Home / Browse projects / Solapur, Maharashtra / SAMARTH PRASAD

Registered No litigation declared Mixed project

SAMARTH PRASAD

By JJRV INFRA PRIVATE LIMITED

RG-MH-94727 · RERA PM1320002500526 · Last updated on MahaRERA portal: 16 Sep 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 4 months from the original
2 of 9Construction stages donefurthest along: Basement (if any), 0%
56 of 76Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 18 documents Report an error

SAMARTH PRASAD is a Mixed project by JJRV INFRA PRIVATE LIMITED in Solapur, Maharashtra, registered with MahaRERA as PM1320002500526 on 11 Aug 2025. Possession is promised by 1 Dec 2030. The completion date has moved by 4 months from the original filing. 20 of the 76 units on this registration are recorded sold or booked, and 2 of 9 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSAMARTH PRASAD
  • TypeMixed
  • Location
    • NEHRU NAGAR
    • SOLAPUR
    • Solapur (M Corp.)
    • Solapur North
    • 413004
  • Pincode413004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1320002500526
  • ReraGenie IDRG-MH-94727

Builder

  • NameJJRV INFRA PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309MH2019PTC325185
  • GSTIN27AAECJ5538M2Z2
  • DirectorsVIVEK HARIDUTT DIXIT, NIKHIL SURYANATH PANDEY, SHILPA VIVEK DIXIT

Key dates

this monthRegisteredAug 2025First promiseAug 2030Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2025
  • Promised completion1 Dec 2030
  • Revised completionRevised to 1 Dec 2030 (originally 1 Aug 2030)
  • Buildings1 building record
  • Documents filed18 files

Current status

26%20 of 76 units booked
9.1%Work done, per cost certificate

Figures as on 16 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A buildingNA87383876

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 9 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

A building: 22% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed111

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots111
Podiums / Upper Parking Floor111

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,931 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jul 2025

Approvals and building plan

Sanctioning authoritySOLAPUR MUNICIPAL CORPORATION
Permissible FSI5139.87
Proposed, not sanctioned5,140 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG1 GROUND FLOOR TRANS AVENUE, BEHIND VERSOVA MHADA TELEPHONE EXCHANGE, ANDHERI WEST
Estimated costRs 13.11 cr
Cost incurredRs 1.20 cr
Work done9.12%
BuildingWingEstimatedIncurred
A buildingNARs 13.11 crRs 1.20 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL KHAMITKAR
EngineerAAKASH PUJARI
EngineerJAYESH HULAGBALI
Chartered Accountantsr marda and co
Chartered AccountantAAQUIB PATEL
PartnerRole in project
JJRV INFRA PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PM1320002500526/WarAug 2030 → Dec 2030

Reason as filed by the promoterNA

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500165Ram GawaliJJRV INFRA PRIVATE LIMITED11/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2030

Documents filed18

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RAHUL KHAMITKAR ARCH SIR.pdf16 Sep 2026
Withdrawal Update Form 2File: JAYESH ENG SIR.pdf16 Sep 2026
Withdrawal Update Form 3File: CA PATEL SIR.pdf16 Sep 2026
Withdrawal Update Form 1File: RAHUL KHAMITKAR ARCH SIR.pdf3 Aug 2026
Withdrawal Update Form 2File: JAYESH ENG SIR.pdf3 Aug 2026
Withdrawal Update Form 3File: FORM-3 FOR Q4.pdf3 Aug 2026
Withdrawal Update Form 1File: FORM 1 FOR Q4.pdf18 Apr 2026
Withdrawal Update Form 2File: FORM 2 FOR Q4.pdf18 Apr 2026
Withdrawal Update Form 3File: FORM-3 FOR Q4.pdf18 Apr 2026
Form 2A (FY 2025-2026)File: FORM 2A FOR Q4.pdf18 Apr 2026
Withdrawal Update Form 1File: FORM-1-Q2.pdf27 Feb 2026
Withdrawal Update Form 1File: FORM-1-Q3.pdf27 Feb 2026
Withdrawal Update Form 2File: FORM-2-Q2.pdf27 Feb 2026
Withdrawal Update Form 2File: FORM-2-Q3.pdf27 Feb 2026
Withdrawal Update Form 3File: FORM-3-Q2.pdf27 Feb 2026
Withdrawal Update Form 3File: FORM-3-Q3.pdf27 Feb 2026
Declaration and undertaking (Annexure A)File: ANN A DECLARATION.pdf26 Jul 2025
Building plan approvalFile: PLANS.pdf24 Jul 2025

How this compares with Solapur

26%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one moved by 4 months
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep SAMARTH PRASAD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SOLAPUR550+ in Solapur

2 kmSAMARTH PRASADCompleted 10Lapsed / revoked 13Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: JJRV INFRA PRIVATE LIMITED

JJRV INFRA PRIVATE LIMITED has 1 registration on MahaRERA, including SAMARTH PRASAD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if SAMARTH PRASAD is delayed beyond 1 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMARTH PRASAD?

The registered promoter entity is JJRV INFRA PRIVATE LIMITED, a company as per the filing. Its CIN U45309MH2019PTC325185 and GSTIN 27AAECJ5538M2Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMARTH PRASAD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAMARTH PRASAD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAMARTH PRASAD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMARTH PRASAD?

The professionals named in the filing: Architect: RAHUL KHAMITKAR; Engineer: AAKASH PUJARI; Engineer: JAYESH HULAGBALI; Chartered Accountant: sr marda and co; Chartered Accountant: AAQUIB PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMARTH PRASAD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMARTH PRASAD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMARTH PRASAD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.