Home / Browse projects / Solapur, Maharashtra / INDRADHANU-Phase-IV

Registered No litigation declared Residential / Group Housing project

INDRADHANU-Phase-IV

By M/S Ganesh Ramchandra Apte

RG-MH-91492 · RERA P52600014920 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 35 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 35 months from the original
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 98%
44 of 126Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

INDRADHANU-Phase-IV is a Residential / Group Housing project by M/S Ganesh Ramchandra Apte in Solapur, Maharashtra, registered with MahaRERA as P52600014920 on 11 Jan 2018. Possession is promised by 31 Dec 2028. The completion date has moved by 35 months from the original filing. 82 of the 126 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameINDRADHANU-Phase-IV
  • TypeResidential / Group Housing
  • Location
    • Mangalwedha Road
    • Laxmi Peth
    • Solapur North
    • Solapur
    • 413001
  • Pincode413001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600014920
  • ReraGenie IDRG-MH-91492

Builder

  • NameM/S Ganesh Ramchandra Apte
  • Entity typePartnership
  • PartnersVinay Vasant Apte, Aparna Milind Venegurkar, Mahesh Vasant Apte, Sarang Arvind Apte, Sharmila Sanjay Venegurkar, Vikas Shankar Koli, Chetan Narsinh Phatak, Malhar Arun Karande, Vishaka Vijay Marathe, Swati Umesh Marathe, Alhad Vamanrao Apte, Nitin Vasant Apte
  • Other registrations7 more →
  • Completed2 of 8
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2018First promiseJan 2026Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jan 2018
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Jan 2026)
  • Buildings1 building record
  • Documents filed92 files

Current status

65%82 of 126 units booked
58.2%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing VNA21161260126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 98%.

Wing V: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)82%
Podiums (if any)82%
Plinth0%
Stilt Floor82%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises44%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks28%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingYes80%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,200 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySolapur Municipal Corporation
Permissible FSI129916.51
Proposed, not sanctioned65,402 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTilak Chowk Solapur
Estimated costRs 24.05 cr
Cost incurredRs 13.99 cr
Work done58.17%
BuildingWingEstimatedIncurred
Wing VNARs 24.05 crRs 13.99 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR. Vidya Mahendra Akkalkote
ArchitectZeeshan E Mundewadi
EngineerSTRUDCOM CONSULTANTS PVT LTD
EngineerAbhishek Nitin Apte
EngineerAMOL MEHTA
EngineerSaqlain Imamuddin Shaikh
Chartered AccountantS K I AND ASSOCIATES
PartnerRole in project
M/S Ganesh Ramchandra Apte-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05032620101Jan 2026 → Dec 2028

Reason as filed by the promoterThe Delay has occurred due to Covid Pandemic more than 2 to 3 years project construction was went in very slow phase and there was no booking from customer due to pandemic and labour and Material not provided at proper due to financial issues

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Indradhanu Phase IV Jun 2026 Form 1.pdf20 Jul 2026
Withdrawal Update Form 2File: Indradhanu Phase IV Jun 2026 Form 2.pdf20 Jul 2026
Withdrawal Update Form 3File: Indradhanu Phase IV Jun 2026 Form 3.pdf20 Jul 2026
Withdrawal Update Form 1File: Indradhanu Phase IV Mar 2026 Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Indradhanu Phase IV Mar 2026 Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Indradhanu Phase IV Mar 2026 Form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: Indradhanu Phase 4 Jan 2026 Form 1.pdf5 Mar 2026
Withdrawal Update Form 2File: Indradhanu Phase 4 Jan 2026 Form 2.pdf5 Mar 2026
Withdrawal Update Form 3File: Indradhanu Phase 4 Jan 2026 Form 3.pdf5 Mar 2026
Withdrawal Update Form 1File: Indradhanu Phase 4 Dec 2025 Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Indradhanu Phase 4 Dec 2025 Form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: Indradhanu Phase IV Dec 2025 Form 3.pdf20 Jan 2026
Withdrawal Update Form 1File: Indradhanu Phase 4 Sep 2025 Form 1.pdf20 Oct 2025
Withdrawal Update Form 2File: Indradhanu Phase 4 Sep 2025 Form 2.pdf20 Oct 2025
Withdrawal Update Form 3File: Indradhanu Phase 4 Sep 2025 Form 3.pdf20 Oct 2025
Form 1File: Indradhanu Phase 4 Jun 2025 Form 1.pdf20 Jul 2025
Form 2File: Indradhanu Phase 4 Jun 2025 Form 2.pdf20 Jul 2025
Form 3File: Indradhanu Phase 4 Jun 2025 Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Indradhanu Phase 4 Jun 2025 Booking Details.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: Indradhanu Phase 4 Jun 2025 Self Declaration.pdf20 Jul 2025
Form 1File: Indradhanu Phase 4 Mar 2025 Form 1.pdf20 Jul 2025
Form 2File: Indradhanu Phase 4 Mar 2025 Form 2.pdf20 Jul 2025
Form 3File: Indradhanu Phase 4 Mar 2025 Form 3.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Indradhanu Phase 4 Mar 2025 Booking Details.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: Indradhanu Phase 4 Mar 2025 Self Declaration.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 4 Q4.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 4 Q4.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Phase 4 Sold and Unsold Q4.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 4.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 4.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Phase 4 Booked inventory 31 12 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-ARCHI CERI-PH-4.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-GRA-PH-4.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: INVENTORY-PH-4-V-WING-DTD-30-09-2024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-ARCHI CERI-PH-4.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-GRA-PH-4.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: INVENTORY-PH-4-V-WING-DTD-30-09-2024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 4 GRA-PH-4-FORM 1-ARCH CERTI.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 4 GRA-PH-4-FORM-2-ENGI CERTI.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Phase 4 INDRADHANU-PH-4-INVENTORY.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GRA-PH-4-FORM 1-ARCH CERTI.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GRA-PH-4-FORM-2-ENGI CERTI.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: INDRADHANU-PH-4-INVENTORY.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHI CERTI-PH-4.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHI CERTI-PH-4.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH-4-ENGI CERTI.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PH-4-ENGI CERTI.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: INVENTORY-PH-4-WING-V.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ph 4 form 1.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG-CERTI-ph-4.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: INVENTORY PH 4 WING V.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: f1 phase 4.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 p4.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: inve p4.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: indradhanu ph 4 f1 2018.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: indradhanu ph4 f1 2019.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: indradhanu ph4 f1 2020.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: indradhanu ph4 f1 2021.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: indradhanu ph 4 f1 2023.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indradhanu ph 4 f2 2018.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indradhanu ph 4 f2 2019.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indradhanu ph 4 f2 2020.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indradhanu ph 4 f2 2021.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indradhanu ph 4 f2 2022.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: indradhanu ph 4 f2 2023.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: indradhanu ph 4 f2a 2018.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: indradhanu ph 4 f2a 2019.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: indradhanu ph 4 f2a 2022.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: indradhanu ph 4 f2a 2023.pdf4 Jul 2023
CERSAI detailsFile: phase 4.pdf8 Apr 2022
Declaration about Commencement CertificateFile: GRA PH-4-FORM D.pdf31 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-GRA PH-4_11zon.pdf31 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GRA-4-2A-2019-2020.pdf31 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GRA-4-2A-2020-2021.pdf31 Mar 2022
Disclosure of sold/ booked inventoryFile: INVENTORY-GRA-PH-4-31-03-2022_compressed.pdf31 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: indr-ph-4-IV-V wing-FORM-5.pdf16 Nov 2019
Certificates of CA (Form 5)File: V wing.pdf30 Sep 2018
Layout approvalFile: 1.pdf4 Jan 2018
Building plan approvalFile: 2.pdf4 Jan 2018
Building plan approvalFile: 3.pdf4 Jan 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
INDRADHANU PHASE-1INDRADHANU Phase-I330CompletedMay 2015Late, Mar 2017

How this compares with Solapur

65%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one moved by 35 months
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep INDRADHANU-Phase-IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Laxmi Peth550+ in Solapur

2 kmINDRADHANU-Phase-IVCompleted 21Lapsed / revoked 15Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: M/S Ganesh Ramchandra Apte

M/S Ganesh Ramchandra Apte has 8 registrations on MahaRERA, including INDRADHANU Phase-3 and INDRADHANU-Phase-2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if INDRADHANU-Phase-IV is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INDRADHANU-Phase-IV?

The registered promoter entity is M/S Ganesh Ramchandra Apte, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INDRADHANU-Phase-IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INDRADHANU-Phase-IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INDRADHANU-Phase-IV?

The professionals named in the filing: Architect: AR. Vidya Mahendra Akkalkote; Architect: Zeeshan E Mundewadi; Engineer: STRUDCOM CONSULTANTS PVT LTD; Engineer: Abhishek Nitin Apte; Engineer: AMOL MEHTA; Engineer: Saqlain Imamuddin Shaikh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INDRADHANU-Phase-IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INDRADHANU-Phase-IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INDRADHANU-Phase-IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.