission 1.pdf | 8 Oct 2024 |
| Building plan approvalFile: Revised Building Permission 2.pdf | 8 Oct 2024 |
| Building plan approvalFile: Revised Building Permission 3.pdf | 8 Oct 2024 |
| Building plan approvalFile: Revised Building Permission 1.pdf | 8 Oct 2024 |
| Building plan approvalFile: Revised Building Permission 2.pdf | 8 Oct 2024 |
| Building plan approvalFile: Revised Building Permission 3.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission 1.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission 2.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission 3.pdf | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: BP Commencement Certificate.PDF | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arctitect Form 1 19-08-2024.PDF | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng Certificate For QA 23-24.PDF | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arctitect Form 1 19-08-2024.PDF | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: BP Commencement Certificate.PDF | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission 1.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission 2.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission 3.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng Certificate For QA 23-24.PDF | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arctitect Form 1 19-08-2024.PDF | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: BP Commencement Certificate.PDF | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission 1.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission 2.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Building Permission 3.pdf | 8 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Eng Certificate For QA 23-24.PDF | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DISCLOSURE OF SOLD.pdf | 17 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1.PDF | 17 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate form 3 March23.PDF | 17 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C A Certificate March23.PDF | 17 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certi Form1 Nov22.PDF | 25 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 ARCH CER.PDF | 6 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A XYZ.PDF | 6 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: SVH Document1.pdf | 6 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 33.pdf | 6 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA FORM 5.pdf | 6 Jul 2022 |
| Declaration in FORM BFile: Form B New Sanjekar.PDF | 3 Jan 2022 |
| Declaration about Commencement CertificateFile: CC Declaration .pdf | 24 Dec 2021 |
| Proforma of Allotment letterFile: SANJEKAR - VASUNDHAR HEIGHTS Agrreement to Sale Format.pdf | 24 Dec 2021 |
| Layout approvalFile: ilovepdf_merged (1).pdf | 23 Dec 2021 |
| Building plan approvalFile: ilovepdf_merged (1).pdf | 23 Dec 2021 |
| Copy of the legal title reportFile: title Vasundhara.pdf | 23 Dec 2021 |
| Details of encumbrancesFile: Encumbrance Certificate.PDF | 23 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: ilovepdf_merged (1).pdf | 23 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: ilovepdf_merged (1).pdf | 23 Dec 2021 |
| CERSAI detailsFile: CERSAI_Search_Report_200226471346_For_Asset_Based_Search_23_12_2021_14_00_59_027.pdf | 23 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate FORM -3 (SVH).PDF | 29 Nov 2021 |
| Proforma of Allotment letterFile: Allotment Letter (SVH).PDF | 23 Nov 2021 |
| PAN CardFile: PanCard Kishor Sanjekar.PDF | 20 Nov 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Shri Vishwa Residency | Laxmi Nagar Solapur | 11 | Completed | Dec 2019 | May 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shree Vasundhara Heights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vishwakarma Residency550+ in Solapur
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
Shhraddha Emrald
Shhraddha Buildcons
Mahanandi Heights
Sneharika Vijayshree Developers
HMEMPIRE210211
HERIYTAGE MANIYDHARI EMPIRE
BRAMHA GALAXY
BRAMHA BUILDCON
Panchganga Bramhaputra Heights
HANMANTU KOMARAYYA BURA
Sai Suman Nagar
Pandhe Construction Pvt Ltd
See every Solapur project, with the district possession charts
Builder: Kishor Rajendra Sanjekar
Kishor Rajendra Sanjekar has 2 registrations on MahaRERA, including Shree Vishwa Residency and Shree Vasundhara Heights. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if Shree Vasundhara Heights is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Vasundhara Heights?
The registered promoter entity is Kishor Rajendra Sanjekar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Vasundhara Heights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree Vasundhara Heights?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Vasundhara Heights?
The professionals named in the filing: Architect: Khamitkar & Associates; Engineer: Ankush Shingetikar; Chartered Accountant: S R Patwardhan Rajesh Patwardhan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Vasundhara Heights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback