ANANTA SOLAPUR
RG-MH-20282 · RERA P52600011351 · Last updated on MahaRERA portal: 9 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 55 complaints at MahaRERA
- Completion date moved by 111 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANANTA SOLAPUR is a Residential / Group Housing project by PROPWIZZ INFRA LLP in Solapur, Maharashtra, registered with MahaRERA as P52600011351 on 31 Aug 2017. Possession is promised by 31 Mar 2029. The completion date has moved by 111 months from the original filing. 163 of the 385 units on this registration are recorded sold or booked, and 23 of 110 construction stages are filed complete. 55 complaints are on record with the regulator.
At a glance
Project
- NameANANTA SOLAPUR
- TypeResidential / Group Housing
- Location
- Solapur (M Corp.)
- Solapur North
- Solapur
- 413008
- Pincode413008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52600011351
- ReraGenie IDRG-MH-20282
Builder
- NamePROPWIZZ INFRA LLP
- Entity typePartnership
- GSTIN27AAOFP8182A3ZY
- PartnersARSHAD NAVROZ TEJANI, NAVROZ SADRUDDIN TEJANI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion31 Mar 2029
- Revised completionRevised to 31 Mar 2029 (originally 30 Dec 2019)
- Buildings10 building records
- Documents filed44 files
Current status
Figures as on 9 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CARNATION A | NA | 4 | 4 | 56 | 0 | 56 |
| CARNATION B | NA | 10 | 0 | 0 | 0 | 0 |
| TULIP A | NA | 4 | 0 | 0 | 0 | 0 |
| TULIP B | NA | 10 | 0 | 56 | 0 | 56 |
| TULIP C | NA | 10 | 0 | 56 | 0 | 56 |
| LOTUS | NA | 5 | 0 | 49 | 0 | 49 |
| ASTRA | NA | 4 | 0 | 56 | 0 | 56 |
| ORCHID A | NA | 4 | 0 | 0 | 0 | 0 |
| ORCHID B | NA | 10 | 0 | 56 | 0 | 56 |
| ORCHID C | NA | 10 | 0 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building10
As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
23 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Slabs of Super Structure, at 90%.
CARNATION A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
CARNATION B64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TULIP A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TULIP B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TULIP C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LOTUS0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ASTRA0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ORCHID A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ORCHID B18%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 50% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ORCHID C65%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed134
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| CARNATION A | 1 | 14 | 15 |
| CARNATION B | 1 | 14 | 15 |
| TULIP A | 1 | 12 | 13 |
| TULIP B | 1 | 12 | 13 |
| TULIP C | 1 | 12 | 13 |
| LOTUS | 1 | 12 | 13 |
| ASTRA | 1 | 12 | 13 |
| ORCHID A | 1 | 12 | 13 |
| ORCHID B | 1 | 12 | 13 |
| ORCHID C | 1 | 12 | 13 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | THE FIRM |
| Architect | Tauhid Ahmed Md Iqbal Shaikh |
| Engineer | Saqlain I Shaikh |
| Chartered Accountant | TODI TULSYAN & CO |
| Chartered Accountant | Ranka Dargar & Co |
| Partner | Role in project |
|---|---|
| PROPWIZZ INFRA LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterMR NAVROZ S TEJANI'S DEATH AND THE PROJECT IS HANDELLED BY HIS WIDOW MRS NASEEM TEJANI.
Reason as filed by the promoterWe hereby declare that our above project has expired on 31.12.2021 and we hereby submit our application for extension for completion of the project valid till 30.12.2029 u/s7(3) of RERA. Our Project got delayed due to COVID impact, labour problem, sudden death of father of the working partner, least market demand of flats in the area, financial crunch, non-payment by allottees on time, etc. We are clear and committed that our project will be completed by 31.03.2029
Complaints filed with MahaRERA55
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000147207 | Abuali Malik Shroff | Propwizz Infra LLP | 07/06/2022 |
| CC005000000043787 | VIJAYKUMAR DASHARATH KHARAT | ARSHAD NAVROZ TEJANI | 27/03/2021 |
| CC005000000053907 | JIGAR SHAH | arshad Navroj Tejani | 08/01/2020 |
| CC005000000053919 | RAVIKIRAN MADHUSUDAN PAILWAN | ARSHAD NAVROJ TEJANI | 12/01/2020 |
| CC005000000053911 | RUPALI ARUN SONAVANE | ARSHAD NAVROJ TEJANI | 12/01/2020 |
| CC005000000053921 | MALLIKARJUN PATANSHETTI | ARSHAD NAVROJ TEJANI | 12/01/2020 |
| CC005000000053934 | POOJA DEVIDAS HANCHATE | ARSHAD NAVROJ TEJANI | 25/01/2020 |
| CC005000000053935 | RAJU HANMANTU DAMBARE | ARSHAD NAVROJ TEJANI | 14/01/2020 |
| CC005000000053975 | Vinayak Krishna Pancharane | Propwizz Infra LLP through its Partner Arshand Navroj Tejani | 23/02/2021 |
| CC005000000054009 | Sanjay Prabhakar Deshmukh | Arshad Navroj Tejani | 23/02/2020 |
| CC005000000054094 | Kavita Anil Kshirsagar | Propwizz Infra LLP through its Partner Arshad Navroj Tejani | 11/03/2021 |
| CC005000000054146 | Vaman Mallesha Dhulrao | Arshad Navroj Tejani | 15/03/2020 |
| CC005000000054160 | Suresh Bhimrao Gaikwad | Prop Wizz Infra LLP Arshad Navroz Tejani Navroz S Tejani | 14/08/2020 |
| CC005000000064446 | Renu Ajaykumar Sharma | Propwizz Infra LLP through its partner Arshad navroj Tejani | 20/01/2021 |
| CC005000000075101 | Abhay Kumar Sharma | Propwizz Infra LLP through Its Partner Ashard Tejani | 20/01/2021 |
| CC005000000075113 | Rajashree Panchakshari Swami | Propwizz Infra LLP through Its Partner Ashard Tejani | 03/02/2021 |
| CC005000000075111 | Layqua Murtja Kadari Mangoli | Propwizz Infra LLP Through Its Partner Arshad Tejani | 07/02/2021 |
| CC005000000075151 | Nanasaheb Panditrao Arjun | Propwizz Infra LLP Through Its Partner Arshad Tejani | 20/02/2021 |
| CC005000000085232 | Mahantappa Bhimasha Awate | Propwizz Infra LLP Through its Partner Mr. Arshad Navroj Tejani | 19/02/2021 |
| CC005000000085240 | Vijay Maruti Borade | Propwizz Infra LLP through Its Partner Ashard Tejani | 23/02/2021 |
| CC005000000085259 | Manoj Madhukar Dole | Propwizz Infra LLP through Its Partner Ashard Tejani | 25/02/2021 |
| CC005000000085287 | Jitendra Nagnath Patil | Propwizz Infra LLP Through Its Partner Arshad Tejani | 01/03/2021 |
| CC005000000085288 | Anula Machindra Shinde | Propwizz Infra LLP through Its Partner Ashard Tejani | 03/03/2021 |
| CC005000000085312 | Sunil Advyappa Upase | Propwizz Infra LLP through Its Partner Ashard Tejani | 07/03/2021 |
| CC005000000085332 | Mahananda Avinash Birajdar | Propwizz Infra LLP Through Its Partner Arshad Tejani | 17/03/2021 |
| CC005000000085335 | Tousif Latif Patil | Propwizz Infra LLP through Its Partner Ashard Tejani | 14/03/2021 |
| CC005000000085367 | Swapnil Maruti More | Propwizz Infra LLP through Its Partner Ashard Tejani | 22/03/2021 |
| CC005000000085372 | Kiran Navnath Kangare | Propwizz Infra LLP Through Its Partner Arshad Tejani | 23/04/2021 |
| CC005000000085374 | Anand Navnath Kangare | Propwizz Infra LLP Through Its Partner Arshad Tejani | 23/04/2021 |
| CC005000000085376 | DK Shrinivas | Propwizz Infra LLP Through Its Partner Arshad Tejani | 22/03/2021 |
| CC005000000085377 | Ogeppa Nilappa Utage | Propwizz Infra LLP through Its Partner Ashard Tejani | 23/03/2021 |
| CC005000000085382 | Narasayya Bavayya Mhetre | Propwizz Infra LLP through Its Partner Ashard Tejani | 25/03/2021 |
| CC005000000085383 | Rishikesh Jaydipsingh Rajpoot | Propwizz Infra LLP through Its Partner Ashard Tejani | 25/03/2021 |
| CC005000000085384 | Sunil Rajshekhar Kalase | Propwizz Infra LLP through Its Partner Ashard Tejani | 23/07/2021 |
| CC005000000085386 | Satish Jambuvant Lad | Propwizz Infra LLP through Its Partner Ashard Tejani | 26/03/2021 |
| CC005000000085394 | Sunil Shivaji Jadhav | Propwizz Infra LLP Through Its Partner Arshad Tejani | 10/04/2021 |
| CC005000000085398 | Sunil Baliram Londhe | Propwizz Infra LLP through Its Partner Ashard Tejani | 28/03/2021 |
| CC005000000085437 | Vidyasagar Laxman Jagtap | Propwizz Infra LLP Through Its Partner Arshad Tejani | 10/04/2021 |
| CC005000000085440 | Surendra Rangayya Guntuk | Propwizz Infra LLP Through Its Partner Arshad Tejani | 11/04/2021 |
| CC005000000085487 | Dilip Sheshgiri Algundagi | Propwizz Infra LLP through Its Partner Ashard Tejani | 23/04/2021 |
| CC005000000085491 | Ravindra Krishna Kangare | Propwizz Infra LLP through Its Partner Ashard Tejani | 23/04/2021 |
| CC005000000085637 | Prasanna Nagesh Gawali | Propwizz Infra LLP Through Its Partner Arshad Tejani | 03/06/2021 |
| CC005000000096152 | Reshma Ravikiran Bhosale | Propwizz Infra LLP Through Its Partner Arshad Tejani | 13/12/2021 |
| CC005000000106790 | MR. AVINASH VISHNU NARAYANKAR | PROP WIZZ LLP | 20/03/2022 |
| CC005000000106791 | MRS. HEMLATA DAWAL KOKANE | PROP WIZZ LLP | 20/03/2022 |
| CC005000000116913 | Suyash Keshav Shinde | propwizz Infra LLP thorugh its partner Arshad Tejani | 02/07/2022 |
| CC005000000116914 | Vrushali Keshav Shinde | Propwizz Infra LLP through its Partner Ashard Tejani | 28/06/2022 |
| CC005000000157241 | Dhawalkirti Sharad Gaikwad | propwizz Infra LLP thorugh its partner Arshad Tejani | 02/07/2022 |
| CC12500615 | RAM DATTATRAY BANDGAR | PROPWIZZ INFRA LLP | 22/02/2025 |
| CC12500534 | YASHWANT IRAPPA ARLIMAR | PROPWIZZ INFRA LLP | 16/02/2025 |
| CC12500657 | DADARAO DATTATRAYA BANDGAR | PROPWIZZ INFRA LLP | 24/02/2025 |
| CC12500677 | Harish Shivsharan nandi | PROPWIZZ INFRA LLP | 26/02/2025 |
| CC12500800 | Vithal Baburao Jadhav | PROPWIZZ INFRA LLP | 09/03/2025 |
| CC12500888 | Virbhadra Baburao Goge | PROPWIZZ INFRA LLP | 13/03/2025 |
| CC12501933 | MAHANTAPPA BHIMASHA AWATE | PROPWIZZ INFRA LLP | 12/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2029
Documents filed44
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 1File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 1File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 1File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 1File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 2File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 2File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 2File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 2File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 2File: Form 2 as on 31-3-2021.pdf | 9 May 2026 |
| Withdrawal Update Form 3File: PILLP Form 3 (1)_11zon.pdf | 9 May 2026 |
| Withdrawal Update Form 3File: PILLP Form 3 (1)_11zon.pdf | 9 May 2026 |
| Withdrawal Update Form 3File: PILLP Form 3 (1)_11zon.pdf | 9 May 2026 |
| Withdrawal Update Form 3File: PILLP Form 3 (1)_11zon.pdf | 9 May 2026 |
| Withdrawal Update Form 3File: PILLP Form 3 (1)_11zon.pdf | 9 May 2026 |
| Certificates of CA (Form 3)File: Form3_Ananta Solapur as on 31-3-2021.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5_as on 17_18 signed.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_as on 18_19_signed.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_as on 19_20 signed.pdf | 1 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_as on 20-21_signed.pdf | 1 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 2 as on 31-3-2018.pdf | 30 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 2 as on 31-3-2019.pdf | 30 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 2 as on 31-3-2020.pdf | 30 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 2 as on 31-3-2021.pdf | 30 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 31-3-2018.pdf | 30 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 31-3-2019.pdf | 30 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 31-3-2020.pdf | 30 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 31-3-2021.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Form 3_ Old format_as on 31-3-2018_compressed.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Form 3_Ananta Solapur 31-3-2019_compressed.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Form3_Ananta Solapur as on 31-3-2020_compressed.pdf | 30 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (Architect's Certificate)-solapur.pdf | 4 Aug 2017 |
| Details of encumbrancesFile: Encumberence.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Notry Document.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: CA.pdf | 31 Jul 2017 |
| Building plan approvalFile: Building Premission Revised Layout Plan Ananta Solapur.pdf | 29 Jul 2017 |
| Layout approvalFile: TP Final.pdf | 29 Jul 2017 |
| PAN CardFile: Pancard PropWizz.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Bank_Of_India_RBC Compressed.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: TP Final.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: Building Premission Revised Layout Plan Ananta Solapur.pdf | 29 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised Building Permission Ananta Solapur 31-03-2017.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Agreement_to_sale_-Ananta Solapur Blank.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 44 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANANTA SOLAPUR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Solapur (M Corp.)550+ in Solapur
FOUR SEASONS
T6 REALTY PVT LTD
GALAXY GOLD
GALAXY DEVELOPERS
Takalikars Prosperity
AJIT NARSINHA TAKALIKAR
Aryash Pristine
Abhijeet Ajit Takalikar
Aryash Residency
Abhijeet Ajit Takalikar
IMP GREENS PRAKRITI BUILDING PHASE II
IMP REALTY PRIVATE LIMITED
See every Solapur project, with the district possession charts
Builder: PROPWIZZ INFRA LLP
PROPWIZZ INFRA LLP has 1 registration on MahaRERA, including ANANTA SOLAPUR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if ANANTA SOLAPUR is delayed beyond 31 Mar 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANANTA SOLAPUR?
The registered promoter entity is PROPWIZZ INFRA LLP, a partnership as per the filing. Its GSTIN 27AAOFP8182A3ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANANTA SOLAPUR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ANANTA SOLAPUR?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ANANTA SOLAPUR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANANTA SOLAPUR?
The professionals named in the filing: Architect: THE FIRM; Architect: Tauhid Ahmed Md Iqbal Shaikh; Engineer: Saqlain I Shaikh; Chartered Accountant: TODI TULSYAN & CO; Chartered Accountant: Ranka Dargar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANANTA SOLAPUR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.