Home / Browse projects / Solapur, Maharashtra / TIRUPATI PURAM
TIRUPATI PURAM
By TIRUPATI CONSTRUCTION PRAMOTERS AND DEVELOPERS
RG-MH-41327 · RERA P52600055784 · Last updated on MahaRERA portal: 17 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TIRUPATI PURAM is a Others project by TIRUPATI CONSTRUCTION PRAMOTERS AND DEVELOPERS in Solapur, Maharashtra, registered with MahaRERA as P52600055784 on 16 Apr 2024. Possession is promised by 4 Oct 2029. 22 of the 78 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.
At a glance
Project
- NameTIRUPATI PURAM
- TypeOthers
- Location
- OLD AKLUJ ROAD
- PANDHARPUR
- Solapur
- 413304
- Pincode413304
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600055784
- ReraGenie IDRG-MH-41327
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Apr 2024
- Promised completion4 Oct 2029
- Revised completionNone
- Buildings2 building records
- Documents filed62 files
Current status
Figures as on 17 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 6 | 6 | 40 | 5 | 45 |
| Building B | NA | 6 | 6 | 30 | 3 | 33 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 66%.
Building A39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 66% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed114
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Building A | 10 | 47 | 57 |
| Building B | 10 | 47 | 57 |
Land and ownership7
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Arun Kisan Devmare | PANDHARPUR | Solapur |
| Vandana Jalindhar Devmare | PANDHARPUR | Solapur |
| Amar Jalindhar Devmare | PANDHARPUR | Solapur |
| Satish Jalindhar Devmare | PANDHARPUR | Solapur |
| Sunita Sanjay Devmare | PANDHARPUR | Solapur |
| Pooja Umesh Shinde | Bhalawani | Solapur |
| Raj Sanjay Devmare | PANDHARPUR | Solapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rahul Satyapal Khamitkar |
| Engineer | Sanjay Jathade |
| Engineer | Suraj Balasaheb Nagtilak |
| Chartered Accountant | Ankush Pandurang Kaulwar |
| Partner | Role in project |
|---|---|
| TIRUPATI CONSTRUCTION PRAMOTERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 4 Oct 2029
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Tirupati Puram as on Mar 2026.pdf | 17 Apr 2026 |
| Form 2File: Form 2 - Tirupati Puram as on Mar 2026.pdf | 17 Apr 2026 |
| Form 3File: Form 3 - Tirupati Puram as on Mar 2026.pdf | 17 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Tirupati Puram as on Mar 2026.pdf | 17 Apr 2026 |
| Form 1File: Form 1 - Tirupati Puram as on Dec 2025.pdf | 17 Apr 2026 |
| Form 3File: Form 3 - Tirupati Puram as on Dec 2025.pdf | 17 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Tirupati Puram as on Dec 2025.pdf | 17 Apr 2026 |
| Form 2File: Form 2 - Tirupati Puram as on Mar 2026.pdf | 17 Apr 2026 |
| Form 1File: Form1 June25.pdf | 14 Oct 2025 |
| Form 2File: Form2 June25.pdf | 14 Oct 2025 |
| Form 3File: Form3 Till June 25.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Sold or Booked Inventory till JUNE25.pdf | 14 Oct 2025 |
| Form 1File: Form1-Till September25.pdf | 14 Oct 2025 |
| Form 2File: Form2 Till September25.pdf | 14 Oct 2025 |
| Form 3File: Form3 Till September25.pdf | 14 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuer of Sold or Booked Inventory till September25.pdf | 14 Oct 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - March 2025.pdf | 23 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2025_Tirupati Puram.pdf | 20 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2025.pdf | 20 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 2024.pdf | 21 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 May25.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Tirupati Puram as on Dec 2024.pdf | 26 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Tirupati Puram as on Dec 2024.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Tirupati Puram as on Dec 2024.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Tirupati Puram as on September 2024.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Tirupati Puram as on September 2024.pdf | 2 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PF (1).pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOrm 1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PF (1).pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3.pdf | 20 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Other - Technical (17).pdf | 23 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance -Finance.pdf | 21 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance -Finance.pdf | 21 Mar 2024 |
| Other - TechnicalFile: CC Verification.pdf | 8 Mar 2024 |
| Other - TechnicalFile: Order 50.pdf | 8 Mar 2024 |
| Proforma of Agreement for saleFile: AFS _Tirupati Puram_Tirupati Construction Promoters Developers_22032024.pdf | 3 Mar 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Conveyance legal.Pdf | 3 Mar 2024 |
| Status of ConveyanceFile: Society Conveyance legal.Pdf | 3 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report Agreement for Sale.pdf | 3 Mar 2024 |
| Other - LegalFile: Society Conveyance legal.Pdf | 3 Mar 2024 |
| Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development (67)-1.pdf | 22 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development (67)-1.pdf | 22 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank Account Report Format A.pdf | 22 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report AL.pdf | 22 Feb 2024 |
| Copy of the legal title reportFile: Title Search Report.pdf | 21 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final-Tirupati puram.pdf | 21 Feb 2024 |
| Declaration in FORM BFile: form B PROMOTER PURAM.pdf | 20 Feb 2024 |
| CERSAI detailsFile: Cersai Report 1.pdf | 20 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real estate organisation Shardul.pdf | 20 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real estate organisation Shashank.Pdf | 20 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Legal.pdf | 19 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf | 19 Feb 2024 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (16) (2).pdf | 19 Feb 2024 |
| Proforma of Allotment letterFile: Puram-Proforma Allotment Letter.pdf | 19 Feb 2024 |
| Building plan approvalFile: DEVMARE_PLAN.pdf | 8 Jan 2024 |
| PAN CardFile: PAN - Tirupati C P D.pdf | 8 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: DEVMARE_PLAN.pdf | 8 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: DEVMARE_CC.pdf | 8 Jan 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Pujari CT | Pujari CT College Chowk Pune Road Pandharpur 413304 | 158 | Completed | Jun 2026 | May 2023 |
| Tirupati Royal Homes | Survey No 105 College chowk Pandharpur 413304 | 15 | Completed | Mar 2024 | Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TIRUPATI PURAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PANDHARPUR550+ in Solapur
CHHORIYA TOWNSHIP WAKHARI PANDHARPUR PHASE 3
Chhoriya Properties And Development Compan
Chhoriya Township Wakhari Pandharpur Phase 2
Chhoriya Properties And Development Compan
Chhoriya Residency - Pandharpur
Dhariwal And Chhoriya Developers LLP
CENTER-PRIDE
AMOL DATTATRAY NAGTILAK
Aarambha Residency
Aarambha Residency
MAHESH COMPLEX
SHRI CHAITANYA ADHYATMIK TRUST
See every Solapur project, with the district possession charts
Builder: TIRUPATI CONSTRUCTION PRAMOTERS AND DEVELOPERS
TIRUPATI CONSTRUCTION PRAMOTERS AND DEVELOPERS has 3 registrations on MahaRERA, including TIRUPATI PURAM and Tirupati Puram II. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if TIRUPATI PURAM is delayed beyond 4 Oct 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TIRUPATI PURAM?
The registered promoter entity is TIRUPATI CONSTRUCTION PRAMOTERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAGFT4566L1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TIRUPATI PURAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TIRUPATI PURAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TIRUPATI PURAM?
The professionals named in the filing: Architect: Rahul Satyapal Khamitkar; Engineer: Sanjay Jathade; Engineer: Suraj Balasaheb Nagtilak; Chartered Accountant: Ankush Pandurang Kaulwar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TIRUPATI PURAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback